Cedar Lake East 13th Addition - Acceptance of Water Main Improvements Copyrighted
October 15, 2018
City of Dubuque Consent Items # 13.
ITEM TITLE: Cedar Lake East 13th Addition -Acceptance of Water Main
I mprovements
SUMMARY: City Manager recommending acceptance of the public
improvements that the developers, Hansel Properties,
LLC, have recently completed in Cedar Lake East 13th
Addition.
RESOLUTION Accepting public improvements
on Windmill Lane in Cedars Lake East 13th Addition in the
Cityof Dubuque, lowa
SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Adopt
Resolution(s)
ATTACHMENTS:
Description Type
Acceptance of Water Main Improvements in Cedar City Manager Memo
Lake East 13th Addition-MVM Memo
Staff Memo Staff Memo
Resolution Resolutions
Area Map Supporting Documentation
RequestforAcceptance Supporting Documentation
ExcutedAgreement Supporting Documentation
THE CITY OF Dubuque
�
AIFA�erlwGh
UB E '�� III►
Masterpiece on the Mississippi Z°°'�w'2
7A13 2017
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Acceptance of Water Main Improvements in Cedar Lake East 13�h Addition
DATE: October 9, 2018
City Engineer Gus Psihoyos is recommending acceptance of the public improvements
that the developers, Hansel Properties, LLC, have recently completed in Cedar Lake
East 13�h Addition. Maintenance of said improvements shall be the responsibility of the
owners, Hansel Properties, LLC, for a period of two years from the date of acceptance.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
�� �� ���
Mic ael C. Van Milligen �� �
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Teri Goodmann, Assistant City Manager
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
THE CITY OF /��� DU���
��i.�
� � AI-AmericaCitY
� �
� fl
Masterpiece on the Mississippi Zoo,.zo,2.Zo,3
TO: Michael C. Van Milligen, City Manag
FROM: Gus Psihoyos, City Engineer
. , �
DATE: October 8, 2018
SUBJECT: Acceptance of Water Main Improvements in Cedar Lake East 13t" Addition
INTRODUCTION
The enclosed material provides for City Council acceptance of the public improvements
that the developers, Hansel Properties, LLC, have recently completed in Cedar Lake
East 13t" Addition.
BACKGROUND
As a condition of the Water Main Construction Agreement dated August 27, 2018, the
developer of Cedar Lake East 13t" Addition was required to install certain improvements
including water main and appurtenances along Windmill Lane and to dedicate these
improvements to the City upon completion. The approximately 265 foot water main
extension will serve the three new residential lots at the intersection of the private
streets Windmill Lane and Lake Ridge Drive.
DISCUSSION
The Subdivision Ordinance requires that upon completi�n af all the requir•ed public
improvements, the subdivider shall notify the City in writing of the completion of the
improvements, requesting that the City either approve or reject the acceptance of the
improvements, together with a statement of reasons for any rejection.
On September 23, 2018, the owners requested City's acceptance of the improvements
in Cedar Lake East 13t" Addition. Upon inspection by the City, it has been determined
that the public improvements required by said agreement have been completed in
accordance with plans approved by the City Staff and in conformance with City
specifications.
RECOMMENDATION
I would, therefore, recommend that the City Council accept the public improvements as
described above. Maintenance of said public improvements shall be the responsibility
of the owners, Hansel Properties, LLC, for a period of two (2) years from the date of
acceptance by City Council.
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution accepting the public
water main improvements in Cedar Lake East 13th Addition.
Prepared by Nate Kieffer, PLS
RESOLUTION NO. 302-18
ACCEPTING PUBLIC IMPROVEMENTS ON WINDMILL LANE IN CEDAR LAKE
EAST 13TH ADDITION THE CITY OF DUBUQUE, IOWA
Whereas, pursuant to Water Main Construction Agreement dated August 27,
2018, a copy of which is attached hereto, certain public improvements including water
main and appurtenances, were installed by Hansel Properties, LLC; and
Whereas, the improvements have been completed and the City Manager has
examined the work and has filed a certificate stating that the same has been completed
in accordance with the plans approved by the City Council and in conformance with City
specifications, and has recommended that the improvements be accepted by the City
Council.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. That the recommendation of the City Manager be approved and
that said public improvements on Windmill Lane in Cedar Lake East 13th Addition be
and the same is hereby accepted.
Section 2. That maintenance of said public improvements shall be the
responsibility of the owners, Hansel Properties, for a period of two (2) years from the
date of this resolution.
Passed, approved and adopted this 15th day of October 201 .
Roy D. Buol, Mayor
Attest:
THE CTTY OF �� P
Du$ E AREA MAP DAG IS ,�
o�e�Q�E�aER���aAP�����,��aMa.�ovs.,.E�
Masre�'e`�°n`he M�ss;";''�' WINDMILL LANE WATER MAIN
. � � � �+ � � yj � / � -
�a ��� � ��.n �°R. °y�qryJ.iY'�� k � .��'�G �Y �Y�T� ,.,.� ��y4�1 �i�y` i'L'. ;��\Y ,. , `1� `.� p1 hr - �t . "� �k ,
, ; _- � _ �A 4 ,
.. t �qT_� b� � .� .�.� l j J.� •�� e+'••.s '�`�, �� '� � . .;,\ ��� �`t bi�w
�Y ^��`. ,,�, 1`.�4 t' -�!�9M, g,�,.., -1� :�' � a,r � Y.:= `t � `�
��7 � � , ,�-i; � �,'��'v., s_'E �� �'"+�+� �� �.'. V ��'�" �« '�,. , �� �t�� � r � ��
��� ,. � 380 � �.�.��. �� �'�� �a � � ������ .. �:
��C. � °��9 ,� . �'�� ��.,�,�L �'�#' s� ,�,�� ,,�����'_ ��,�'' �*
'��459 ��� � ` ' � t:`` � ''�� ,� ,� " �. �'�t�� �
�
,..
I~ r.,_. �I^ . ,,�, ,
�� �'=' � 448 , ��s���. ��� ' �� ��� �"� e��
r��- � y �
���� F �:� ,� � ° 3261 , �- *�
fl� � � � : � % .�t `
�- h"�� '427 �,rpy . �
' 437 �: - � �
'` 469� �� ,� � z.,, � ;�271 3251 � 3231 � ��," � �� ,� t��;.'�y .��.�; ��;
475 �: �l, ��458 "° � 436 ..,.,, �,5 324'I.� �`�' �" �"��� ��1�'ii� ' .�;� � ;.
: •�. ,
, : � . � . ;� 3221'` ��� � ;� ,�,�
� � °� v "� 457 ; ` � , ,: 455r - �,' • ? •321�1 3201 �'��' �� �ER MAIN ` �
� � 454�
,�;; �4,79 468,�M,� M��. , �`�456 � �- '3189 ��
� M �, c > � ,. H �,� ;T ,„� r��
� 478. . ,�- � � ,
, ,467 6 ?465 r �._ �,,�:,
� ..�. '� , �4,�99 -� r I , .° j s� � J , 64 4" 3255'- 3199 3179 �;
3235�,,
3236" T �
,.498- 477 - ` 4'76 ,• �' 475 � _�j� "� 3235 3255 3255 � 3169 .3159
,� � � , „
„ _ ,_ �C �484 ;,,., , 3235� , ' �3..
� ,. 3255� �
�`� 50 � � 497�_ � 496 �,� � r. � 32 3�� �;� 3149
�� �wJY 495 . _
505 ' 1 , ; �_- '`- ,i3203�`'.3223 . .
-- _
, � �,� ,. • ,'� s', ''� �
'� . •: �„ 3274.3274 � �"�
�� ` _511 �506 C� 3294 3274 �3254r�. 3233.� 3223 Z
. _ � _ -W�r ,: �3254 a � 3233 r
^ " 3160 � ,,;' ��"3294" 3274�, :' ..: 3203 � :.
521 �� - � 401 3254 � 3234� ,.,,'��` i= ,
3190 , : M 3294 �`� 3233 r .
+ 4 �526� '� � �°""` j _ 3234�'�� '� �� ���� �
-�;��� �.� 3170 3.180 ���41�1 ' �3234� 3214 . ° z
' . . � ' G. �—.3260`32 8 3248 " , �a �3214. .
t 531 � �• � 421 : ,' 3264 3288 � � 3214
� � � ; 575 �� � � p.�P �� � ����3284 � 3280 , 3244 �3214 .
"� �` 541 """'� " �240 �
� �'"'� .
: ,.
� ., ;
�� 561 �, ,
;� �.
565 ° > `� , �; � �
, �� , � �� , �� � �a��1E" ���^ t
,
,:
.
Y� � j406�- � � � � ��., �` �° ��� ��420 �
� ,�� � � � � > �
� , 600 .. . \ 1 y ` � �, � � ::� 3158 � .
4:01 � � � � w��� rw ���'� � �� � ��w �fi���*e�^��*`� ! - ,a�" ��
�' �575, 700 r,� � -�, "� �, �` "�^ �` `��. ' , ,w�� `a„ ��.,, . �, , �� �
���� '405=. �.�' � . ,� � _;w�, , ��, ��� �;, ��. �
. � _. ; � �
�. ' „.r. �. ..�r' y ^ F�,�,� ,.4,.,�k, � �' ��' f -': Dubuque CountyP,ssessor, City�o DubuqueAssesso�
DISCLAIMER:Thls Informatlon was mmplled
�sing the Dubuque Area Geographlc Informatlon SVstem
oAcis�,wnid,md�d�dar���eaeed ev eom me ciev oF � Map P�epa�ed by:
Dubuque and Dubuque County. It Is understood that,whlle
me ciev oF o�e�q�e a�d pa�eidpaei�g age�d��ewzed me City of Dubuque
mo��,��e�ca�da���ce��fo�mac�o�a�auabie,oA��sa�d 1 inch = 200 feet EngineeringDivision
ie�s�,vvue�s do�oe wa��a�e me a����a o��,Re�a of ine
mr��maeio�o�dar��o�eai�ed ne�em rne ciev a�d PamdPaei�g 50 West 13th St�eet
age��i�snau�oe ee neia uaeie Fo�a�v ai�e�e,i�ai�e�e,i��iae�eai, Dubuque,lowa 52001
���a�e�eiai,v��ieroe,o�svedai aamae�,wneme�Fo��eeaeie o�
�����eeaeie,a��s��g o�e oF me a�eno�izea o���a�eno�izea�se oF 100 50 0 100 200 300 Feet Phone:(563)589-4270
mis daea o�me i�aewev eo��mis daea o�o�e oF a�v e�ead,oF
wa��a�ry wnarsoe�e� Fax.(563)589-4205
September 23, 2018
Mr. Gus Psihoyos
City of Dubuque Engineering Department
50 West 13`h Street
Dubuque, IA 52001
Re: Request for the acceptartce of the water main extension project Lot 2-2 Cedar Lake East Seventh
Addition.
Dear Mr. Psihoyos, '
On behalf of Hansel Properties, LLC, I am writing to notify you that the water main extension
improvements project on Windmill Lane within Cedar Lake subdivision has been completed and
inspected by city staf#.
Hansel Properties LLC is also requesting acceptance of the public improvements by the city of Dubuque
for its ownership and maintenance.We request that the performance bond portion of our letter of
credit be released at this time.We understand that the warranty/maintenance securities must remain in
� place for a two-year period after City Council aceeptance of the public improvement.
If you have any questions or concerns, please feel free td contact me at 563-599-9433,
Sincerely,
�
leffrey S. Hansel
Hansel Properties LLC
WATER MAIN CONSTRUCTION AGREEMENT
BETWEEN
THE CITY OF DUBUQUE, IOWA
AND
HANSEL PROPERTIES, LLC
This Water Main Construction Agreement (Agreement) is made and entered into
this��a'�,�ay of August, 2018, by and between the City of Dubuque, lowa, an lowa
municipal corporation (City), and Hansel Properties, LLC, an lowa Limited Liability
Company (Developer).
WHEREAS, Developer is the owner of the real estate legally described as LOT
2-2 CEDAR LAKE EAST 13TH ADDITION, LOT 1 CEDAR LAKE EAST 13TH
ADDITION, and LOT 1-2 CEDAR LAKE EAST 13TH ADDITION (Site); and
WHEREAS, Developer desires to construct and provide public water main to and
across the Windmill Lane Private Road Right of Way (Project) to the Site and will need
to construct and carry out any other activities associated with the Project in accordance
with City plans and specifications; and
WHEREAS, upon completion of the project, Developer wishes to dedicate the
water main utility to the City.
NOW, THEREFORE, IT IS AGREED BY AND BETWEEN THE PARTIES AS
FOLLOWS:
SECTION 1. GENERAL CONDITIONS.
1.1 Developer will begin work on the Project in September 10, of 2018. The Project
will be substantially completed by November 30, 2018. Water main improvement plans
for the Project are attached as Exhibit 1.
1.2 Work on the Project may not commence until this Agreement is executed by
Developer and City, Developer has obtained and submitted copies to City of all
applicable licenses and permits, Developer has obtained all required bonds or other
acceptable form of security, and Developer had paid all applicable inspection fees.
1.3 Developer is responsible and will pay for all costs related to the Project, including
but not limited to, construction costs, connection fees and inspection fees.
SECTION 2. PLANS AND PERMITS.
2.1 Developer must obtain and submit to the City copies of all applicable permits
necessary for the Project prior to commencing work.
08272018rnk
2.2 Developer must obtain all applicable permits and licenses required for working in
the City right-of-way.
2.3 Developer must submit to the City final design plans for the Project prior to
commencing work. The City will review and approve such plans before work on the
Project commences. If such plans are not approved, City will provide feedback
regarding the modifications necessary for approval.
SECTION 3. BONDS.
3.1 Developer must obtain a construction bond or other suitable security for one
hundred ten percent (110%) of the estimated total construction cost of the Project.
3.2 Developer must obtain a maintenance bond or other acceptable security for
twenty-five percent (25°/o) of the estimated total construction cost of the Project.
Developer must maintain this maintenance bond for two (2) years after date that the
City Council accepts the completed Project.
SECTION 4. INSPECTIONS AND ACCEPTANCE.
4.1 The City will inspect the Project throughout its implementation and at its
completion to ensure compliance with the approved plans and specifications.
Developer must pay to the City an inspection fee in the amount of three percent (3°/o) of
the estimated total construction cost for the Project.
4.2 The City will conduct a final inspection upon the completion of the Project. If the
inspection establishes that the Project has been completed in accordance with the
approved plans and City requirements and specifications, the Project will be presented
to the City Council for acceptance. This agreement is not a guarantee of acceptance by
the City Council.
SECTION 5. MAINTENANCE.
5.1 Following the two-year maintenance period in described in 3.2 above, City will be
responsible for the maintenance and repair of the water main utility. The City shall be
responsible for limited site restoration following any water main utility work. Restoration
by the City is limited to disturbed driveway/access pavements and turF areas.
Restoration of all other landscaping and improvements shall be the responsibility of the
property owner or other. City will not be responsible for replacement of pavement
surface of private street Windmill Lane.
SECTION 6. INSURANCE AND INDEMNIFICATION.
6.1 Developer agrees to hold harmless and indemnify City, and its officers, agents
and employees, against any and all claims, actions, demands, losses, liabilities or legal
expenses that may arise on account of injury to any person or damage to any property
2
occurring in connection with the Project. This indemnification includes, but is not limited
to, any liability or obligation of the City arising from any claim by Developer or any
person, firm, or corporation providing services for Developer in connection with the
Project.
6.2 At all times during the Project, from commencement of work to acceptance by the
City of the Project, any contractors or subcontractors hired by Developer to perform
work on the Project must comply with the insurance requirements set forth in the
Insurance Schedule F, attached as Exhibit 2.
SECTION 7. MISCELLANEOUS.
7.1 This Agreement may not be assigned without the prior written permission of the
City. Such written approval will not be unreasonably withheld.
7.2 This Agreement represents the entire Agreement between the parties. There are
no verbal additions to this Agreement, and all amendments, additions or changes to this
Agreement must be in writing and agreed to by both parties.
7.3 All covenants, conditions, and provisions of this Agreement will inure to the
benefit of and be binding upon the parties hereto and their respective successors, heirs
and assigns. �
7.4 This Agreement is governed by the laws of the state of lowa and venue for any
action arising from or related to this Agreement will be in the District Court of lowa,
Dubuque County, lowa.
7.5 If any term of this Agreement is found to be void or invalid, such invalidity will not
affect the remaining terms of this Agreement, which will continue in full force and effect.
