US 52 Resurfacing Project_32nd Street to NW Arterial Acceptance Dubuque THE CITY OF ~T T~ ~ ~,J AlaAmericaCitll 1 Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: US 52 Resurfacing Project -- 32nd Street to the Northwest Arterial (C I Ps 3002025, 7201810, 3501011, 3501041) DATE: December 14, 2009 City Engineer Gus Psihoyos is recommending acceptance of the US 52 Resurfacing Project - 32"d Street to the Northwest Arterial, as completed by River City Paving, Inc., a division of Mathy Construction, Inc., in the final contract amount of $1,128,514.44, which is a 21.2% increase from the original contract in the amount of $931,239.54. The additional cost is attributed to extra milling and paving costs due to the expansion of the paving limits. During the project, the Iowa DOT was consulted about additional required milling, paving and full-depth patching. These areas included the 32"d Street intersection; additional lengths of paved shoulder; and the additional mainline milling of concrete and paving with asphalt. Also, many of the concrete panels had to be replaced due to deterioration prior to final paving. concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque -~•• ~~ DUB E AI-M~rieaCity Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer _ DATE: December 11, 2009 SUBJECT: US 52 Resurfacing Project - 32"d Street to the Northwest Arterial (C I Ps 3002025, 7201810, 3501011, 3501041) INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the US 52 Resurfacing Project - 32"d Street to the Northwest Arterial. BACKGROUND The US 52 Resurfacing Project - 32"d Street to the Northwest Arterial involved the asphalt resurfacing of US 52 (Central Avenue) and storm sewer improvements from 32"d Street to the Northwest Arterial. In addition, this project included: 1) The installation of advance warning flashers to alert traffic of the southbound traffic signals at the Northwest Arterial. These flashers are similar to the existing flashers used on US 20 by Menards. 2) Due to safety concerns, and in accordance with Envision 2010 goals, pedestrian crossing signals and a crosswalk were installed for those who use the Northwest Arterial Hike/Bike Trail. BID RESULTS The US 52 Resurfacing Project - 32"d Street to the Northwest Arterial was completed by River City Paving, Inc., a division of Mathy Construction, Inc., of Dubuque, Iowa, in the final contract amount of $1,128,514.44, which is a 21.2% increase from the original contract in the amount of $931,239.54. The additional cost is attributed to extra milling and paving costs due to the expansion of the paving limits. During the project, the Iowa DOT was consulted about additional required milling, paving and full-depth patching. These areas included the: the 32"d Street intersection; additional lengths of paved shoulder; and the additional mainline milling of concrete and paving with asphalt. Also, many of the concrete panels had to be replaced due to deterioration prior to final paving. RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the contract amount of $1,128,514.44 to River City Paving, Inc., a division of Mathy Construction, Inc., for the US 52 Resurfacing Project - 32"d Street to the Northwest Arterial. PROJECT COST -BUDGET IMPACT The summary of costs for the US 52 Resurfacing Project - 32"d Street to the Northwest Arterial is as follows: Bid Award Construction Contract $931,239.54 Contingency (10%) 69,973.39 Construction Engineering & Inspection (10%) 76,970.73 $1,078,183.66 The project funding summary is as follows: CIP No. Fund Description 3002025 Hwy 52 Resurfacing 7201810 US 52 Storm Sewer 3001011 Signalization Program 3501041 Curb/Catch Basin Replacement Total Project Funding Final $1,128,514.44 0 33,683.02 $1,162,197.46 Fund Amount $ 874,357.10 186,106.76 18,138.82 83,592.78 $1,162,197.46 The Iowa DOT will be reimbursing the City in the amount of $875,034.95 for construction costs. However, the Iowa DOT will not reimburse for construction engineering or inspection charges per the agreement signed September 12, 2008. ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $1,128,514.44 to River City Paving, Inc., a division of Mathy Construction, Inc., for the US 52 Resurfacing Project - 32"d Street to the Northwest Arterial. Prepared by Jon Dienst, PE, Civil Engineer II cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street Maintenance Supervisor Bob Green, Water Department Manager Bob Schiesl, PE, Assistant City Engineer David Ness, PE, Civil Engineer II Deron Muehring, Civil Engineer II RESOLUTION NO. 471-09 ACCEPTING THE US 52 RESURFACING PROJECT - 32ND STREET TO THE NORTHWEST ARTERIAL AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the US 52 Resurfacing Project - 32~d Street to the Northwest Arterial (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Highway 52 Resurfacing, US 52 Storm Sewer, Signalization Program, and Curb/Catch Basin Replacement appropriations for the contract amount of $1,128,514.44 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 21st day of December, Roy D. Buol, Mayor A st: ~~ Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE US 52 RESURFACING PROJECT - 32ND STREET TO THE NORTHWEST ARTERIAL The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the, that the US 52 Resurfacing Project - 32~d Street to the Northwest Arterial has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $1,162,197.46. Dated this 14th day of December, 2009. ,` City Engineer Filed in the office of the City Clerk on the 17th day of December, 2009. anne F. Schneider, CMC, City Clerk Form 640003 8-00 wd ~~ Iowa Department of Transportation ~~ CERTIFICATE of COMPLETION and FINAL ACCEPTANCE of AGREEMENT WORK COMPANY: City of Dubuque COUNTY/CITY: Dubuque ADDRESS: 50 W. 13~' Street PROJECT NO STPN-52-2(95 ), (97)--2J-31 KIND OF WORK: Pavement scarification, HMA Resurfacing, Storm Sewer Improvements AGREEMENT DATE: September 2, 2008 FIELD COMPLETION DATE: 6/30/09 This is to certify that the work covered by the above referenced agreement has been completed in accordance with said agreement and is hereby accepted, subi~final audit of costs. SIGNATURE: / .)~--~ DATE: December 10 2009 Project Engineer (Res. Construction) (Res. Maintenance)) (~~(City) (Consultant) Year *SIGNATURE: DATE: District (Construction) (Maintenance) (Local Systems) Engineer rear Approved and work accepted by the Board of Supervisors/City Council of City of Dubuque this Day of , Year SIGNATURE: Chairman/Mayor Acknowledge completion of project in accordance with referenced agreement by the Iowa Department of Transportation this Day of Year SIGNATURE: Iowa Department of Transportation *On Local State Assisted Projects District does NOT certify but acknowledges completion of project. DO NOT WRITE IN THIS BOX. CENTRAL OFFICE USE ONLY. (Check or Initial Appropriate Box) ^ Office of Audits ^Copies to District ^ Copy to Company ^ Original to Files r City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: December 9, 2009 PROJECT NAME: Hwy 52 Resurfacing Project & Storm Sewer Project 32nd Street to NW Arterial CONTRACTOR: River City Paving, a division of Mathy Construction Inc. CONTRACT AMOUNT: $931,239.54 UNIT UNIT COST ( AMO NED BID ITEM DESCRIPTION T AT O DATE TO D E ftEiw.~t'fLQ . 1 Unclassified Excavation CY $ 12.90 936.00 $ 12,074.40 2 Remove PCC Curb 8 Gutter LF $ 3.90 784.99 $ 3,061.46 3 Remove Limestone Curb LF $ 1.85 1523.85 $ 2,819.12 4 Graded Stone Base Ton $ 13.50 1061.35 $ 14,328.23 5 HMA 3M I, 1/2" (PG 64-28) - 1-1/2" Ton $ 79.95 2524.61 $ 201,842.57 6 _HMA 3M S, 1/2" (PG 64-28) - 1-1/2" Ton $ 79.95 2385.81 $ 190,745.51 7 HMA Full Depth Patching, 1/2" (PG 64-28) Ton $ 150.00 219.72 $ 32,958.00 8 HMA 3M I, 1/2" (PG 64-28), 4' Shoulder Ton $ 83.71 373.21 $ 31,241.41 9 HMA 3M S, 1/2" (PG 64-28), 4' Shoulder Ton $ 83.71 62.33 $ 5,217.64 10 HMA Surtacing of Driveways & Patches Ton $ 89.00 15.00 $ 1,335.00 11 HMA Pavement Scarification -Full Size SY $ 1.83 $ - 12 HMA Sawcut LF $ 2.10 $ - 13 Cleaning and Preparation of Base SY $ 0.65 27814.70 $ 18,079.56 14 Adjustment of Fixtures Manhole Each $ 448.05 2.00 $ 896.10 15 Adjustment of Fixtures Water ValveslMonitor Welis Each $ 218.80 10.00 $ 2,188.00 16 Adjustment of Fixtures Catch Basin Top Each $ 706.90 $ - 17 PC Concrete Pavement Scarification (2" Depth) SY $ 6.78 $ - 18 PC Concrete Pavement Full Depth Patches SY $ 57.05 226.12 $ 12,900.15 19 PC Concrete Curb and Gutter, 2.5', Construct LF $ 16.15 2249.24 $ 36,325.23 20 PC Concrete Curb Ramp, 6" SF $ 5.75 490.75 $ 2,821.81 21 PC Concrete Access Ramp, Detectable Warning Each $ 84.15 7.00 $ 589.05 22 PC Concrete Driveway, 6", Remove & Construct SY $ 47.60 $ - 23 PC Concrete Sidewalk, 4", Remove 8 Construct SF $ 5.20 660.81 $ 3,436.21 24 PCC Sawcut LF $ 2.65 341.50 $ 904 98 . RELA'~EQ,1'.