Loading...
Foye Street Sidewalk_Curb and Gutter Repair ProjectTHE CITY OF Dubuque DT T~ ~ All•AmericaCitY ~J 1 ~ Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Foye Street Curb & Gutter, Sidewalk Replacement Project CIP 3001226 -Curb Replacement CIP 3501425 -Sidewalk Replacement Program DATE: December 1, 2009 City Engineer Gus Psihoyos is recommending acceptance of the Foye Street Curb & Gutter, Sidewalk Replacement Project, as completed by Drew Cook & Sons Excavating, Inc., in the final contract amount of $47,821.40, which is a 3.3% increase from the original contract amount of $46,276.95. The increase in cost is primarily due to the installation of 6-inch thick sidewalk through most of the corridor versus the original 4-inch thick sidewalk. The thickness was increased to minimize damage to the walks and the curb of the narrow street. I concur with the recommendation and respectfully request Mayor and City Council approval. ichael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney , Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY CAF Dubuque AllAll-Am~, ~I ~~- ~1/Ir~ster~~ece on tl~e Mzsszssxppt zooz TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: November 24, 2009 SUBJECT: Foye Street Curb & Gutter, Sidewalk Replacement Project CIP 3001226 -Curb Replacement CIP 3501425 -Sidewalk Replacement Program INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Foye Street Curb & Gutter, Sidewalk Replacement Project. BACKGROUND The Foye Street Curb & Gutter, Sidewalk Replacement Project provided for the installation of curb, sidewalk, and pedestrian access ramps along Foye Street. The project was awarded based on a competitive quotation process for public improvements in accordance with Iowa Code, Section 26.14. DISCUSSION The Foye Street Curb & Gutter, Sidewalk Replacement Project was completed by Drew Cook & Sons Excavating, Inc. of Dubuque, Iowa, in the final contract amount of $47,821.40, which is a 3.3% increase from the original contract amount of $46,276.95. The increase in cost is primarily due to the installation of 6-inch thick sidewalk through most of the corridor versus the original 4-inch thick sidewalk. The thickness was increased to minimize damage to the walks and the curb of the narrow street. RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the contract amount of $47,821.40 to Drew Cook & Sons Excavating, Inc. for the Foye Street Curb & Gutter, Sidewalk Replacement Project. RESOLUTION NO. 447-09 ACCEPTING THE FOYE STREET CURB & GUTTER, SIDEWALK REPLACEMENT PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Foye Street Curb & Gutter, Sidewalk Replacement Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Curb Replacement Capital Improvement Project and the Sidewalk Replacement Program Capital Improvement Project appropriations for the contract amount of $47,821.40 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 7th day of December D. Buol, Mayor Attest: eanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE FOYE STREET CURB & GUTTER, SIDEWALK REPLACEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the, that the Foye Street Curb & Gutter, Sidewalk Replacement Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $52,382.80. Dated this.~~ day of~~~'~~~ 2009. City Engi eer Filed in the office of the City Clerk on thee'' ,day of ~ 2009. eanne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division COUNCIL FINAL PAYMENT FORM PARTIAL PAYMENT NO: COUNCIL FINAL PROJECT NAME: Foye Street Curb & Gutter, Sidewalk Replacement Project DATE: November 13, 2009 CONTRACTOR: Drew Cook and Sons Excavating, Inc CONTRACT AMOUNT: $48,278.95 ED AM BID ITEM DESCRIPTION UNIT UNIT COST ~ O DATE TO DATE _. _ DEJyIOLITl4N & R~9..P,L~ ~ ~ _ __ r .. , _ - ? _. l PC Concrete Sidewalk, Remove SF $1.20 3205.60 $ 3,846.72 Curb & Gutter, Remove, Regardless of Type LF $9.00 1081.00 $ 9,729.00 Pavement Removal CY $150.00 7.00 $ 1,050.00 ~ a V = t ' ~ ~ - GA S~H~;GTlON i3 Graded Stone Base TON $15.50 170.55 $ 2,643.53 PC Concrete Sidewalk, 4" Construct SF $2.65 616.00 $ 1,632.40 Reinforcing steel, #4 grade 60, furnish and install LF $0.50 3870.00 $ 1,935.00 PC Concrete Sidewalk, 6" Construct with rebar SF $3.45 2552.75 $ 8,806.99 PC Concrete Curb & Gutter, 2.5' construct with rebar LF $12.40 901.00 $ 11,172.40 PC Concrete Access Ramp Delectable Warning Area (Each = 2' x 4' area) Each $110.00 5.00 $ 550.00 Backfill, Topsoil SY $18.00 117.86 $ 2,121.48 Sod SY $9.00 90.09 $ 810.81 Traffic Control & Safety Control LS $1,000.00 1.00 $ 1,000.00 Erosion Control LS $475.00 1.00 $ 475.00 Mobilization & Miscellaneous LS $1,000.00 1.00 $ 1,000.00 TOTAL AMOUNT EARNED TO DATE: $ 46 773.32 C1 1"clean stone Ton $14.00 14.47 $ 202.58 C2 4" Drain Tile LF $1.00 158.00 $ 158.00 C3 Asphalt Driveway Patch Ton $100.00 6.00 $ 600.00 C4 Seed SY $0.35 250.00 $ 87.50 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 1 048.08 TOTAL AMOUNT EARNED TO DATE: $ 47 821.40 TOTAL DUE CONTRACTOR: $ 47,821.40 ENGINEERING: $4,561.40 TOTAL CONSTRUCTION COST: $52,382.80 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all w r required to complete the above improvement. APPROVED: Michael Van Milligen, C' City of Du , I a APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Drew Cook & Sons Excavating, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR:~J (~ ~'~ ~//~ ~~ ~c"~ ~L~ TITLE: ~C_c`L~- ltt/~e_Sc<~~-vc,~ DATE: ~ ~ - 7. c~ - (~(