7.6 All Riders and Exhibits attached hereto form material parts of this Agreement.
7.7 All notices and correspondence related to this Agreement must be sent to the
following:
If to Developer: Hansel Properties, LLC
Attention: Jeffrey S. Hansel
439 Tamarack Ct.
Dubuque, lowa 52003
If to City: City of Dubuque, lowa
Attention: Gus Psihoyos, City Engineer
50 West 13t" Street
Dubuque, lowa 52001
3
CITY OF DUBUQUE, IOWA HANSEL PROPERTIES, LLC
By:
By: . �.
Michael C. Van Milligen Jeffrey . �
City Manager
Its: Owner
4
�
August 27, 2018
To : City of Dubuque lowa
Attention: Nate Kiefer, City Engineering Department
From: Hansel Builders, Inc.
439 Tamarack Ct.
Dubuque, lA 52003
Dear Sirs,
Hansel Builders, Inc. has granted Hansel Properties, LLC the right to install a municipal water main within
the confines of Windmill Lane and adjacent easements located within Cedar Lake subdivision in the City
of Dubuque, IA.
Windmill Lane will become part of the common areas of Cedar Lake Corporation in the near future.Ali
Cedar Lake common areas are available for city sewer and water installations and become easements
where necessary.
This acknowledgement is signed by Jeffrey S. Hansel, president and secretary/treasurer, Hansel Builders,
lnc.
Dated: � � ��
Signature:- � " �Rt.S�f�Ci��
Jeffrey S. Hansel, Hansel Builders, Inc.
/��/��//j�Jj�/ ���/1!� VIGTORIA J.RICHTER
L�/`� ✓[� �� :,'� �/`-� , Y t�P L°•
Notary Signature: � , i =�� Commission Number 142794
J� � �o,�r f�y Gomm�Exp..�!%-�
EXHIBIT 1
INWOOD SANITARY SEWER EXTENSION
INITIAL SEWER CONSTRUCTION PLAN
5
Ll
0
8
BUESING & ASSOCIATES
UTILITIES
IOWA ONF CAI L 1 (800) 797-8989
awr
CITY 06 DUBUQUE
ENGINEERING DIVISION
50 W 13TH ST.
DUBUQUE, IA
(563) 589-4270
WATER
CITY OF DUBUQUE
WATER DIVISION
925 KERPER CT.
DUBUQUE, IA
(563) 589-4305
FI FCTRIC
ALLIANT ENERGY
8000 CHAVENELLE RD.
DUBUQUE, IA
(583) 587-4537
TERRY DEMPEWOLF
GA
BLACK HILLS ENERGY
1015 CEDAR CROSS RD.
DUBUQUE, IA
(563) 585-4026
CASSIE HIATT
TELFPHONF
CENTURY LINK
3908 Utica Ridge Rd.
Bettendorf, IA
(563) 355-2592
BRENT GIESE
CABLE TV
MEDIACOM
3900 26th Ave.
Moline, IL
(3esorrdnnni743-4750
n50
D
WATER MAIN EXTENSION
LOT 2-2 CEDAR LAKE - EAST
SEVENTH ADD.
DUBUQUE, IOWA,
SHEET INDEX
A.01 COVER SHEET (MISC. INFO...)
D.01 PLAN AND PROFILE — WATER MAIN
CITY OF DUBUQUE WATER MAIN DETAILS
Til
LAKs FP/'
LOCATION MAP
LEGEND
EXISTING PROPERTY LINE
EXISTING PERIMETER
EXISTING RIGHT OF WAY (ROW)
EXISTING EASEMENT LINE
PROPOSED PROPERTY LINE
PROPOSED EASEMENT LINE
BUILDING SETBACK
CENTERLINE
XTG. STREET
XTG STREET (C-0)
—."w— XTG. SANITARY SEWER
XTG. STORM SEWER
XTG. WATER
— oe—oe—eo— — XTG. OVERHEAD UTILITIES
XTG. UNDERGROUND UTILITIES
— — — - XTG. ELECTRIC
—•—.--.—.—*— XTG. TELEPHONE
XTG. GAS
O MH MANHOLE (SANITARY/STORM)
O CB
—6 FES
—0 FH
WV
E( SL
0 HH
0 FV
FLARED END SECTION
FIRE HYDRANT
WATER VALVE
STREET UGHT
HANOHOLE (STREET LIGHT)
FIBER OPTIC CONDUIT VAULT
PRO STREET (C—G)
— PRO. SANITARY SEWER
- PRO. STORM SEWER
— — — PRO. WATER
PRO. UNDERGROUND UTILITIES
—- —•—.—•—• — PRO. ELECTRIC
— — - - - - - PRO. TELEPHONE
- - - PRO. GAS
PRO. STREET LIGHT WIRING
—na—A—..—.e—n,— PRO. FIBER CONDUIT
e3D---- XTG. CONTOURS
800 PRO. CONTOURS
PRO. GRADING UNITS
—e—e—e—e—e— PRO. SILT FENCE
OR FILTER SOCK
888.86 PRO. SPOT ELEVATION
888.68T PRO. SPOT ELEVATION (TOC)
888.886 PRO. SPOT ELEVATION (GUT)
ALL CONSTRUCTION IS TO BE PER SUDAS STANDARD
SPECIFICATIONS. 2017 EDITION, ALONG WITH THE CITY OF
DUBUQUE SUDAS SUPPLEMENTAL SPECIFICATIONS, 2017 EDITION,
EXCEPT THE WATER MAIN AND DISTRIBUTION THEREOF. WHICH
WILL USE THE CITY OF DUBUQUE WATER DISTRIBUTION DIVISION
STANDARDS & SPECIFICATIONS (APPROVED BY IDNR
9-12-2011).
