Loading...
West 32nd Street Detention Basin Project AcceptanceTHE CITY OP Dubuque DT TR ~ All-AmericaCity ~J ,~ 1 Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: West 32nd Street Detention Basin Project (CIP 7201357) DATE: December 1, 2009 City Engineer Gus Psihoyos is recommending acceptance of the West 32nd Street Detention Basin Project, as completed by Tschiggfrie Excavating Co., in the final contract amount of $1,711,836.54, which is a 7.44% increase from the original contract of $1,593,371.25. This increase is attributed to the following additions: 1) 2,200 foot long six-foot wide sidewalk installation along West 32nd Street; 2) parking lane for four vehicles along W. 32nd Street; 3) stone shoulder installation where no curb and gutter existed along W. 32nd Street; and 4) a gate structure to allow for the planned maintenance of the wet pond. concur with the recommendation and respectfully request -Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque ~T '~~ ~ All•AmericaCity ~J o Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: November 24, 2009 SUBJECT: West 32"d Street Detention Basin Project (CIP 7201357) INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the West 32"d Street Detention Basin Project. DISCUSSION The West 32"d Street Detention Basin Project included the: excavation of approximately 105,000 cubic yards of soil; construction of an earthen embankment; installation of a large diameter storm sewer--96 feet of 108-inch diameter, 190 feet of 96-inch diameter, and 235 feet of 66-inch diameter RCP; installation of 328 feet of 24-inch diameter DIP sanitary sewer; and construction of a twin, 9-foot wide by 8-foot high box culvert to replace the bridge just east of Wildwood. DISCUSSION The West 32"d Street Detention Basin Project was completed by Tschiggfrie Excavating Co. of Dubuque, Iowa, in the final contract amount of $1,711,836.54, which is a 7.44% increase from the original contract of $1,593,371.25. Of the $118,465.29 contract increase, $117,046.48 can be attributed to the following additions: 1) 2,200 foot long six-foot wide sidewalk installation along West 32"d Street; 2) parking lane for four vehicles along W. 32"d Street; 3) stone shoulder installation where no curb and gutter existed along W. 32"d Street; and 4) a gate structure to allow for the planned maintenance of the wet pond. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $1,711,836.54. BUDGET IMPACT The total cost for the West 32"d Street Detention Basin Project is as follows: Estimate Award Final Construction Contract $1,820,920.00 $1,593,371.25 $1,711,836.54 Contingency 109,255.23 109,255.23 Engineering 270,224.60 270,224.60 302,040.36 Property Acquisitions 2,088,409.02 2,088,409.02 2,144,712.22 $4,288,809.35 $4,061,260.10 $4,158,589.12 The project funding summary is as follows: CIP No. Fund Description Fund Amount 7201357 W 32nd Street Detention Basin Project $4,023,000.00 7201368 Clifford-Rosemont Storm Sewer 111,109.12 7101289 General Sanitary Sewer Repairs $ 24,480.00 Total Project Funding $4,158,589.12 Spot repairs have corrected the identified Clifford-Rosemont storm sewer deficiencies. The total replacement of the aging Clifford-Rosemont storm sewer will be considered when preparing future capital improvement budgets. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $1,711,836.54 to Tschiggfrie Excavating Co. for the West 32"d Street Detention Basin Project. Prepared by Deron Muehring, Civil Engineer cc: Jenny Larson, Budget Director Ken Tekippe, Budget Director Bob Schiesl, Assistant City Engineer Tom Freund, Engineering Technician RESOLUTION NO. 450-09 ACCEPTING THE WEST 32ND STREET DETENTION BASIN PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the West 32"d Street Detention Basin Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the West 32"d Street Detention Basin Project fund, Clifford-Rosemont Storm Sewer fund, and General Sanitary Sewer Repairs fund appropriations for the contract amount of $1,711,836.54 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with tie provisions of Iowa Code chapter 573. Passed, approved and adopted this nth day of December~2009. Roy D. Buol, Mayor Atte t: anne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE WEST 32ND STREET DETENTION BASIN PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the West 32"d Street Detention Basin Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $4,158,589.12. Dated this ~~~ day of E F. ~ , 2009. City Engineer Filed in the office of the City Clerk on th - day ~~c%2009. anne F. Schneider, CMC, City Clerk THE CTIY OF _ DUB E Masterpiece on the 1vIississipp City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563) 589-4270 PROJECT CLOSE OUT FORM Project Name: West 32nd Street Detention Facilit Storm Water Control Project CIP Number: 7201357 Project Contract Amount: $1,560,371.25 Project Com letion Date: 1-Jun-o9 Contractor Name: Tschiggfrie Excavating Contractor Address: 425 Julien Dubuque Drive City, State, Zip: Dubu ue, Iowa 52003 Contractor Tele hone: 563-557-7450 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 Mobilization, Bonds, & Insurance 1 LS $ 114,823.00 1.00 $ 114,823.00 100.00°h 2 Site Demolition 1 LS $ 86,102.00 1.00 $ 86,102.00 100.00°k 3 Clearing & Grubbing (including all sizes and types of vegetation 1 LS $ 16,575.00 1.00 $ 16,575.00 100.00°~ 4 Erosion Control (including silt fence and stone weepers) 1 LS $ 14,700.00 1.00 $ 14,700.00 100.00% 5 Site Grading and Dam Construction 1 LS $ 357,210.00 1.00 $ 357,210.00 100.00°~ 6 Dam Key Trench and Excavation Below Subgrade (EBS) 8400 CY $ 7.45 1546.20 $ 11,519.19 18.41 °k 7 Upper Dam Overtopping Stabilization 5391 SY $ 11.00 5391.00 $ 59,301.00 100.00°h 8 Lower Dam Overtopping Stabilization 3161 SY $ 11.00 3366.40 $ 37,030.40 106.50% 9 Junction Structure #1 (Upper Basin) 1 LS $ 71,317.00 1.OD $ 71,317.00 100.00°~ 10 Junction Structure #2 (Lower Basin) 1 LS $ 15,360.00 1.00 $ 15,360.00 100.00% 11 Stilling Basin Structure #1 (Upper Basin) 1 LS $ 52,323.00 1.00 $ 52,323.00 100.00°~ 12 Rock Pillow under Junction Structures 150 Tons $ 14.50 620.34 $ 8,994.93 413.56% 13 Trench Cut-Off Walls 6 EA $ 2,217.00 6.00 $ 13,302.00 100.00% 14 120" Dia. RCP -Low Head Pressure Pipe 92 LF $ 637.00 94.00 $ 59,878.00 102.17°~ 15 72"Dia. RCP -Low Head Pressure Pipe 188 LF $ 373.00 776.00 $ 65,648.00 93.62°k 16 96"Dia. RCP -Low Head Pressure Pipe 188 LF $ 480.00 183.00 $ 87,840.00 97.34°k 17 72" Dia. RCP Miter Bend -Low Head Pressure Pipe 1 EA $ 4,423.00 1.00 $ .4,423.00 100.00% 18 30" Dia. RCP Storm Sewer 140 LF $ 64.00 104.00 $ 6,656.00 74.29°,G 19 15" Dia. RCP Storm Sewer 52 LF $ 46.00 99.00 $ 4,554.00 190.38°k 20 96" Dia. RCP End Section (without Pipe Grate) 2 Ea $ 4,993.00 2.00 $ 9,986.00 100.00% 21 72" Dia. RCP End Section (with Pipe Grate) 1 Ea $ 3,728.00 1.00 $ 3,728.00 100.00% 22 30" Dia. RCP Flared End Section (without Pipe Grate) 1 EA $ 564.00 1.00 $ 564.00 100.00% 23 15" Dia. RCP Flared End Section (without Pipe Grate) 1 EA $ 403.00 1.00 $ 403.00 100.00% 24 Twin 9W z 8H' Precast RCP Box Culvert 108 LF $ 996.00 108.00 $ 107,568.00 