Asphalt Paving Program 2008 AcceptanceTHE CITY OF Dubuque DT '~~ ~ All-America City ~J 1 Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2008 Asphalt Paving Program (CIPs 3501866, 3902007, 3001972) DATE: December 1, 2009 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2008 Asphalt Paving Program, as completed by River City Paving, Inc., a Division of Mathy Construction, Inc., in the final contract amount of $226,131.41, which is an 8.5% increase from the original contract in the amount of $208,354.63. The majority of this increase is due to additional tonnage of asphalt required at Eagle Point Park. concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DT '~~ ~ All-America City V Masterpiece an the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: November 24, 2009 SUBJECT: 2008 Asphalt Paving Program (CIPs 3501866, 3902007, 3001972) INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 2008 Asphalt Paving Program. DISCUSSION The 2008 Asphalt Paving Program included the following overlay improvements: - Resurfacing of the main roadway and parking areas of Eagle Point Park. - Milling and resurfacing of the parking lot adjacent to the Jet Center at the Dubuque Regional Airport. It also included the replacement of the entrance drive to the Jet Center and expansion of parking on the south and east portions of the upper parking lot adjacent to the Jet Center. HMA full-depth patching along the curb of Hill Street at several locations between 3`d Street and Solon Street. DISCUSSION The 2008 Asphalt Paving Program was completed by River City Paving, Inc., a Division of Mathy Construction, Inc. of Dubuque, Iowa, in the final contract amount of $226,131.41, which is a 8.5% increase from the original contract in the amount of $208,354.63. The majority of this increase is due to additional tonnage of asphalt required at Eagle Point Park. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $226.,131.41. BUDGET IMPACT The estimate of probable cost for the 2008 Asphalt Paving Program is as follows: Award Construction Contract $ 208,354.63 Contingency 18,538.60 Construction Engineering & Inspection 20,392.46 $247,285.69 The project funding summary is as follows: CIP No. Fund Description 3501866 Eagle Point Park -Overlay Main Road 3902007 Asphalt Pavement Maintenance for Parking Lots 3001972 2009 Annual Street Program Total Project Funding ACTION TO BE TAKEN Final $ 226,131.41 0 21,793.89 $247,925.30 Fund Amount $ 146, 006.37 94,141.26 7,777.67 $247,925.30 The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $226,131.41 to River City Paving, Inc., a division of Mathy Construction, Inc., for the 2008 Asphalt Paving Program. Prepared by Jon Dienst, Civil Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Operations & Maintenance Supervisor Bob Green, Water Department Manager Gil Spence, Leisure Services Manager Todd Dalsing, Dubuque Regional Airport Bob Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer II RESOLUTION NO. 446-09 ACCEPTING THE 2008 ASPHALT PAVING PROGRAM AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 2008 Asphalt Paving Program (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Eagle Point Park -Overlay Main Road fund, Asphalt Pavement Maintenance for Parking Lots fund and 2009 Annual Street Program fund appropriation for the contract amount of $226,131.41 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this nth day of DeCemb~, 2009. Roy D. Buol, Mayor Attest: eanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2008 ASPHALT PAVING PROGRAM The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2008 Asphalt Paving Program, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $247,925.30. Dated this~~day of~ 009. City Engineer Filed in the office of the City Clerk on the ~~day of,~~p~2009 i anne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: November 30, 2009 PROJECT NAME: 2008 Asphalt Paving Program CONTRACTOR: River City Paving, a division of Mathy Contruction UNIT UNIT COST QUANTITY AMOUNT EARNED BID ITEM DESCRIPTION TO DATE TO DATE HMA PAVEMENT.. ' __ __ _ _ .. ,_ 1 Graded Stone Base Ton $ 14.20 91.16 $ 1,294.47 2 3" Crushed Stone Base Ton $ 14.75 14.93 $ 220.22 3 Excavation, Unclassified CY $ 5.75 275.00 $ 1,581.25 4 HMA Full Depth Repair Hand Patches SY $ 62.95 99.11 $ 6,238.97 5 HMA 300k Wedge 8 Leveling Courses, 1/2" (PG 64-22) Ton $ 61.79 442.00 $ 27,311.18 6 HMA 300k, I, 1/2" (PG 64-22) Ton $ 58.32 140.45 $ 8,191.04 7 HMA 300k, S, 1/2" (PG 64-22) Ton $ 57.94 1373.22 $ 79,564.37 8 HMA Hand Patching Ton $ 90.00 300.17 $ 27,015.30 9 HMA Pavement Scarification -Full Size SY $ 9.71 1929.81 $ 18,738.46 10 HMA Sawcut LF $ 2.25 1509.00 $ 3,395.25 11 Cleaning and Preparation of Base SY $ 0.92 13300.00 $ 12,236.00 12 Adjustment of Fixtures Manhole Each $ 385.00 5.00 $ 1,925.00 13 Adjustment of Fixtures Water Valves/Monitor wells Each $ 340.00 3.00 $ 1,020.00 14 Adjustment of Fixtures Catch Basin Top Each $ 1,145.00 1.00 $ 1,145.00 15 Reconstruction of Catch Basin Top Each $ 160.00 2.00 $ 320.00 PC GONCRETE PAVEMENT _ 16 Remove and Reolacement of PC Concrete Curb & Gutter 17 PC Concrete Sidewalk - 4" Remove & Construct 18 PC Concrete Pavement (8") Class C w/cd baskets 19 PC Concrete Full Depth Repair Patches LF $ 33.00 $ - SF $ 4.50 1277.50 $ 5,748.75 SY $ 50.10 79.00 $ 3,957.90 SY $ 54.25 187.00 $ 10,144.75 E MISCELLANEOUS 20 Backfill Topsoil SY $ 4.00 $ - 21 Sod SY $ 5.00 $ - 22 Flagger Day $ 285.00 12.00 $ 3,420.00 23 Traffic and Safety Control LS $ 3,875.00 1.00 $ 3,875.00 24 Tree Preservation LS $ 500.00 1.00 $ 500.00 25 Mobilization LS $ 5,300.00 1.00 $ 5,300.00 __ _ ._ _ - - --~ ! : FCH4,,~VGE O. DE ,,,.EXTRA LVORK ITEMS PC Concrete Sidewalk - 6" Remove & Construct Cost Differential Add Manhole Ring & Cover Add Uooer Section Water Valve TOTAL AMOUNT EARNED TO DATE -BASE BID: $ 223,142.91 SY $ ~. 1.40 _:_ ... 1277.50 $ 1,788.50 Each $ 350.00 3.00 $ 1,050.00 Each $ 75.00 2.00 $ 150.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS:. $ 2,988.50 TOTAL AMOUNT EARNED TO DATE: $ 226,131.41 TOTAL DUE CONTRACTOR: $ 226,131.41 ENGINEERING: $ 21,793.89 TOTAL CONSTRUCTION COST: $ 247,925.30 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount II work required to complete the above improvement. APPROVED: Michael Van Millig ity an City of Dubu e~ APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, River City Paving- Div. Of Mathy Construction contractor for the above improvement, does hereby accept the above "Total Due Contractor', as full settlement for all claims for said improvement. CONTRACTOR: River Cit Pavi -Div. Of Math Construction BY: TITLE: ~~ /J, ~~//~yy~~L DATE: ~ ~~Z ~/~,