Loading...
Garfield Avenue Retaining Wall Repair at 1695THE CITY OF DUbUgU@ DT '~~ ~ All-AmericaCitY ~J Masterpiece on the Mississippi d 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 1695 Garfield Avenue Retaining Wall Repair Project CIP 1002087 DATE: December 1, 2009 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 1695 Garfield Avenue Retaining Wall Repair Project, as completed by Top Grade Excavating, Inc., in the final contract amount of $87,601.19, which is an 80.2% increase from the original contract amount of $48,603.49. The original engineer's estimate for this project was $95,000. The increase from the contract amount was due to the discovery that the foundation of the existing home at 1695 Garfield Avenue below grade level consisted of concrete cinder blocks sitting on a sand soil, instead of what was originally assumed to be a poured concrete foundation. Due to the discovery, there was great concern by Engineering staff that excavating and removing the entire existing limestone retaining wall would cause the house foundation to settle. After reviewing various options, it was determined that the most cost-effective solution was to construct a completely new reinforced concrete wall on the outside the existing limestone wall. The new concrete wall was constructed with concrete form liners and integral colored concrete to simulate a limestone wall. The house foundation was sealed with a waterproofing agent to prevent any possible water seepage as a result of the construction of the retaining wall. I concur with the recommendation and respectfully request Mayor and City Council approval. ichael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DU b U q Ue DT T~ ~ All-AmericaC~y ~J ' ~ Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: November 25, 2009 SUBJECT: 1695 Garfield Avenue Retaining Wall Repair Project CIP 1002087 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 1695 Garfield Avenue Retaining Wall Repair Project. BACKGROUND The 1695 Garfield Avenue Retaining Wall Repair Project provided for the reconstruction of a 10-foot high limestone retaining wall. The project was designed by IIW Engineers and Surveyors to utilize the salvaged stone from the existing wall and included new geofoam and clean stone backfill along with new limestone where needed. All turf areas and sidewalk that were disturbed during the project were replaced. Also the existing roof drains of the abutting home were tied into the foundation drain of the wall. DISCUSSION The 1695 Garfield Avenue Retaining Wall Repair Project was completed by Top Grade Excavating, Inc. of Epworth, Iowa, in the final contract amount of $87,601.19, which is an 80.2% increase from the original contract amount of $48,603.49. The original engineer's estimate for this project was $95,000. During the de-construction of the existing limestone wall, it was discovered that the foundation of the existing home at 1695 Garfield Avenue consisted of concrete cinder blocks sitting on a sand soil. During the design of the retaining wall, it was assumed that the house foundation was a poured concrete foundation since a concrete foundation was exposed from the exterior of the home. Engineering and IIW staff also investigated the interior of the home prior to construction to determine the condition of the foundation. The interior of the basement is finished off with paneling and therefore staff were unable to determine the condition of the foundation. Since the foundation was discovered to be concrete cinder blocks below the existing grade and that they were sitting on sand, there was great concern by Engineering staff that excavating and removing the entire existing limestone retaining wall would cause the house foundation to settle. RESOLUTION NO. 448-09 ACCEPTING THE 1695 GARFIELD AVENUE RETAINING WALL REPAIR PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 1695 Garfield Avenue Retaining Wall Repair Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Garfield Wall appropriations for the contract amount of $87,601.19 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this nth day of Decembe UC Roy D. Buol, Mayor At st: ~~ eanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 1695 GARFIELD AVENUE RETAINING WALL REPAIR PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 