REVIEWED:
LEGEND
XTG EXISTING
PRO PROPOSED
TEMP TEMPORARY
FUT FUTURE
CL CENTERLINE
BOC BACK OF CURB
B—B
C—G
TOC
GUT
PCC
ACC
BOP
EOP
ROW
BM
SS
MH
CO
FL
DIP
PVC
STS
CB
DBO5
FES
RCP
HDPE
WM
61-1
WV
SL
HH
FO
FV
PP
ET
EP
TP
CP
SW
AR
TYP
PUE
SSE
STE
SSTE
WE
SWE
GE
TE
BOC TO BOC
CURB & GUTTER
TOP OF CURB
GUTTER
PORTLAND CEMENT CONCRETE
ASPHALT CEMENT CONCRETE
BEGINNING OF PAVEMENT / PROJECT
END OF PAVEMENT / PROJECT
RIGHT OF WAY
RADIUS
BENCHMARK
SANITARY SEWER
MANHOLE
CLEANOUT
FLOWLINE
DUCTILE IRON PIPE
POLYVINYL CHLORIDE
STORM SEWER
CATCH BASIN
DETENTION BASIN OUTLET STRUCTURE
FLARED END SECTION
REINFORCED CONCRETE PIPE
HIGH DENSITY POLYETHYLENE
WATER MAIN
FIRE HYDRANT
WATER VALVE
STREET LIGHT
STREET LIGHT HANDHOLE
FIBER OPTIC CONDUIT
FIBER OPTIC CONDUIT VAULT
POWER POLE
ELECTRIC TRANSFORMER
ELECTRIC PEDESTAL
TELEPHONE PEDESTAL
CABLE TV PEDESTAL
SIDEWALK
ACCESSIBLE RAMP
TYPICAL
PUBLIC UTILITY EASEMENT
(ELEC.. PHONE, CABLE TV, GAS...)
SANITARY SEWER EASEMENT
STORM SEWER EASEMENT
SANITARY & STORM SEWER EASEMENT
WATER EASEMENT
SANITARY SEWER & WATER EASEMENT
GAS EASEMENT
TELEPHONE EASEMENT
JURISDICTION AUTHORITY
TITLE DATE
2-
0
0
16
16
0
EO
D
SEE BAR SCALE
a '
HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
SUPERVI90NYAND TIATRIDAM R n DULLY CUCERSSEDNPRLOFESSIONAL
ENGINEER UNDER THF U. OF THE STATE OF IOWA.
PATRICK J. NORTON (DATE)
LICENSE NUMBER: 171M
MY LICENSE RENEWAL DATE IS DECEMBER 31, 2018
P600S 0
SHEETS
S COVED BY THIS SEAL
A NTHE SHEET INDEX ON THIS SHEET.
SHEET TITLE
A.01
k S � mz S � �
$ $ S $ 8 $,o� $ $ $ 8
�� fF _
Fy �o.. oy o-xi
g mN r m�p H�
g ne.so � � v',`°
�om � 'i .,
�z � ,, <� FF /�' o�° _
o � Im k�c8;�, ,�/: o�`" s�
gna,s i�lao sm� ���`�� jlll�l +s -xitra� �
� �� >o> Wj�D � ��` �� ��a =�
5,,,.,z To� � �o� Mi�� �'� ���mk"
��� i f�- (N .�<_��'�
— A�o i ��3 ��ma �w 'Rm� �'� .
g�J6.09 �az U�� G=� p �.��\ � `.`
Z D� m O q0 B. ��"Z��\ v x _
p� ry(n =�\ �m
� `` �� C wM ` � ,1�� �E
g��S.OJ I �� �` ��\� n�
� `` � , m^"p� <,v P �.�
� ' N; /
$na.zs I f N
��� N�N a �
I — Z� �
— � � � �
�l3.Bfi I -A� � n /
+� I m�Z \) / / o�
I � /
N� %
S]]L.36 '� D;O ;/,f/ �< 5 / IA m
� Z \
p]]5.02 ' / �/�O` ' I Z -
%/ h N j 1 moZ�m
O
� DyfF°i�D �2 ���� Z � i OZf�t��l
$]]fi.01 -� T � o ~��mo
' r m / o / ' r9ym
➢ymA � �
� ��m �x O�D � ��C �
g>]).01 [ 11 a , � � � p;�N�m
k
I , '" �a i/ Oz m
� � o �
om.eo /"/, A
F� � }£ �/4' � ��
R�� � `�--<�_
s„a.s� x� i� � �, � , �
�o if �,, °� < �a ,� � --
i; �� � ` - N
�\
o��9.20 ��
� \ �\�\
- I y k�x `�\ !.. \�
o��9.9e - m � m�n � rf\ `�
D�A II� \\\\ �\\\`�
� �F �
S�,9sa A _ _ � �1 �,
,
��
� �� �
a ; a s � "
s s � s s s s s s
� i � r
F �r � i �,
fi p2 ,i i ;� �� °�
,% h=� � ��/ i�/ �N �o> � % �'� � o�
�� N = ��ii �i '�. Fn oF� ��, i�, m� � .._
" om�t°' � {\i aai� /° // `�T�g`p\,< //�^/ �.� o�o �k
F "' \ o;/ „/` �°wM �'<%� E
� `>�,a \�;� � l`%x'l� �� ��RA
`�� �/ �� �,w � ` � �� /`nT�o
' �4 � A \�\ \���� _ `m�mm
•5.4/°/4 i`k, \ '''�n'c �/ Gl
mv m� �Z'kY/J 4x�
}� � � m m O "v'�\i ,�-
0�~� L�� --�➢ �k � �/'V �� �m�
a,%�
/v m" y ��Ll/�� / n u�`�,�
"� � � x r= (N +�-�`�� p�
�% �4 \ ' N � '^o `�
�y i' �� ;� N in�i `�`� ��`\�,
�' � t �m o Y�`� �°�
pR��
.c/,�� / / \\ �
� �/ „� \ oe�p�p�4, L `���"�"\
� � IVM� a"��
��� �\`�
� \ \4 0� `4\����
�� \ ��
+'^ \°\� \�� � �, , \��`�
o�,�� \\'<� \�\ �;'� ' -, �
\ m . � ,�. . �'-,
SHEET TITLE PROJECT N0. 18090 DATE REVISIONS DRAWN BY:
0 WATER MAIN EXiENSION �UESING 5/23/20�8 TPL
LOT 2-2 CEDAR LAKE - EAST PREP^REo FOR` nssoanres iNc.