~ 25 Clearing & Grubbing SF $ 0.25 25000.00 $ 6,250.00 26 Topsoil Strip, Salvage, Stockpile and Spreadino SY $ 3.10 3416.00 $ 10,589.60 27 Lime Backfill Ton $ 6.15 112.81 $ 693.78 28 Subbase (Patches) SY $ 5.50 46.55 $ 256.03 29 Patches, Full Depth Finish, By Count Each $ 215.30 8.00 $ 1,722.40 30 Patches, Full Depth Finish, By Area SY $ 55.10 602.38 $ 33,191.14 31 RCP Storm Sewer 15" LF $ 98.70 $ - 32 RCP Storm Sewer 18" LF $ 127.75 $ - 33 RCP Storm Sewer 24" LF $ 442.00 20.00 $ 8,840.00 34 RCP Storm Sewer 30" LF $ 75.95 270.50 $ 20,544.48 35 RCP Storm Sewer 36" LF $ 90.65 123.00 $ 11,149.95 36 RCP Storm Sewer 42" LF $ 115.95 232.00 $ 26,900.40 37 RCP Storm Sewer 48" LF $ 133.75 148.00 $ 19,795.00 38 Stonn Sewer, Manhole Type "M-A" 60" Each $ 3,546.15 1.00 $ 3,546.15 39 Storm Sewer, Manhole Type "M-A" 72" Each $ 4,312.20 1.00 $ 4,312.20 40 Storm Sewer, Manhole Type "M-A" 84" Each $ 6,598.50 1.00 $ 6,598.50 41 Storm Sewer, Intake RA-40 Each $ 3,491.90 7.00 $ 24,443.30 42 Storm Sewer, Intake RA-43 Each $ 5,115.05 3.00 $ 15,345.15 43 Storm Sewer, Intake RA-62 Each $ 3,726.30 1.00 $ 3,726.30 44 Storm Sewer, Intake RA-62 Modified Each $ 4,199.15 1.00 $ 4,199.15 45 Vaned Entrance Trench Drain LF $ 294.95 25.00 $ 7,373.75 46 Removal of Intakes Each $ 644.70 $ - 47 Seeding, Fertilizing & Mulching SY $ 2.25 4871.39 $ 10,960.63 48 Soil Erosion, Silt fences for ditch checks LF $ 2.25 $ - 49 Soil Erosion, Silt fence LF $ 2.25 225.00 $ 506.25 .~ '~1~FiG 4't ~ `; 50 Traffic Signal Pedestal -Precast Foundation, New Each $ 1,440.00 2.00 $ 2,880.00 51 Advanced Warning Flasher Complete Each $ 750.00 1.00 $ 750.00 52 2" SCH 40 PVC, Trenched LF $ 10.50 780.00 $ 8,190.00 53 2" HDPE Conduit, Bored LF $ 32.64 130.00 $ 4,243.20 54 7 conductor#14 IMSA 19-1 Wiring LF $ 2.72 1374.00 $ 3,737.28 55 Pavement Markings Gal $ 80.00 212.00 $ 16,960.00 56 Traffic Control & Safety Control LS $ 45,460.00 1.00 $ 45,460.00 57 Flagger Day $ 300.00 19.00 $ 5,700.00 58 Mobilization LS $ 25,746.00 1.00 $ 25,746.00 59 Existing Drain file Connection to Inlet LS $ 1,157.75 2.00 $ 2,315.50 TOTAL AMOUNT EARNED TO DATE -BASE BID: $910,890.54 .~ - , „~t HMA Pavement Scarification - (3") SY $ 2.43 19040.52 $ 46,268.46 Storm Sewer, 16" Steel Casing Pipe Bored Under Hwy LF $ 272.03 49.00 $ 13,329.47 Storm Sewer 15" RCP Class III, not under pavement LF $ 79.59 423.00 $ 33,664.46 Storm Sewer 18" RCP Class III, not under pavement LF $ 56.93 22.67 $ 1,290.49 Storm Sewer, Intake RA-5 Each $ 5,626.56 3.00 $ 16,879.67 Connect to 48" Storm Sewer Pipe LS $ 5,296.50 1.00 $ 5,296.50 Extra Traffic Handhole not shown LS $ 350.00 1.00 $ 350.00 Rock Excavation -Storm Sewer CY $ 50.00 312.58 $ 15,629.00 Remove Storm Sewer less than 30" LF $ 15.73 169.00 $ 2,658.37 Concrete Cap existing line that ran under US 52 CY $ 203.28 2.00 $ 406.56 HMA Samples LS $ 3,000.00 1.00 $ 3,000.00 PCC Scarification (Ruby - NW arterial) 3" Thick SY $ 6.80 8948.18 $ 60,847.65 PC Concrete Driveway 8" -Remove & construct SY $ 61.16 102.78 $ 6,286.02 Blading & shaping of Shoulders LS $ 2,880.00 1.00 $ 2,880.00 Shoulder Stone Ton $ 11.25 281.44 $ 3,166.20 Surtace Patching Ton $ 234.00 25.09 $ 5,871.06 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 217,823.90 TOTAL AMOUNT EARNED TO DATE: $1,128,514.44 TOTAL DUE CONTRACTOR: $1,128,514.44 ENGINEERING: $33,683.02 TOTAL CONSTRUCTION COST: $1,162,197.46 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount all work required to complete the above improvement. APPROVED: Michael Van Mil' e i y ager City of Dub u ,Iowa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: E~ .~~ BY: TITLE: ~¢j~~~¢ i!~i,'~i~2~, DATE: ply/6