TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Thomas Place Guardrail and Curb and Gutter Installation Project
CIP 3001027
DATE: January 11, 2010
Dubuque
kigbl
AlhAmedcaCity
111 I
2007
The Thomas Place Guardrail and Curb and Gutter Installation Project has been
completed by Drew Cook & Sons Excavating Co., Inc. of Dubuque, Iowa, in the final
contract amount of $35,547.35, which is a 9.4% decrease from the original contract
amount of $39,255.00.
City Engineer Gus Psihoyos is recommending that the City Council accept the
improvements and establish the final contract at $35,547.35.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
MCVM:Iw
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
Michael C. Van Milligen
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager ,- --
FROM: Gus Psihoyos, City Engineer c
DATE: January 8, 2010
SUBJECT: Thomas Place Guardrail and Curb and Gutter Installation
Project
CIP 3001027
INTRODUCTION
Dubuque
IAA
w- Amedcacnr
11 11 r
2007
The enclosed resolution provides for the acceptance of the construction contract
for the Thomas Place Guardrail and Curb and Gutter Installation Project.
BACKGROUND
The Thomas Place Guardrail and Curb and Gutter Installation Project provided
for the:
— Removal and replacement of approximately 270 square yards of existing
asphalt pavement.
— Installation of approximately 274 feet of curb and gutter.
— Installation of guardrail along the east side (between 907 and 915) Thomas
Place (430 feet).
DISCUSSION
The Thomas Place Guardrail and Curb and Gutter Installation Project has been
completed by Drew Cook & Sons Excavating Co., Inc. of Dubuque, Iowa, in the
final contract amount of $35,547.35, which is a 9.4% decrease from the original
contract amount of $39,255.
RECOMMENDATION
I recommend that the City Council accept the improvements and establish the
final contract at $35,547.35.
BUDGET IMPACT
The total cost for the Thomas Place Guardrail and Curb and Gutter Installation
Project is as follows:
Construction Contract
Engineering & Inspection
Total Project Cost
The project funding summary is as follows:
CIP No. Fund Description
3001027 Guardrail Replacement
Total Project Funding
ACTION TO BE TAKEN
Award Final
$39,255.00 $35,547.35
3,925.50 3,148.70
$43,180.50 $38,696.05
Fund Amount
$38,696.05
$38,696.05
I respectfully request adoption of attached resolution accepting the improvements
and authorizing payment of the contract in the amount of $35,547.35 to Drew
Cook & Sons Excavating Co., Inc. for the Thomas Place Guardrail and Curb and
Gutter Installation Project.
Prepared by Jon Dienst, PE
cc: Barry Lindahl, City Attorney
Jenny Larson, Budget Director
Don Vogt, Public Works Director
John Klostermann, Street Maintenance Supervisor
Bob Schiesl, Assistant City Engineer
RESOLUTION NO. 13-10
ACCEPTING THE THOMAS PLACE GUARDRAIL AND CURB & GUTTER
INSTALLATION PROJECT AND AUTHORIZING THE PAYMENT OF THE
CONTRACT AMOUNT TO THE CONTRACTOR
Whereas, the Public Improvement Contract for the Thomas Place Guardrail and
Curb & Gutter Installation Project (the Project) has been completed and the City
Engineer has examined the work and filed a certificate stating that the Project has been
completed according to the terms of the Public Improvement Contract and that the City
Engineer recommends that the Project be accepted; and
NOW. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
the Guardrail Replacement appropriation for the contract amount of $35,547.35 Tess any
retained percentage provided for therein as provided in Iowa Code chapter 573, and to
pay such retainage only in accordance with the provisions of Iowa Code chapter 573.
Passed, approved and adopted this 19 day of January, 2010.
Attest:
Jeanne F. Schneider, CMC, City Clerk
David T. Resnick, Mayor Pro -Tenn
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE THOMAS
PLACE GUARDRAIL AND CURB & GUTTER INSTALLATION PROJECT
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the Thomas Place Guardrail and Curb & Gutter Installation Project,
that the Project has been performed in compliance with the terms of the Public
Improvement Contract, and that the total cost of the completed work is $38,696.05.
Dated this 12th day of January, 2010.
Filed in the office of the City Clerk on the 14th day of January, 2010.
City Engineer
Jeanne F. Schneider, CMC, City Clerk
Masterpiece on the Mississippi
PARTIAL PAYMENT NO: COUNCIL FINAL
BID ITEM DESCRIPTION
C1
C2
C3
CHANGE ORDER - EXTRA WORK ITEMS
City of Dubuque - Engineering Division
Council Final Payment Form
PROJECT NAME: THOMAS PLACE CURB & GUTTER
CONTRACTOR: Drew Cook & Sons Excavating, Inc.
UNIT
CONTRACT
UNIT COST
DATE: December 28, 2009
CONTRACT AMOUNT: $39,255.00
QUANTITY
TO DATE
TOTAL AMOUNT EARNED TO DATE:
TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS:
TOTAL AMOUNT EARNED TO DATE:
TOTAL DUE CONTRACTOR:
ENGINEERING:
TOTAL CONSTRUCTION COST:
AMOUNT EARNED
TO DATE
-Curb and Goodall'
1 Pavement Removal SY $5.00 270.00 $ 1,350.00
2 Excavation (Unclassified) CY $25.00 67.50 $ 1,687.50
3 Backfill Topsoil SY $25.00 67.0o $ 1,675.00
4 Remove Existing Cable Guarderail & Pipe Railing /Posts LF $3.00 300.00 $ 900.00
5 Graded Stone Base, 3/4" Ton $25.00 75.09 $ 1,877.25
6 HMA 300k Surface Course, 1/2" (PG 64 -22) Ton $110.00 26.74 $ 2,941.40
7 HMA 300k Binder Course, 1/2" (PG 64 -22) Ton $110.00 32.92 $ 3,621.20
8 PC Concrete Curb & Gutter, 2.5' Construct LF $15.50 274.00 $ 4,247.00
9 Seeding, Mulching, and Watering SY $4.00 67.00 $ 268.00
10 Guardrail Installation LF $34.00 430.00 $ 14,620.00
11 Sawcut Pavement - Regardless of Type LF $2.00 180.00 $ 360.00
12 Erosion Control Plan - Operating Procedures LS $400.00 1.00 $ 400.00
13 Traffic Control and Safety Control LS $500.00 1.00 $ 500.00
14 Mobilization LS $1,100.00 1.00 $ 1,100.00
$ 35,547.351
$
$
$
I$
1 $ 35,547.35 1
1 $ 35,547.35 1
1 $ 3,148.70 1
$ 38,696.051
CERTIFICATE OF THE CITY MANAGER:
I hereby certify that the above statement shows in detail the correct amount of all work required to
complete the above improvement.
APPROVED:
APPROVED:
CERTIFICATE OF THE CONTRACTOR
Michael Van Milligen, C
City of Du
e it a
Gus Psihoyos, City Engineer
City of Dubuque, Iowa
er
The undersigned, Drew Cook & Sons Excavating, Inc. contractor for the above improvement, does
hereby accept the above "Total Due Contractor ", as full settlement for all claims for
CONTRACTOR: ( t�S
BY: 11i1 lGj)l(-
TITLE: �� c-G
DATE: — U
said improvement.
l O Et-E__