Loading...
Ramona_Pamela Court Slab Replacement ProjectTHE CITY OF Dubuque DT T~ ~ All•AmericaCity ~J 1 Masterpiece on the Mississippi n 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Ramona Street and Pamela Court, from Heritage Drive to Adeline Street, Panel Replacement Project CIP 3001819 -Ramona/Pamela Joint Repair CIP 3002024 -Ramona & Pamela Court Resurfacing DATE: December 1, 2009 City Engineer Gus Psihoyos is recommending acceptance of the Ramona Street and Pamela Court, from Heritage Drive to Adeline Street, Panel Replacement Project, as completed by Portzen Construction, Inc., in the final contract amount of $67,773.15, which is a 1.5% decrease from the original contract amount of $68,820.00. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE ~IT`1' ~fi ~ Dubuque as~erp~ece on the 1Vlxssxsszppi All-America City ' I I' I I Zoos TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer ~~ DATE: November 25, 2009 SUBJECT: Ramona Street and Pamela Court, from Heritage Drive to Adeline Street, Panel Replacement Project CIP 3001819 -Ramona/Pamela Joint Repair CIP 3002024 -Ramona & Pamela Court Resurfacing INTRODUCTION The purpose of this memo is to recommend acceptance of the public improvements and authorize payment to the contractor for the Ramona Street and Pamela Court, from Heritage Drive to Adeline Street, Panel Replacement Project. BACKGROUND The first phase of the Ramona Street and Pamela, from Heritage Drive to Adeline Street Court, Panel Replacement Project provided for the replacement of existing concrete mainline street panels from the intersection of Mount Loretta to Adeline Street. The panels are deteriorating along the transverse and longitudinal joints from the intersection of Mount Loretta to Adeline Street and from Adeline Street to Heritage Drive. The second phase from Adeline Street to Heritage Drive will begin after the end of the 2010 school year. DISCUSSION The Ramona Street and Pamela Court, from Heritage Drive to Adeline Street, Panel Replacement Project was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $67,773.15, which is a 1.5% decrease from the original contract amount of $68,820.00. RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the contract amount of $67,773.15 to Portzen Construction, Inc. for the Ramona Street and Pamela Court, from Heritage Drive to Adeline Street, Panel Replacement Project. BUDGET IMPACT The cost summary for the Ramona Street and Pamela Court, from Heritage Drive to Adeline Street, Panel Replacement Project is as follows: Award Final Construction Contract $ 68,820.00 $ 67,773.15 Contingency 6,882.00 0 Construction Engineering & Inspection 7,570.20 3,340.64 Total Project Cost $ 83,272.20 71 113.79 The project funding summary is as follows: CIP Fund Description Fund Amount 3001819 Ramona/Pamela Joint Repair $50,000.00 3002024 Ramona & Pamela Court Resurfacing $21,113.79 Total Project Funding 71 113.79 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $67,773.15 to Portzen Construction, Inc. for the Ramona Street and Pamela Court, from Heritage Drive to Adeline Street, Panel Replacement Project. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street Maintenance Supervisor RESOLUTION NO. 449-09 ACCEPTING THE RAMONA STREET AND PAMELA COURT, FROM HERITAGE DRIVE TO ADELINE STREET, PANEL REPLACEMENT PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Ramona Street and Pamela Court, from Heritage Drive to Adeline Street, Panel Replacement Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Ramona/Pamela Joint Repair Capital Improvement Project and the Ramona & Pamela Court Resurfacing Capital Improvement Project appropriations for the contract amount of $67,773.15 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 7th Atte t: anne F. Schneider, CMC, City Clerk day of December 2009. c> U, Roy D. Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE PAMELA COURT, FROM HERITAGE DRIVE TO ADELINE STREET, PANEL REPLACEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the, that the Ramona Street and Pamela Court, from Heritage Drive to Adeline Street, Panel Replacement Project has been performed in compliance with the terms of the Public Improvement Contract, and- that the total cost of the completed work is $71,113.79. Dated this ~VQ day of ~~~~~6~ ,.2009. Filed in the office of the City Clerk on the day %2009. J anne F. Schneider, CMC, City Clerk THE CRY OP Du$ E Masterpiece on the IvIississippi PARTIAL PAYMENT NO: COUNCIL FINAL City of Dubuque -Engineering Division COUNCIL FINAL PAYMENT FORM PROJECT NAME: Ramona Street & Pamela Court Panel Replacement DATE: November 30, 2009 CONTRACTOR: Portzen Construction, Inc.. CONTRACT AMOUNT: $86,820.00 Q AMO NED BID ITEM DESCRIPTION UNIT UNIT COST O DATE O DATE DEMOLITION'& REMOVAL 1 PC Concrete Pavement, (7"), Remove & Install SY $31.00 1872.20 $ 58,038.20 2 PC Concrete Curb & Guller, 3.5', (Remove and Construct) SY $35.00 0.00 $ 3 Fixture Adjustment Each $175.00 2.00 $ 350.00 4 Reinforcing Steel, Epoxy-covered, #5 Grade 60, Furnish and Install Each $1.50 587.00 $ 880.50 STONE' -- _.. . 5 Granular Sub-Base (as needed) TON $15.00 54.13 $ 811.95 MISCELLANOUSITEMS _ __ 8 Sawcut Pavement -Regardless of Type LF $1.75 2010.00 $ 3,517.50 7 Erosion Control -Operating Procedures LS $2,000.00 1.00 $ 2,000.00 8 Traffic Control and Safely Control LS $625.00 1.00 $ 825.00 9 Mobilization&Miscellaneous LS $1,350.00 1.00 $ 1,350.00 TOTAL AMOUNT EARNED TO DATE: $ 87,773.15 GEORD 5 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ TOTAL AMOUNT EARNED TO DATE: $ 87,773.15 TOTAL DUE CONTRACTOR: $ 87,773.15 ENGINEERING: $3,340.54 TOTAL CONSTRUCTION COST: $71,113.79 CERTIFICATE OF THE CITY MANAGER: 1 hereby certify that the above statement shows in detail the correct amount of all work e ' ed to complete the above improvement. APPROVED: Michael Van Millige tty"'I~lan City of Dubu a APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Portzen Construction, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: Portzen Cons uction, I c. ~~ f BY: TITLE: President DATE: 11 /30/2009