Loading...
Thomas Place Retaining Wall Repair Project Acceptance Copyrighted October 15, 2018 City of Dubuque Consent Items # 12. ITEM TITLE: Thomas Place Retaining Wall Repair ProjectAcceptance SUMMARY: City Manager recommending acceptance of the construction contract for the Thomas Place Retaining Wall Repair Project, as completed by Drew Cook& Sons Excavating, Co, Inc. RESOLUTION Accepting the Thomas Place Retaining Wall Repair Project and authorizing the payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Approve ATTACHMENTS: Description Type Thomas Place Retaining Wall Repair Project-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Certificate Supporting Documentation THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Thomas Place Retaining Wall Repair Project DATE: October 8, 2018 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Thomas Place Retaining Wall Repair Project, as completed by Drew Cook & Sons Excavating, Co, Inc., in the final contract amount of$81 ,014.17, which is a 54°k increase from the original contract in the amount of$52,420.00. The increase in construction costs was due to additional rock removal, additional grading, additional HMA pavement, added HMA curb and gutter, added seeding and topsoil and added limestone for the wall repair not included in the original scope of work. I concur with the recommendation and respectfully request Mayor and City Council approval. �� �� ��� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque � A�-Ao�riq 6iq UB E ;�.. _, .�, Il 1Vlasterpiece on the Mississippi 2°°'•2°tZ 2013•2017 TO: Michael C. Van Milligen, City Manager � � � FROM: Gus Psihoyos, City Engineer L�`�`� • �-..�.. ��,_�': DATE: October 8, 2018 RE: Thomas Place Retaining Wall Repair Project INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Thomas Place Retaining Wall Repair Project. BACKGROUND The Thomas Place Retaining Wall Repair Project provided for the repair of 12 feet of existing limestone retaining wall & replacement of 92 feet of existing retaining wall with a reinforced concrete wall. The project also included 26 LF of steel W-Beam guardrail with wood posts, a 92 feet of chain link fence and 198 SF of 5" HMA pavement for the street repair. DISCUSSION The Thomas Place Retaining Wall Repair Project was completed by Drew Cook & Sons Excavating, Inc. of Dubuque, lowa, in the final contract amount of $81,014.17, which is a 54% increase from the original contract in the amount of$52,420.00. The increase in construction costs were due to additional rock removal, additional grading, additional HMA pavement, added HMA curb and gutter, added seeding and topsoil and added limestone for the wall repair not included in the original scope of work. The project was designed and estimated by WHKS. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $81,014.17 to Drew Cook & Sons Excavating, Co., Inc. for the Thomas Place Retaining Wall Repair Project. BUDGET IMPACT The project cost summary for the Thomas Place Retaining Wall Repair Project is as follows: Descripfion Estimate Award Final Construction Contract $ 64,004.82 $ 52,420.10 $ 81,014.17 Contingency 6,400.48 6,400.48 0.00 Contract Admin / Construction Engineering 10,560.80 10,560.80 10,960.80 Total Project Cost $ 80.966.10 $ 69,381.38 91 974.97 The project funding summary is as follows: CIP Fundinq Source Amount 3001029 Stone Retaining Walls $ 91,974.97 Total Project Funding $ 91.974.97 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $81,014.17 to Drew Cook & Sons Excavating, Co., Inc. for the Thomas Place Retaining Wall Repair Project. cc: Jenny Larson, Budget Director Jon Dienst, Civil Engineer 2 RESOLUTION NO. 301-18 ACCEPTING THE THOMAS PLACE RETAINING WALL REPAIR PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Thomas Place Retaining Wall Repair Project (the Project) has been completed by the Contractor, Drew Cook & Sons Excavating, Co., Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $81,014.17; WHEREAS, the Contractor has previously been paid $76,963.46, leaving a balance of $4,050.71; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $4,050.71 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 15th day of October 20 . .11 Roy D. Buol, Mayor Attest: Kevi . Firnstahl, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE ThiOMAS PLACE RET'AINING WALL REPAIR PRUJECT T'hL undersigned Gity Engineer of the City of [7ubuque, low�, herc�by certifies �h�t h� has inspected the Thornas Place f��t�ining Wall Re�air F'roject, arnd that s�id f'roject ha� b�en p�rforrned in c;ompliance with tf�P terrns Uf the Publi� Irnprc�v�ment Contr��ct, �nd that the total cost of the comp ted work is $91,974.97. Dateci ihis _� day of �� , 2018. - - _ `; -,-) ,� , .� . � ..�� �,,�-`�' Gus Psir�c�yos, City F.nginee�� r Filed in the office of fihe City Glerk on th�;� day of -�`'�2018. . � __��- '- � Ke 'n S. �irnsfi� I, CMC, City Clerk