O ENCENEERS ANO SURYLYORS SCALE: CHECKED BY:
� SEVENTH ADD. JEFF HANSEL i:is ocusr s.DUeuaue,w
DUBUWE,iown `cssa�sss-.ae9 SEE BAR SCALE P�N
I
SECURE WITH
POLYETHYLENE TAPE
6 MIL POLYETHYLENE
TUBE FOLDED SNUGLY
AROUND PIPING.
36"
CORPORATION STOP TAPPED
DIRECTLY THROUGH TAPE &
POLYETHYLENE WRAP.
SERVICE LINE POLYETHYLENE TUBE
TO BE TAPED TO WATERMAIN
11. B
DIP PIPE
12" CLEAN PIPE SURFACE AND APPLY PIPE WRAP
PRIMER AROUND ENTIRE PIPE. LET DRY UNTIL
TACKY. WRAP 3 LAYERS OF POLYETHYLENE
TAPE COMPLETELY AROUND PIPE MAINTAINING
A 50% OVERLAP. 2" TAPE RECOMMENDED. TAPE
THE POLYETHYLENE TUBE INTO THE EDGE OF THE
CORPORATION STOP LOCATION.
36"
8 MIL POLYETHYLENE
TUBE FOLDED SNUGLY
AROUND SERVICE LINE.
SECURE WITH
POLYETHYLENE TAPE
SERVICE LINE TO METER
(SERVICE LINE SHALL BE
TYPE "K" COPPER.)
DIP PIPE
SERVICE TAP DETAIL
DUCTILE IRON PIPE POLYETHYLENE ENCASED
1. REMOVE ALL LUMPS OF CLAY, MUD, CINDERS, ECT. WHICH MAY
HAVE ACCUMULATED ON THE SURFACE OF THE PIPE. A POLYETHYLENE TUBE
SHOULD BE CUT SO THAT IT IS APPROXIMATELY TWO FEET LONGER THAN THE
PIPE SECTION. SLIP THE TUBE ONTO THE PIPE. ALLOW ONE FOOT TO OVER-
HANG EACH END OF PIPE.
C
DIP PIPE
1
POLYETHYLENE WRAP
2. PUSH BACK THE OVERHANGING TUBE ENDS UNTIL THEY CLEAR THE
PIPE ENDS.
POLYETHYLENE WRAP
DIP PIPE
3. TAKE UP THE SLACK IN THE TUBE TO MAKE A SUNG BUT NOT TIGHT FIT.
FOLD EXCESS BACK OVER THE TOP OF THE PIPE.
POLYETHYLENE WRAP
DIP PIPE— DIP PIPE
POLYETHYLENE WRAP FOLDED
OVER THE TOP OF PIPE
4. SECURE THE FOLD WITH POLYETHYLENE TAPE AT SEVERAL LOCATIONS?
ALONG THE PIPE BARREL.
DIP PIPE—
POLYETHYLENE WRAP
�C
POLYETHYLENE
COMPATIBLE TAPE
5. DIG SHALLOW DEPRESSION AT EACH DIP JOINT AND ASSEMBLE JOINT.
DIP PIPE
POLYETHYLENE WRAP
swum
twicu� uuvLm•
POLYETHYLENE
COMPATIBLE TAPE
6. PULL THE POLYETHYLENE TUBE END OF THE PREVIOUSLY INSTALLED PIPE
OVER THE NEW PIPE AND SECURE WITH POLYETHYLENE COMPATIBLE TAPE
FROM THE PRECEDING PIPE BELL.
POLYETHYLENE
COMPATIBLE TAPE
POLYETHYLENE WRAP
Normil1= ■rllrtl■
%/i/`�I\/`I/ri/I�r� `�r�rri\�q`�ir`�i;
POLYETHYLENE
COMPATIBLE TAPE
7. OVERLAP THE SECURED TUBE END OF THE NEW PIPE SECTION. SECURE
THE NEW TUBE END IN PLACE WITH POLYETHYLENE COMPATIBLE TAPE.
POLYETHYLENE
COMPATIBLE TAPE POLYETHYLENE WRAP
■ILS• LJIt
POLYETHYLENE
COMPATIBLE TAPE
6. REPAIR ALL RIPS, TEARS, OR OTHER TUBE DAMAGE WITH
POLYETHYLENE COMPATIBLE TAPE.
POLYETHYLENE
COMPATIBLE TAPE
POLYETHYLENE WRAP
1
POLYETHYLENE
COMPATIBLE TAPE
POLYETHYLENE
COMPATIBLE TAPE
NOTE:
1. THE CONTRACTOR WILL BE REQUIRED TO UTILIZE
A NYLON STRAP FOR TRANSPORTING DUCTILE
IRON PIPE WATERMAIN INTO THE TRENCH.
2. THE POLYETHYLENE TUBE WILL BE BLUE IN
COLOR.
3. THE CONTRACTOR WILL BE REQUIRED TO
TAPE ALL HOLES IN THE POLYETHYLENE WRAP
IF DAMAGED DURING CONSTRUCTION WITH
POLYETHYLENE COMPATIBLE TAPE.
INSTALLATION INSTRUCTIONS POLYETHYLENE
ENCASEMENT
Dubuque
1IIIJ/
2007
CITY OF DUBUQUE
ENGINEERING DEPARTMENT
CITY HALL, 50 WEST 13th STREET
DUBUQUE, IA 52001-4834
PHONE (563) 589-6270 FAX (563) 5804205
N BYHverwRON I Mwo+as, lo.
WATER MAIN DETAILS
CAP. NENE: 1 3561NumCr.
NEW
HYDRANT
TRACER WIRE ACCESS BOX
LOCATED 1' LEFT OR RIGHT OF
NEW HYDRANT. TRACER WIRE
ACCESS BOX TO BE INSTALLED
FLUSH WITH EXISTING GROUND.
TRACER WIRE
7:�v"Y�G�<
�S��yC
VALVE BOX
•
DO NOT RUN TRACER
(e\< ■ j WIRE UP VALVE BOX
•
!!j!!l !IIr 3
i/
�•l�:_.i� e_ GO /
WATERMAIN
TRACER WIRE STATION AT HYDRANT
LID TOP VIEW
3 i" DIA COVER
STAINLESS STEEL
TERMINAL BOLTS
LID SIDE VIEW
COLLAR TOP VIEW
18" TO 24"
ADJUSTABLE
TRACER WIRE RECEPTACLE DETAIL
TRACER WIRE
ACCESS BOX
INSTALL TRACER WIRE UP
HYDRANT BARREL TO TRACE
WIRE STATION TERMINALS AND
BACK DOWN.
TRACER WIRE
10 AWG. (USE, COLOR: BLUE)
NEW HYDRANT
BARREL
NEW WATERMAIN
HYDRANT VALVE
VALVE
DO NOT RUN TRACER
WIRE UP VALVE BOX
CONNECT TO GROUND ROD WITH APPROVED
UNDERGROUND CONNECTION. CONTRACTOR
TO PROVIDE DOCUMENTATION FOR GROUND
ROD CONNECTION.
EXISTING
WATERMAIN
INSTALL 5/8" x 24"
COPPER CLAD
GROUND ROD
SPLICE CONNECTION TO BE MADE WITH AN
APPROVED UNDERGROUND CONNECTION.
CONTRACTOR TO PROVIDE DOCUMENTATION
FOR SPLICE CONNECTION.
TRACER WIRE
10 AWG. (USE, COLOR: RED)
HYDRANT TEE
NOTE:
CARE MUST BE EXERCISED TO
PRESERVE THE INTEGRITY OF THE
INSULATION ON THE TRACER WIRE.
TRACER WIRE DETAIL
Dubuque CITY OF DUBUQUE
bad
ENGINEERING DEPARTMENT
CITY HALL, EST 13th STREET
BUGIUE, A 5200RRON 1%864
s 1608.2864 ss) 08.0205
1053
WATER MAIN DETAILS
2007 1 3135158505;
EXHIBIT 2
INSURANCE SCHEDULE F
6
City of Dubuque Insurance Requirements for General, Artisan or Trade Contractors,
Subcontractors or Sub-Subcontractors
INSURANCE SCHEDULE F
Class A:
Asbestos Removal Fiber Optics Sanitary Sewers
Asphalt Paving Fire Protection Sheet Metal
Concrete Fireproofing Site Utilities
Construction Managers General Contractors Shoring
Cranes HVAC Special construction
Culverts Mechanical Steel
Decking Paving & Surfacing Storm sewers
Demolition Piles &Caissons Structural Steel
Deconstruction Plumbing Trails
Earthwork Retaining Walls Tunneling
Electrical Reinforcement Water main
Elevators Roofing
Class B:
Chemical Spraying Landscaping Rough Carpentry
Doors, Window& Masonry Stump Grinding
Glazing Vehicular Snow Removal Tank Coating
Drywall Systems Painting &Wall Covering Tree Removal
Fertilizer Application Pes#Control Tree Trimming
Geotech Boring Scaffolding Tuckpointing
Insulation Sidewalks Waterproofing
Finish Carpentry Plastering Well Drilling
Class C:
Carpet Cleaning General Cieaning Power Washing
Carpet& Resilient Grass Cutting Tile&Terrazzo Flooring
Flooring Janitorial Window Washing
Caulking & Sealants Non Vehicular Snow&
Acoustical Ceiling Ice Removal
Filter Cleaning Office Furnishings
Page 1 of 6 Schedule F, General,Artisan or Trade Contractors, Subcontractors or Sub Subcontractors November 2017
City of Dubuque Insur Subcontractors or Sub Subcont actors or Trade Contractors,
INSURANCE SCHEDULE F (continued)
1. Contractor shall fuvera e eg ueeden IExhibit I priorrto commenc��ing wo k and apthe lendfof the
contract for the co g q
project if the term of work is longer than 60 days. Contractors presenting annual certificates sha
present a certificate at the end of each project`N�oved b I the lolwa De artmentlfoflnsurance or an
prepared on the most current ACORD form app Y p
equivalent approved by the Finance Director.The certificate must clearly indicate the project
number, project name, or project description for which it is being provi�dePro ecPLocation at
# Project name:
or construction of
2. All policies of insuranchall halve a rating of A orbetteWin the current A.M�Best�'s Rati guGu de in
lowa and all insurers s
3, Each Certificate required shall be furnished to the_—Department of the City of
Dubuque.
