Loading...
Thomas Place Guardrail and Curbe_Gutter Replacement AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Thomas Place Guardrail and Curb and Gutter Installation Project CIP 3001027 DATE: January 11, 2010 Dubuque kigbl AlhAmedcaCity 111 I 2007 The Thomas Place Guardrail and Curb and Gutter Installation Project has been completed by Drew Cook & Sons Excavating Co., Inc. of Dubuque, Iowa, in the final contract amount of $35,547.35, which is a 9.4% decrease from the original contract amount of $39,255.00. City Engineer Gus Psihoyos is recommending that the City Council accept the improvements and establish the final contract at $35,547.35. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:Iw Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Michael C. Van Milligen Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager ,- -- FROM: Gus Psihoyos, City Engineer c DATE: January 8, 2010 SUBJECT: Thomas Place Guardrail and Curb and Gutter Installation Project CIP 3001027 INTRODUCTION Dubuque IAA w- Amedcacnr 11 11 r 2007 The enclosed resolution provides for the acceptance of the construction contract for the Thomas Place Guardrail and Curb and Gutter Installation Project. BACKGROUND The Thomas Place Guardrail and Curb and Gutter Installation Project provided for the: — Removal and replacement of approximately 270 square yards of existing asphalt pavement. — Installation of approximately 274 feet of curb and gutter. — Installation of guardrail along the east side (between 907 and 915) Thomas Place (430 feet). DISCUSSION The Thomas Place Guardrail and Curb and Gutter Installation Project has been completed by Drew Cook & Sons Excavating Co., Inc. of Dubuque, Iowa, in the final contract amount of $35,547.35, which is a 9.4% decrease from the original contract amount of $39,255. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $35,547.35. BUDGET IMPACT The total cost for the Thomas Place Guardrail and Curb and Gutter Installation Project is as follows: Construction Contract Engineering & Inspection Total Project Cost The project funding summary is as follows: CIP No. Fund Description 3001027 Guardrail Replacement Total Project Funding ACTION TO BE TAKEN Award Final $39,255.00 $35,547.35 3,925.50 3,148.70 $43,180.50 $38,696.05 Fund Amount $38,696.05 $38,696.05 I respectfully request adoption of attached resolution accepting the improvements and authorizing payment of the contract in the amount of $35,547.35 to Drew Cook & Sons Excavating Co., Inc. for the Thomas Place Guardrail and Curb and Gutter Installation Project. Prepared by Jon Dienst, PE cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street Maintenance Supervisor Bob Schiesl, Assistant City Engineer RESOLUTION NO. 13-10 ACCEPTING THE THOMAS PLACE GUARDRAIL AND CURB & GUTTER INSTALLATION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Thomas Place Guardrail and Curb & Gutter Installation Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Guardrail Replacement appropriation for the contract amount of $35,547.35 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 19 day of January, 2010. Attest: Jeanne F. Schneider, CMC, City Clerk David T. Resnick, Mayor Pro -Tenn CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE THOMAS PLACE GUARDRAIL AND CURB & GUTTER INSTALLATION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Thomas Place Guardrail and Curb & Gutter Installation Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $38,696.05. Dated this 12th day of January, 2010. Filed in the office of the City Clerk on the 14th day of January, 2010. City Engineer Jeanne F. Schneider, CMC, City Clerk Masterpiece on the Mississippi PARTIAL PAYMENT NO: COUNCIL FINAL BID ITEM DESCRIPTION C1 C2 C3 CHANGE ORDER - EXTRA WORK ITEMS City of Dubuque - Engineering Division Council Final Payment Form PROJECT NAME: THOMAS PLACE CURB & GUTTER CONTRACTOR: Drew Cook & Sons Excavating, Inc. UNIT CONTRACT UNIT COST DATE: December 28, 2009 CONTRACT AMOUNT: $39,255.00 QUANTITY TO DATE TOTAL AMOUNT EARNED TO DATE: TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: TOTAL AMOUNT EARNED TO DATE: TOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: AMOUNT EARNED TO DATE -Curb and Goodall' 1 Pavement Removal SY $5.00 270.00 $ 1,350.00 2 Excavation (Unclassified) CY $25.00 67.50 $ 1,687.50 3 Backfill Topsoil SY $25.00 67.0o $ 1,675.00 4 Remove Existing Cable Guarderail & Pipe Railing /Posts LF $3.00 300.00 $ 900.00 5 Graded Stone Base, 3/4" Ton $25.00 75.09 $ 1,877.25 6 HMA 300k Surface Course, 1/2" (PG 64 -22) Ton $110.00 26.74 $ 2,941.40 7 HMA 300k Binder Course, 1/2" (PG 64 -22) Ton $110.00 32.92 $ 3,621.20 8 PC Concrete Curb & Gutter, 2.5' Construct LF $15.50 274.00 $ 4,247.00 9 Seeding, Mulching, and Watering SY $4.00 67.00 $ 268.00 10 Guardrail Installation LF $34.00 430.00 $ 14,620.00 11 Sawcut Pavement - Regardless of Type LF $2.00 180.00 $ 360.00 12 Erosion Control Plan - Operating Procedures LS $400.00 1.00 $ 400.00 13 Traffic Control and Safety Control LS $500.00 1.00 $ 500.00 14 Mobilization LS $1,100.00 1.00 $ 1,100.00 $ 35,547.351 $ $ $ I$ 1 $ 35,547.35 1 1 $ 35,547.35 1 1 $ 3,148.70 1 $ 38,696.051 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: APPROVED: CERTIFICATE OF THE CONTRACTOR Michael Van Milligen, C City of Du e it a Gus Psihoyos, City Engineer City of Dubuque, Iowa er The undersigned, Drew Cook & Sons Excavating, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor ", as full settlement for all claims for CONTRACTOR: ( t�S BY: 11i1 lGj)l(- TITLE: �� c-G DATE: — U said improvement. l O Et-E__