Loading...
Dbq Hdwds demolish metal bldgsPlanning Services Department City Hall 50 West 13th Street Dubuque, Iowa 520014864 (563) 589-4210 office (563) 589-4221 fax planning@cityofdubuque.org March 28, 2003 The Honorable Mayorand City Council Membem City of Dubuque City Hall-50W. 13~ Street Dubuque, lA52001 RE: Request for Demolition Permit Applicant: City of Dubuque Location: 205 E. 6th Street, Port of Dubuque (Dubuque Hardwoods) Demolition District: Downtown Neighborhood District Description: To demolish metal buildings Dear Mayor and City Council Members: The City of Dubuque Historic Preservation Commission has reviewed the above-cited request. The application, staff report and related materials are attached for your review. Discussion Planning Services Manager Laura Carstens spoke in favor of the request to demolish metal buildings (Dubuque Hardwoods) located at the Port of Dubuque. She noted that a majority of the buildings are less than 50 years old. She indicated that the structures that are older than 50 years old were identified as having no historical or architectural significance. There were no public comments. The Histodc Preservation Commission discussed the request, noting that the metal buildings have no historical or architectural significance and a majodty of metal buildings ara less than 50 years old. Recommendation By a vote of 4 to 0, the Historic Preservation Commission recommends that the City Council approve the request to demolish the metal buildings due to no architectural or historical significance. A simply majority vote is needed for the City Council to approve the request for demolition. Respectfully submitted, Christopher Wand, Chairperson Historic Preservation Commission cc: Rich Russell, Building Services Manager Qty of Dubuque Planning Services Department Dubuque, LA 52001-~864 Phone; 563-589~210 Fax: 563-589-4221 PLANNING APPLICATION FORM [] Variance F]Rezoning []C~ndit~onal Usa Permit []Planned District []Appeal []Preliminary Plat []Special Exception []Minor Final Plat []Umited Setback Waiver []Text Amendment Please twe or l~dnt leqibly in ink ProperLy owner(s): ]~ ~)Ov, ~ ~- []Simple Site Plan []Minor Site Plan [] Majer Site P~an [] Major Final Plat []Simple Subdivision []Annexation []Temporary Usa Permit []Cer'dfic~te of Economic NomViability []Cs~'cateC= of Appropriateness [~her: ~',~c, ~'...,' /'~ Existing zoning: ~V~ propeSedzoning: ~fJ~ HistoficDistrict: LJ[~ Landmark: Legal [Xr:,criff~ion (Sidwell parcel ID# or lot number/blo:k numar/subdivision): Total prope~y (lot) area (square feet or acres):_ Describe pro ,p~al and reason necessa~ (attach ale, tter of explanation, if needed): roo/ 4 _ -/g 'CERT[F/CATiON: I/we, the undersigned, do hereby certify that: 1. The informa~on submitted herein is true and correct to the best of my/our kr~:~Nledge and upon submittal becomes public record; 2. Fees are not refundable and payment does not guarantee approval; and 3. All additional required wdtten and graphic materials are attached. Property Owner(s): Date: Applicant~Agent: Date: / FOR OFFICE USE ONLY - APPLICATZON SUBM4 i i AL CHECKLT. ST Fee: ~ Received by: l~d~£.~ ,~..~q -~ Date: 3] 5-o~ Docket: F]Site/sketch plan [] Conceptual Development Plan [--JPhoto []]Plat [-]improvement plans []]]Design review project description []Floor plan []]Other: Dubuque Initiatives DUBUQUE INITIATIVES Dubuque Initiatives Dubuque Initiatives O-Dubuque Hardwoods Erect pole bldg (whse) East Sixth Street Ext. C-Owner comm bldg BP 1526 11/9/79 $20000.0 DEMOLITION STAFF REPORT Meeting Date: March 20, 2003 Property Address:205 E. 6th Street (Dubuque Hardwoods) Property Owner:Dubuque Initiatives Applicant:City of Dubuque Project:Demolition of Metal Buildings. Demolition District: Downtown Neighborhood Landmark: No Style: None Funding: No Date Built: 1950 - 1984 Present Land Use: Industrial Existing Zoning: Planned Unit Development Physical Characteristics: The Dubuque Hardwoods site is composed of several metal storage buildings and lean-tos which were constructed between 1950 and 1984. Property History: Currently, the site and structures are being used by Dubuque Hardwoods to manufacture and process wood products. Staff Analysis: The City of Dubuque is proposing to demolish several metal buildings constructed between 1950 and 1984 in order to provide improvements to the Port of Dubuque. Several of the structures have not yet made the 50-year age when structures are to be considered historic. The buildings are constructed out of metal and have no architectural significance. A majority of the structures were constructed after the 1979 Kriviskey Survey. The structures that were there prior to the 1979 Survey were. identified as non-supportive. The City Code provides for the Historic Preservation Commission to review the demolition request, and then to make a determination as to: (1) whether the building has historic or architectural significance to the community, and (2) whether denial of the proposed demolition would prevent the property owner from earning a reasonable economic return. If the HPC finds that one or the other of these criteria is not met, then the Commission must recommend approval of the demolition request. If the HPC finds that both of these criteria are met, then the Commission must recommend denial of the demolition request. The Commission's recommendation goes on to the City Council for final action. Prepared by . Reviewed: '~ Date: