City of Dubuque Consent Items # 38.
ITEM TITLE: Bee Branch East Blum Project-Asbestos Abatement and
Lead Clean Up Project Acceptance
SUMMARY: City Manager recommending acceptance of the public
improvement contract for the Asbestos Abatement and
Lead Cleanup Project at the East Blum site as completed
by Controlled Asbestos.
RESOLUTION Accepting the Asbestos Abatement and
Lead Cleanup Project
SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt
Resolution(s)
ATTACHMENTS:
Description Type
Bee Branch East Blum Asbestos Abatement and Lead City Manager Memo
Clean Up Project Acceptance-NNM Memo
Staff Memo Staff Memo
Resolution Resolutions
Substantial Completion Certificate Supporting Documentation
Engineer's Certificate of Final Completion Supporting Documentation
THE CITY OF Dubuque
�
AIFA�erlwGh
UB E '�� III►
Masterpiece on the Mississippi Z°°'�w'2
7A13 2017
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Bee Branch East Blum Project — Asbestos Abatement and Lead Clean Up
Project Acceptance
DATE: July 31 , 2018
Project Manager Steve Sampson Brown recommends City Council acceptance of the
public improvement contract for the Asbestos Abatement and Lead Cleanup Project at
the East Blum site, as completed by Controlled Asbestos, in the final contract amount of
$31 ,990.00 and authorize the final retainage payment in the amount of$1 ,599.50 to
Controlled Asbestos.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
�� �� ���
Mic ael C. Van Milligen �� �
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Teri Goodmann, Assistant City Manager
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Steve Sampson-Brown, Project Manager
Dubuque
THE CITY OP �
D V L E AII-Ameriea City
�
, � �� ►
Miiste iece ofz the Mississi r i t m
�P �P
�
Zoo�•Zoi2
2013•2017
TO: Michael C. Van Milligen, City Manager
FROM: Steve Sampson Brown, Project Manager
DATE: July 27, 2018
SUBJECT: Bee Branch East Blum Project—Asbestos Abatement and Lead Clean Up
Project Acceptance
INTRODUCTION
The enclosed resolution provides for the acceptance of the Public Improvement
Contract for the Asbestos Abatement and Lead Cleanup Project at the East Blum Site.
BACKGROUND
As part of the City's Bee Branch Watershed Flood Mitigation Project the East Blum Site
has been identified as future outdoor recreational green space along the Lower Bee
Branch Creek. In support of this phase of the project, the City awarded Controlled
Asbestos of Des Moines, lowa the contract to remove lead and asbestos at the East
Blum Site (501 E. 15th Street).
DISCUSSION
The Asbestos Abatement and Lead Cleanup Project was completed by Controlled
Asbestos of Ankeny, lowa in the final contract amount of $31,990.00. There were no
change orders.
BUDGET IMPACT:
This project was funded by the East Blum Site Clean Up Grant through the EPA, project
number#720-2609 4X0001.
RECOMMENDATION
The City Council is requested to adopt the attached resolution to accept the Asbestos
Abatement and Lead Cleanup Project and to authorize the final retainage payment in
the amount of $1,599.50 to Controlled Asbestos of Des Moines, lowa for the Asbestos '�
Abatement and Lead Cleanup Project.
cc: Barry Lindahl, Senior Counsel
Gus Psihoyos, City Engineer
Deron Muehring, Civil Engineer
Attachments.
F:\PROJECTS\Bee Branch 5-Maintenance Facility\_Construction Admin\_Contracts&Insurance\East Blum-Asbestos and Lead Removal\City
Council Acceptance\Controlled Asbestos-Close Out Memo.docx
Page 1 of 1
Prepared by Steve Sampson Brown, Project Manager, 50 W. 13th St., Dubuque, IA 52001, 563-589-4272
Return to Kevin Firnstahl, City Clerk, 50 W. 13th St., Dubuque, IA 52001, 563-589-4100
RESOLUTION NO. 230-18
ACCEPTING THE ASBESTOS ABATEMENT AND LEAD CLEANUP PROJECT
BEE BRANCH EAST BLUM SITE PROJECT
WHEREAS, the Public Improvement contract for the Asbestos Abatement and Lead
Cleanup Project, (the Project) has been completed by the Contractor, Controlled
Asbestos (Contractor), the City Project Manager has examined the work and
recommends that the Project be accepted; and
WHEREAS, the final contract amount for the Project is $31,990.00;
WHEREAS, the Contractor has previously been paid $30,390.50, leaving a balance of
$1,599.50; and
WHEREAS, the City Council finds that the recommendation of the City Engineer should
be accepted.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved, and the Project is
hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor the balance
of the retainage of $1,599.50 as provided in Iowa Code Chapter 573, and to pay such
retainage in accordance with the provisions of Iowa Code Chapter 573.
Passed, approved and adopted this 6th day of August 2018
Attest:
KeviryS. Firnstahl,CECity Clerk
Roy D. Buol, Mayor
ISSUE DATE: April 10, 2018
Engineering Representative: Contractor:
Rose Amundson Kevin Foster
HR Green Controlled Asbestos
8710 Earhart Lane SW PO Box 489
Cedar Rapids, IA 52404 Ankeny, lowa 50021
Substantial Completion Certificate
Re: Bee Branch East Blum- Asbestos Abatement and Lead Clean Up Proiect
Project No: 720-2609 4X0001
501 East 15th Street
Dubuque, lowa 52001
Dear Rose Amundson and Kevin Foster,
In accordance with Section 1050, Article 1.14 of the General and Supplemental
Conditions and based on the site inspection by representatives from HR Green and the
Jurisdiction, this letter is a Definitive Certificate of Substantial Completion issued for the
East Blum Site Abatement for Project No. 720-2609 4X0001.
Sincerel ,
�
Steve Sam on Brown
Jurisdictional Representative
, cc: Deron Muehring
Page 1 of 1 I
'
�
I
6 i�
�
I
CITY' ENGINEER'S �CERTIFICATE OF FIN1�L COMPLET'IQN QF ASBEST�S
ABATEMENT AND LEAD CLEANUP PR4JEGT
The undersigned City Engineer c�f the City af Dubuque; lowa, hereby certifies that ! '
�
he has inspected the Asbestas Abatement and Lead Cleanup Project, and that said i '
Project has been perFarmed in comp(iance wifih the terms of the Public Improvement I
Gonfract, and that the tota# cast of the campleted work is $31,990.00. i
Dated this ���`day of �u� , 2018. '�,
� . �
,i
��
. �
� � Gus Psihayas, �Gity Engine�r � � �I;
Ifl
�
�;
Filed in the office af fihe Gifiy Clerk an fih���day af , 2018. �j
�fl
� I�
�
1
.._ . . ._ _ . _ s.� I
'�
I�evi �. Firr�stahl, C C, City Clerk j
;�
��
!1
�
�
'3
�]
;{
i�
��
�
II
a
�
�;
� li
I
,
�
;
l �
;
,
� � f �
� 9
�
{
� '�
+ G
f ��� p.
� �
� �
I �
R
; u
,