100.00% 25 Twin 9W x BH' Precast RCP Box Culvert 3:1 End Section 2 EA $ 19,652.05 2.00 $ 39,304.10 100.00 26 Storminlet-Type101-C 2 EA $ 1.00 $ 0.00% 27 Storm Inlet -Type 104-8 2 EA $ 2,777.00 2.00 $ 5,554.00 100.00% 28 Storm Manhole-5'Dia 1 EA $ 2,805.00 1.00 $ 2,805.00 100.00% 29 Sanitary Manhole - 4' Dia 3 EA $ 2,459.00 3.00 $ 7,377.00 100.00 30 24"DIP Sanitary Sewer (including bridging for box culvert) 328 LF $ 127.75 328.00 $ 41,902.00 100.00 31 End Cap for24"DIP Sanitary Sewer 2 EA $ 1,346.00 2.00 $ 2,692.00 100.00% 32 Concrete Driveway Entrance -Access Road (6" Thick) 21 SY $ 36.25 31.43 $ '1,139.34 149.67% 33 Reinforced PCC Pavement -Access Road (6.25" Thick) 752 SY $ 32.70 764.12 $ 24,986.72 101.61% 34 CABC -Access Road (4"Thick) 752 SY $ 5.40 1528.24 $ 8,252.50 203.22% 35 Access Drive Gale 1 EA $ 325.00 $ 0.00 36 ACC Pavement - W. 32nd Street Restoration (4" Thick) 370 SY $ 20.45 1042.99 $ 21,329.15 281.89% 37 CABC - W. 32nd Street Restoration (14" Thick) 370 SY $ 9.90 929.75 $ 9,204.53 251.28% 38 Rip-Rap Stabilization (Schedule A) 752 SY $ 47.10 966.63 $ 45,528.27 128.54% 39 Rip-Rap Stabilization (Schedule B) 1980 SY $ 19.10 2127.60 $ 40,637.16 107.45% 40 Landsca ing including Native Grasses, Trees, Shrubs, and Sta 1 LS $ 89,000.00 1.00 $ 89,000.00 100.00 I ungmar con~racc i ocais I y i,~~~,o ~ ~.<~ i 1 Additional Trees -Jim Sullivan Property - $1,500.00 + 10% Profit and Overhead 1.00 LS $ .1,650.00 100.00% 2 K Crete along haunches of 96" and 120" RCP - 79 CY @ $71 + 10% 1.00 LS $ 6,169.90 100.00% 3 Grading ($2,200) and overtopping (255 SY x $11.00/SY = $2,805.00) at north end of east dam 1.00 LS $ 5,005.00 100.00°k 4 Area Drain change ($2,277.00) on south side of 32nd Street with landscaping ($596.20) 1.00 LS $ 2,873.20 100.00°k 5 Over-topping to the pond at Rogers (199' x 16.67' =368.59 SY @ $11.00/SY = $4,054.49) 1.00 LS $ 4,054.49 100.00% 6 Additional ADS storm piping - 25' of 10" @ $27.50/ft and 80' of 12" @ $32.65/R + 45 degree bend 1.00 LS $ 3,299.50 100.00°k 7 Additional cost for wildflower seed ($11,311.69 x 85% as of 12-1-08 = $9,614.94) 1.00 LS $ 11,311.69 100.00% 8 Gate with operator on Junction Structure #1 1.00 LS $ 16,300.00 100.00 9 Chain Link Fence -Gale and at Headwalls 1.00 LS $ 7,980.00 100.00% 10 Sidewalk at Schreyers Building 1.00 LS $ 920.00 100.00% 11 Bollards on top Junctioon Structure #1 1.00 LS $ 1,014.00 100.00°~ 12 Extra Topsoil and Grading along Schreyer Drive 1.00 LS $ 995.00 100.00°~ 13 6" PC Reinforced Sidewalkwith 4" Base Stone 1.00 LS $ 74,391.30 100.00°~ 14 Base Stone Shoulder along W 32nd Street 1.00 LS $ 14,434.90 100.00% 15 Parkin Lane with associated curb and gutter 1.00 LS $ 11,920.28 100.00°~ Change Order Totals $ 162,319.26 Payment Totals $1,711,836.54 Total Contract Work Performed to Date: $ 1,549,517.28 Total Change Order Work Performed to Date: $ 162,319.26 Total Contract and Change Order Work Performed to Date: $ 1,711,836.54 Property Acquisitions and Miscellaneous Costs $ 2,144,712.22 Engineering $ 302,040.36 TOTAL FINAL PROJECT COSTS: $ 4,158,589.12 I hereby certify that the above statement shows, in detail, the correct The Undersigned, Sc HI6Cs~/~ ~}{cfh/i{~jA/g;~nlractor for the above amount of all work req 'red to complete the above improvement. improvement, does hereby accept the above'Total Due Contractor', as full settlement for all claims for said improve4ment. APPROVED: APPROVED: ~~~--I-l~<lcL M • ~-H-tr~ Michael Van Mil gen, City Manager Dubuque, Iowa BY: ~,,// Q~rzc ~Anay~/ ~~ ri~L4/~ Gus Psihoyos, City Engineer Dubuque, Iowa