2018 Asphalt Overlay Access Ramp Project One Acceptance Copyrighted September 4, 2018 City of Dubuque Consent Items # 7. ITEM TITLE: 2018 Asphalt OverlayAccess Ramp Project One Acceptance SUMMARY: City Manager recommending acceptance of the construction contract for the 2018 Asphalt Overlay Access Ramp Project One, as completed by D & D Superior Concrete, LLC. RESOLUTION Accepting the 2018 Asphalt Overlay Access Ramp Project one and authorizing the payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type 2018 Asphalt Overlay Access Ramp Project One-NNM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2018 Asphalt Overlay Access Ramp Project One (CIP 2501227) DATE: August 28, 2018 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2018 Asphalt Overlay Access Ramp Project One, as completed by D & D Superior Concrete, LLC, in the final contract amount of$76,994.17, which was 2.77°k under the contract amount of$79,185.35. I concur with the recommendation and respectfully request Mayor and City Council approval. �� �it�� ,�ti` Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque �' uFAnelleoClry DUB E '�I}I�A` Masterpiece on the Mississippi �°' Z°'Z 2013 2017 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2018 Asphalt Overlay Access Ramp Project One (CIP 2501227) DATE: September 4, 2018 INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the 2018 Asphalt Overlay Access Ramp Project One. BACKGROUND The project replaced twenty-seven non-compliant access ramps with thirty-one compliant, directional ramps as per Public Right of Way Accessibilities Guidelines (PROWAG) specifications in conjunction with the Public Works Asphalt Overlay Program involving the following intersections: • White Street & East 24�h Street, four double ramps. • Jackson & East 24�h Street, two double ramps. • Johnston Street & East 22"d Street, one double ramp and one single ramp • Johnston Street & Providence Street, two single ramps. • Johnston Street & Lincoln Avenue, one double ramp and one single ramp • Johnston Street & Rhomberg Avenue, four double ramps with reconstruction of five storm water intakes to make compliant ramps possible. • Johnston Street and Garfield Avenue, two single ramps. DISCUSSION The 2018 Asphalt Overlay Access Ramp Project One was completed by D & D Superior Concrete, LLC in the final contract amount of $76,994.17, 2.77% under the contract amount of$79,185.35. Five storm water intakes requiring reconstruction due to their location and the inability to work around them for new ramp installations, at a cost of $13,073.50 collectively. The average cost per ramp was $2,367.43. BUDGETIMPACT The project cost summary for the 2018 Asphalt Overlay Access Ramp Project One is as follows: Award Final Construction Contract $79,185.35 $76,994.17 Contingency $7918.54 0.00 Construction Engineering & Inspection $8710.39 $7,391 .54 Total Project Cost �95.814.28 �84.385.71 The funding summary for the project is as follows: CIP No. Fund Description Fund Amount 2501227 Curb Ramp Program $84,385.71 Total Project Funding �$. REQUESTED ACTION The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of$76,994.17 to D & D Superior Concrete, LLC for the 2018 Asphalt Overlay Access Ramp Project One. Prepared By: Tom Kopp, Engineering Technician cc: John Klostermann, Public Works Director Renee Tyler, Assistant Public Works Director Jenny Larson, Budget Director Jon Dienst, Civil Engineer II Paul Davis, Public Works Supervisor 2 RESOLUTION NO. 258-18 ACCEPTING THE 2018 ASPHALT OVERLAY ACCESS RAMP PROJECT ONE AND AUTHORIZING THE PAYMENT TO T,HE CONTRACTOR WHEREAS, the public improvement contract for the 2018 Asphalt Overlay Access Ramp Project One, (the Project) has been completed by the Contractor, D & D Superior Concrete LLC (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $76,994.17; WHEREAS, the Contractor has previously been paid $73,144.46, leaving a balance of $3,849.71; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $3,849.71 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 4th day of September 2018./J . J/.v!J;L/ · r Roy D. Buol, Mayor Attest: KevintS. Firnstahl, CMC City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF 2018 ASPHALT OVERLAY ACCESS RAMP PROJECT ONE The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2018 Asphalt Overlay Access Ramp Project One, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $79,994.17. Dated this JO~ day of ffltc.1 l{~.-/-, 2018. ;) Gus Psihoyos, City Engineer