Loading...
30-Inch Force Main Sanitary Sewer Project Phase I I I Award Copyrighted June 4, 2018 City of Dubuque Action Items # 3. ITEM TITLE: 30-Inch Force Main Sanitary Sewer Project Phase III Award SUMMARY: City Manager recommending award of the construction contract for the 30-Inch Force Main Sanitary Sewer Project Phase I I I to the low bidder Top Grade Excavating, Inc. RESOLUTION Awarding public improvement contract for Phase I I I of the 30-Inch Force Main Relocation Project from 7th Street to 12th Street SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type Award 30" Force Main Relocation Project-7th to 12th City Manager Memo Street-NNM Memo Staff Memo Staff Memo Resolution Resolutions THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Phase III of the 30 Inch Force Main Relocation Project from 7�h Street to 12�h Street around the former Public Works Garage Site and the Alliant Energy Site DATE: May 29, 2018 Sealed bids were received for Phase III of the 30 Inch Force Main Relocation Project from 7�h Street to 12�h Street. City Engineer Gus Psihoyos recommends award of the construction contract to the low bidder, Top Grade Excavating, Inc., in the amount of $584,117.80, which is 1 .79°k underthe estimate of probable cost. I concur with the recommendation and respectfully request Mayor and City Council approval. �� �� ��� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque � AM-A�trrea 6iry UB E � � � I� I MasterpieCe on the Mississippi Z�'�Z°'Z zo«.Zo�� TO: Michael C. Van Milligen, City Manager _._____ _,� J. FROM: Gus Psihoyos, City Engineer � ����� ' SUBJECT: Phase III of the 30 Inch Force Main Relocation Project from 7t"Street to 12t" Street around the former Public Works Garage Site and the Alliant Energy Site DATE: May 24, 2018 INTRODUCTION The attached resolution authorizes the award of the construction contract for Phase III of the 30-inch Force Main Relocation Project from 11 t" Street to 12th Street. Phase III will be constructed between 7th and 9t" Streets, on Washington St. Construction of phase III will complete the re-routing project that eliminates the piping under the former public works garage. BACKGROUND In 1969 the existing 30-inch force main was constructed from the Cedar Street lift station to the Terminal Street lift station. The route went through the former A.Y. McDonald site, the former City Public Works site, and the Alliant Energy site. During the early 1990's highway 151/61 was constructed through Dubuque. During the highway construction portions of the 30-inch force main were relocated and the portion running through the A.Y. McDonald site was abandoned. However, the portion running through the old Public Works Site and the Alliant Energy site remained in place. In October of 2011, the City experienced a significant failure in the existing force main. Two breaks occurred simultaneously, one at the former Public Works garage site and the other at the Alliant Energy site. After repairs were completed, a third break was experienced at the former Public Works garage site. The cost to repair the breaks, which occurred on the former Public works site, was significant as the site is a Super Fund Site. During the repair work corrosion of the pipe was noted and it was also found that when constructed the pipe was set on blocking prior to bedding, and the blocking was not removed. The areas of corrosion and the failed sections of pipe were near the old blocking that was found to be still in place. Soil and ground water contamination has been identified on or near the existing 30-inch force main route that may be a contributing factor to its deterioration. The adopted budget for FY2017 includes $640,683.88 for constructing the Phase II and Phase III, of the relocation project. Phase II was closed out in June of 2016, with a final cost of$406,085.44 leaving a remaining balance of $317,361 to complete Phase III. DISCUSSION With the adoption of the FY2018 Five Year Capital Improvement Program Budget, there is a $317,361 balance to continue the Relocation of the 30 inch Force Main around the former Public Works Garage Site. A description of the force main relocation is as follows: Construct Phase I: The first phase of the relocation project was completed in 2013, ahead of the intermodal project start. Construct Phase II: The second phase of the relocation project was completed in November of 2016. This phase of force main installed pipe from the Northeast corner of the 11 t" Street and Elm Street intersection, to the tie-in point near 12tn Street. Construct Phase III: Phase III is the section of force main on Washington Street, 7tn Street to 9th Street. This section was planned to be completed in conjunction with the reconstruction of Washington Street from 7t" to 9t" Streets. Phase III would also include the tie-in, at 12t" Street and 7th street. Construction of phase III will complete the re-routing project and make the new force main operational. The complete abandonment of the existing force main through the old Public Works Garage site (Jule Site) and the Alliant Energy Site will be budgeted for in the FY 2020 budget. BID RESULTS On May 24, 2018, the City received bids for Phase III of the 30-inch Force Main Relocation Project from 11 t" Street to 12t" Street. The City received bids for the project: Contractor Name Total Bid Top Grade Excavating, Inc. $584,117.80 Portzen Construction, Inc. $657,300.00 Miller Trucking and Excavating, Inc $725,325.00 Tschiggfrie Excavating, Co. $773,536.50 Top Grade Excavating, Inc. of Farley, IA submitted the low bid in the amount of $584,117.80. This amount is 1.79 % under the estimate of probable cost. 2 RECOMMENDATION I recommend that the contract for Phase III of the 30-inch Force Main Relocation Project from 11 t" Street to 12t'' Street be awarded to Top Grade Excavating, Inc. of Farley, IA, in the amount of$584,117.80. BUDGET IMPACT The estimate of probable costs for Phase III of the 30-inch Force Main Relocation Project from 11 th Street to 12th Street is as follows: Description Estimate Award Construction $597,400.00 $584,117.80 Contingency (10%) 59,740.00 59,740.00 Engineering Design and Administration (15%) 98,571.00 96 379.44 Total Construction Cost Estimate $755,711.00 $740,237.24 , The funding summary is as follows: CIP No. FY Fund Descrip#ion Fund Amount 7102413 2018 Relocation of 30" Force Main Around $317,361.78 Old Public Works Garage 3602552 2018 Washington Street Reconstruction 7th to 9th $422,875.46 Total Project Funding $740,237.24 Phase III of the 30-inch force main relocation project will be funded through the FY2018 capital improvement project appropriations in the amount of$740,237.24, as noted above. ACTION TO BE TAKEN The City Council is requested to award the contract for Phase III of the 30 Inch Force Main Relocation Project from 11 t" Street to 12th Street through the adoption of the attached resolution. Attachments cc: Jenny Larson, Budget Director William O'Brien, Water Pollution Control Manager John Klostermann, Public Works Director Todd Irwin, Engineering Technician 3 RESOLUTION NO. 177-18 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR PHASE III OF THE 30 INCH FORCE MAIN RELOCATION PROJECT FROM 7TH STREET TO 12TH STREET NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Whereas, sealed proposals have been submitted by contractors for Phase III of the 30 -inch Force Main Relocation Project from 11th Street to 12th Street, (the Project) pursuant to Resolution No. 134-18 and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 9th day of May 2018. Whereas, said sealed proposals were opened and read on the 24th day of May 2018 and it has been determined that Top Grade Excavating, Inc. of Farley, IA, with a bid in the amount of $584,117.80 is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Top Grade Excavating, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, adopted and approved this 4th day of June 2018. Attest: Ke - : n S. Firnst hl, C C, City Clerk D Roy D. Buol, Mayor