Loading...
Phase 3 HMA Pavement Milling and Resurfacing Project US52, 9th-11th, White-Elm_Hearing Copyrighted May 21 , 2018 City of Dubuque Public Hearings # 13. ITEM TITLE: Phase 3 — HMA Pavement Milling and Resurfacing Project US52 /White Street(9th to 11 th Streets)and 11 th Street (White to Elm Streets) SUMMARY: Proof of publication on noticed of public hearing to consider approval of the plans, specifications, form of contract, and estimated cost for the Phase 3 — HMA Pavement Milling and Resurfacing Project US52/White Street (9th to 11 th Streets)and 11 th Street(White to Elm Streets) and the City Manager recommending approval. RESOLUTION Approval of plans, specifications, form of contract, and estimated cost for the HMA Pavement Milling and Resurfacing Project on US52 White Street from 9th to 11 th Street and on 11 th Street from White to Elm Street SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type HMA Pavement Milling and Resurfacing on US52 White City Manager Memo Street-NNM Memo Staff Memo Staff Memo Resolution Resolutions THE CTTY OF Dubuque �" ui���eNe�ary DUB E 'il��i;' Masterpiece on the Mississippi Z°°' Z°'Z 2013 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Phase 3 — HMA Pavement Milling and Resurfacing Project US 52 White Street (9�h to 11�h) and 11�h Street (White to Elm) lowa DOT Project No. NHSN-052-2 (141)-2R-31 CIP 2502274, 7101335, 7202274, 7401405 DATE: May 15, 2018 Assistant City Engineer Bob Schiesl recommends City Council approval of the plans, specifications, form of contract and estimate cost of$642,620 for the Phase 3 — HMA Pavement Milling and Resurfacing Project on US 52 White Street from 9�h to 11�h Street, and on 11�h Street from White to Elm Street. The HMA Milling and Resurfacing Project on US52 White Street and 11th Street is the 3rd phase of a 4-phase project that is a joint partnership between the City and the lowa Department of Transportation (lowa DOT). The scope of the multi-year joint pavement rehabilitation project includes the following: • Phase 1 - Central Ave (21 st to 32nd) Pavement Rehab Project (completed in 2011) • Phase 2 -White Street (11th to 21st) Pavement Rehab Project (completed in 2014) • Phase 3-White (9th to 11th), 11 th (White to Elm) Pavement Rehab(construction in 2018) • Phase 4 - Central Ave (9th to 21st) Pavement Rehab Project (construction in 2019) Through the cooperative agreement, the lowa DOT will be responsible for the eligible construction costs associated with pavement rehabilitation for the center 24 feet (12 feet in each direction from roadway centerline) and 50% of the costs associated with the pedestrian access curb ramps at all the intersection quadrants on U.S. 52 (White Street) all estimated at $163,000. The City will be responsible for the costs associated with pavement rehabilitation of the parking lanes and the costs for curb and sidewalk replacement, underground utility work, 50% of the costs associated with the pedestrian access curb ramps at all the intersection quadrants on U.S. 52 (White Street) and landscape restoration. All other associated costs, such as engineering design, contract administration, construction engineering and inspection will be funded solely with City funding. I concur with the recommendation and respectfully request Mayor and City Council approval. 1 j t.11��'GL+'t tf t� , Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Robert Schiesl, Assistant City Engineer Gus Psihoyos, City Engineer 2 THE CTTY OF Dubuque �" ai��oeNe�qh DUB E 'il��i;� Masterpiece on the Mississippi Z°°' Z°'Z 7A13 2017 TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer SUBJECT: Phase 3 - HMA Pavement Milling and Resurfacing Project US52 White Street (9�h to 11�h) and 11�h Street (White to Elm) lowa DOT Project No. NHSN-052-2 (141)--2R-31 CIP 2502274, 7101335, 7202274, 7401405 DATE: May 14, 2018 INTRODUCTION The enclosed resolution is in reference to the public hearing for the HMA Pavement Milling and Resurfacing Project on US52 White Street from 9th to 11th Street and on 11th Street from White to Elm Street. BACKGROUND The HMA Milling and Resurfacing Project on US52 White Street and 11th Street is the 3rd phase of a 4-phase project that is a joint partnership between the City and the lowa Department of Transportation (lowa DOT). The scope of the multi-year pavement rehabilitation project includes the following: • Phase 1 - Central Ave (21 st to 32nd) Pavement Rehab Project (completed in 2011) • Phase 2 -White Street (11th to 21st) Pavement Rehab Project (completed in 2014) • Phase 3 -White (9th to 11th), 11th (White to Elm) Pavement Rehab (construction in 2018) • Phase 4 - Central Ave (9th to 21st) Pavement Rehab Project (construction in 2019) DISCUSSION The Phase 3 - HMA Milling and Resurfacing Project on US52 White Street and 11th Street will provide for the following improvements: • Pavement milling on White Street, from 9�h to 11th Street and 11�h Street from White Street to Elm Street. • Transverse and longitudinal joint repair as needed. • Pavement sub-base repair and patching as needed. • Hot mix asphalt (HMA) resurfacing of both thru lanes and parking areas. • Spot curb, driveway, and sidewalk replacement. • Storm sewer improvements. • Water main replacement. • Installation of ADA pedestrian access curb ramps (4 total). Through the cooperative agreement, the lowa DOT will be responsible for the eligible construction costs associated with pavement rehabilitation for the center 24 feet (12 feet in each direction from roadway centerline) and 50°k of the costs associated with the pedestrian access curb ramps at all the intersection quadrants on U.S. 52 (White Street). The City will be responsible for the costs associated with pavement rehabilitation of the parking lanes and the costs for curb and sidewalk replacement, underground utility work, 50°k of the costs associated with the pedestrian access curb ramps at all the intersection quadrants on U.S. 52 (White Street) and landscape restoration. All other associated costs, such as engineering design, contract administration, construction engineering and inspection will be funded solely with City funding. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process May 7, 2018 Publish Notice to Bidders, Advertise for Bids May 11 , 2018 Publish Public Hearing Notice on Plans &Specifications May 11 , 2018 Public Hearing on Plans & Specifications May 21 , 2018 Receipt of Bid Proposals (Bid-Letting) May 24, 2018 Award Construction Contract (Subject to DOT Concurrence) June 4, 2018 Project Completion Date November 16, 2018 RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and estimated cost for the HMA Pavement Milling and Resurfacing Project on US52 White Street from 9th to 11th Street and on 11th Street from White to Elm Street. BUDGETIMPACT The estimate of probable cost for Phase 3 - HMA Milling and Resurfacing Project on US52 White Street and 11 th Street is as follows: Description Estimate Construction Contract $ 508,000.00 Contingency 50,800.000 Contract Admin / Construction Engineering 83,820.00 Total Project Cost $ 642.620.00 The project funding summary is as follows: CIP Fundinq Source Amount 2502274 lowa DOT Funding $ 163,000.00 2502274 Hwy 52 - White Street / 11th Street Pavement Rehab 332,620.00 7202274 Storm Sewer/ Intake Improvement 89,000.00 7101335 Sanitary Manhole Replacement 5,000.00 7401405 Water Main Replacement 53,000.00 Total Project Funding $ 642.620.00 ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and estimated cost for the Phase 3 - HMA Pavement Milling and Resurfacing Project on US52 White Street from 9th to 11th Street and on 11th Street from White to Elm Street through adoption of the attached resolution. cc: Jenny Larson, Alexis Steger, Budget Department Deron Muehring, Engineering Department Greg Doeden, Engineering Department Denise Ihrig, Brant Schueller, Water Department Ken Yanna, lowa DOT F:\PROJECTS\HWY 52-White 9th-11th and 11th White-Elm\Council &Staff Documents\Initiate RESOLUTION NO. 161-18 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE HMA PAVEMENT MILLING AND RESURFACING PROJECT ON US52 WHITE STREET FROM 9TH TO 11TH STREET AND ON 11TH STREET FROM WHITE TO ELM STREET NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the HMA Pavement Milling and Resurfacing Project on US52 White Street from 9th to 11th Street and on 11th Street from White to Elm Street, in the estimated amount $508,000.00, are hereby approved. Passed, adopted and approved this 21st day of. May 2018. Attest: Kevin S. Firnstahl, CI I`C, City Clerk Roy D. Buol, Mayor STATE OF IOWA {SS: DUBUQUE COUNTY CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: May 11, 2018, and for which the charge is $31.19. Subscribed to before me, a Notary Public in and for Dubuque County, Iowa, this day of 20 / . Notary Public in and for Dubuque County, Iowa. M,APY K WESTERMEYER Commission Number 154835 My Commission Exp. Feb. 1, 2020 CITY OF DUBUQUE, IOWA /OFFICIAL NOTICE NOTICE OF PUBLIC• HEARING ON. PLANS, II SPECIFICATIONS, FORM OF CONTRACT,' AND COST Ir0S11-!MTHIE PHASE 3 - HMA PAVEMENT MILLING AND RESURFACING PROJECT ON US52 WHITE STREET FROM I 9TH -TO 11TH STREET I AND ON 11TH STREET FROM WHITE TO ELM STREET. NOTICE IS HEREBY GIVEN: The City Coun- cil of •the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated • cost for the Phase 3 - HMA Pavement Milling and Resurfacing Pro- ject on US52 White Street from 9th to llth Streets and, on llth Street from White to Elm. Streets, in accor- dance 'with the provi- sions of Chapter, 26, Code of Iowa, at 6:00 on the 21st day of, May, 2018, in the His- tbric Federal Building Council Chambers (secqnd floor), 350 West 6th 5treet, Dubuque, Iowa. Said proposed plans, speci- fications, forrn' of ,con- tract and estimated cost are now on file, in the' office of the City Clerk 50 •W 13th St., Dubuque. At said hear- ing any interested per- son may appear and 1 file objections thereto. Written comments re- garding the above pub- lic hearings may 'be I submitted to the City Clerks Office on or be- fore said time.of public hearing. ,1 The scope of the 1 Project is as follows: • Pavement milling on White Street, from 9th • to 11th Street and llth Street from White Street to EIm Street. • Transverse and lon- gitudinal joint repair as needed. • Pavement sub -base repair and patching as 1 needed. , • Hot mix asphalt (HMA) resurfacing of both thru lanes and parking areas. • Spot curb, drivewaY, and sidewalk replace- ment. . • Storm sewer im- provements. . • Water main replace- ment. . • Installation of ADA pedestrian access curb ramps (4 total). Any visual- or hear- ing-impaired persons needing special assis- tance or persons with special accessibility needs should contact the City Clerks office at (563) 589-4100 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of 1 the City Council given on the, 7th day of May 2018. - Kevin S. Firnstahl, CMC, city Clerk 1t 5/11