1695 Garfield Avenue Retaining Wall Repair Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $104,423.16. Dated thi~2~ day ofr,~~Cpl~~iL , 2009. City Engineer Filed in the office of the City Clerk on the~~~' day of , 2009. anne F. Schneider, CMC, City Clerk THE CITY OF DUB E Masterpiece on the Mississippi PARTIAL PAYMENT NO: COUNCIL FINAL PROJECT NAME: 1695 Garfield Avenue Retaining Wall Repair DATE: November 13, 2009 CONTRACTOR: Top Grade Excavating, Inc. CONTRACT AMOUNT: 548,803.49 BID ITEM DESCRIPTION UNIT UN T OST (TO DATE AMO O DATENED RETAINING WALL REPAIR 1 Mobilization 8 Miscellaneous LS $4,000.00 1.00 $ 4,000.00 2 Waterproofing LS $1,830.00 1.00 $ 1,830.00 3 Traffic Control LS $950.00 1.00 $ 950.00 4 Structural Removal LS $7,000.00 1.00 $ 7,000.00 5 Excavation, Unclassified CY $35.61 337.00 $ 12,000.57 6 Engineered Fill TON $13.26 0.00 $ - 7 Geofoam Fill -Install Only CY $24.86 30.26 $ 752.26 8 Topsoil CY $42.59 70.00 $ 2,981.30 9 Engineered Fabric SY $4.10 170.00 $ 697.00 10 4" PCC Sidewalk SF $4.24 555.00 $ 2,353.20 11 4" Perforated CPE Drain Tile LF $31.44 0.00 $ 12 4"CPE Riser LF $34.63 0.00 $ 13 Drain Outlet EA $200.00 2.00 $ 400.00 14 Limestone (Salvaged) SF $2.38 0.00 $ 15 Limestone (New) SF $33.33 0.00 $ - 16 Chain Link Fence LF $20.33 135.25 $ 2,749.63 17 Drainage Material TON $18.81 90.23 $ 1,697.23 18 Seed, Fertilizer and Mulch SY $2.00 175.00 $ 350.00 TOTAL AMOUNT EARNED TO DATE: $ 37 761.19 CHANGE ORDER -EXTRA WORK ITEMS C1 PC. Concrete Wall, 8" Thick, integral color w/Foam liners CY C2 Concrete Backfill CY C3 Concrete Footing CY C4 P.C. Concrete Curb 8 Gutter, 2.5' LS C5 P.C. Concrete Handicap Ramp LS C6 4" Perforated CPE Drain Tile LF C7 4"CPE Riser LF City of Dubuque -Engineering Division Council Final Payment Form $725.00 47.50 $ 34,437.50 $200.00 16.50 $ 3,300.00 $375.00 25.50 $ 9,562.50 $500.00 1.00 $ 500.00 $200.00 1.00 $ 200.00 $10.00 134.00 $ 1,340.00 $10.00 50.00 $ 500.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 49 840.00 TOTAL AMOUNT EARNED TO DATE: E 87 801.19 TOTAL DUE CONTRACTOR: S 87 801.19 ENGINEERING: S 12 223.22 TOTAL CONSTRUCTION COST: E 99 824.41 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount o I work required to complete the above improvement. APPROVED: Michael Van Mi ' en, City Manag City of D Iowa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa TE OF THE CONTRACTOR The undersigned, Top Grade Excavating, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full seitle/m'ent for all claims for said improvement. CONTRACTOR: ~F~ GR~I1 KC BY: TITLE: DATE: I ~ ~' ~ r~ City Engineering staff, IIW staff and the contractor reviewed various options to stabilize the foundation. A national geotechnical engineering company was also contacted for remediation strategies on how to stabilize the soil around the foundation. It was determined that the most cost-effective solution was to construct a completely new reinforced concrete wall on the outside of the existing limestone wall. The new concrete wall was constructed with concrete form liners and integral colored concrete to simulate a limestone wall. The house foundation was sealed with a waterproofing agent to prevent any possible water seepage as a result of the reconstruction of the retaining wall. A picture of the partial deconstruction of the old wall and a picture of the new wall are attached with this memo. RECOMMENDATION recommend that the City Council accept the improvements and authorize payment of the contract amount of $87,601.19 to Top Grade Excavating, Inc. of Epworth, Iowa, for the 1695 Garfield Avenue Retaining Wall Repair Project. PROJECT COST -BUDGET IMPACT The summary of costs for the 1695 Garfield Avenue Retaining Wall Repair is summarized as follows: Construction Contract Contingency Construction Engineering & Inspection The project funding summary is as follows: CIP Fund Description 1002087 Garfield Wall ACTION TO BE TAKEN Award Final $48,603.49 $ 87,601.19 15,250.00 0 16,387.00 16,821.97 $79, 240.49 $104,423.16 Fund Amount $104,423.16 I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $87,601.19 to Top Grade Excavating, Inc. for the 1695 Garfield Avenue Retaining Wall Repair Project. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Rich Russell, Building Services Manager