4. Failure to provide t uerement gby t�he C ry of IDubuqueu Fa lure to obtaen orlmainta ntlhe equaed
waiver of these req
insurance shall be considered a material breach of this contract.
5, Contractor shall reqwork insu an�ce for the cov�erages desc ibed in thi�bnsuran e Schedule arnd
the performance of
shall obtain certificates of insurance from all such subcontractors and sub-subcontractors.
Contractor agreesin su h covebage bThe�C ty ma'y request ab opy of s�ch ert fb ates from ther to
obtain and mainta
Contractor.
g. All required endorsements to various policies shall be attached to the certificate of insurance.
7_ Whenever an ISO form is referenced the current edition must be provided.
g. Contractor shall be requirExhibit Irrylnsu ancle Schedule F Ifl he con�tractoersf I masloftliability are
other legal agreement, in
higher than the required minimum limit then the contractor's limits shall be this agreement s
required limits.
Page 2 of 6 Schedule F,General,Artisan or Trade Contractors, Subcontractors or Sub Subcontractors November 2017
City of Dubuque Insurance Reqr ctors otr Sub Subcont actors or Trade Contractors,
Subcon
INSURANCE SCHEDULE F (continued)
EXH_�B�T �
q� COMMERCIAL GENERAL LIABILITY
$2,000,000
General Aggregate Limit re ate Limit $2,000,000
Products-Completed Operations Agg 9 $�,000,000
Personal and Advertising Injury Limit
$1,000,000
Each Occurrence $50,000
Fire Damage Limit(any one occurrence) $5,000
Medical Payments
eneral
�� Coverage shall be`�`�r�l be written in accord wth ISOlform CG0001 or busgess
liability coverage shal
owners form BP0002. o�bdsi less owne s foemt6P 0002 sOall be clea�y9enera
liability form CG 0001
identified.
2� Include ISO endorsement form CG 25 04"Designated Location(s)General
Aggregate Limit" or CG 25 03"Designated Construction Project(s)
Aggregate Limit" as appropriate. and non-contributory.
3� Include endorsement indicating that coverage is primary
4� Include Preservation of Governmental Immunities Endorsement. (Sample
attached).
5� Include additional insured endorse allnts�elected and appointed officials, all its
The City of Dubuque, including
employees and volunte�s,lo��ees a�d�volun eers. U e ISO form CG 20 10 n
t h e i r b o a r d m e m b e r s, p Y
(Ongoing operations). leted operations under
g� T he a d d i t i o n a l i n s u r e d endorse o ect t alml an d�for a p e r i o d o f t w o y e a r s after the
ISO form CG 2037 during the p j
completion of the project.
7� Policy shall include Waiver of Right to Recover from Others endorsemen .
g� WORKERS' COMPENSATION &EMPLOYERS LIABILITY
Statutory Benefits covering all employees injured on the job by accident or disease as
prescribed by lowa Code Chapter 85.
Coverage A Statutory—State of lowa
Coverage B Employers Liability $100,000
Each Accident 100,000
Each Employee-Disease $
Policy Limit-Disease
$500,000
Policy shall include Waiver of Right to Recover from Others endorsement.
Coverage B limits shall be greater if required by the umbreila/excess insurer.
N
onelection of Workers' Compensation or Employers' Liability Coverage under lowa
Code sec. 87.22
_yes _form attached
eral Artisan or Trade Contractors, Subcontractors or Sub Subcontractors November 2017
Paqe 3 of 6 Schedule F, Gen ,
City of Dubuque Insurance Requirements for General, Artisan or Trade Contractors,
Subcontractors or Sub Subcontractors
INSURANCE SCHEDULE F (continued)
C) AUTOMOBILE LIABILITY
Combined Single Limit $1,000,000
D) UMBRELLA/EXCESS LIABILITY
Umbreila liability coverage must be at least following form with the underlying policies
included herein.
All Class A contractors with contract values in excess of$10,000,000 must have
umbrella/excess liability coverage of$10,000,000.
All Class A and Class B contractors with contract values between $500,000 and
$10,000,000 must have umbrella/excess liability coverage of$3,000,000.
All Class A and B contractors with contract values less than $500,000 must have
umbrella/excess liability coverage of$1,000,000.
All Class C contractors are not required to have umbrella/excess liability coverage.
All contractors performing earth work must have a minimum of$3,000,000 umbrella
regardless of the contract value.
E) ENVIRONMENTAL IMPAIRMEPJT LIABILITY OR POLLUTION LIABILITY
Coverage required: _yes _no
Pollution liability coverage shall be required if project involves any pollution exposure for
hazardous or contaminated materiais including, but not limited to, the removal of lead,
asbestos, or PCB's. Poilution product and complete operations coverage shall also be
covered.
Each Occurrence $2,000,000
Policy Aggregate $4,000,000
1) Policy to include job site and transportation coverage.
2) Include additional insured for:
. The City of Dubuque, including all its elected and appointed officials, all its
employees and volunteers, all its boards, commissions and/or authorities and
their board members, employees and volunteers. Use ISO form CG 2010.
(Ongoing operations)as stated in A(6)above or its equivalent.
3) Include Preseryation of Governmental Immunities Endorsement.
4) Provide evidence of coverage for 5 years after completion of project.
Page 4 of 6 Schedule F, General,Artisan or Trade Contractors, Subcontractors or Sub Subcontractors November 2017
Cit of Dubuque Insurance Requiremen�t�Sub Subcont actors �r Trade Contractors,
y Subcontractors
INSURANCE SCHEDULE F (continued)
F� RAILROAD PROTECTIVE LIABIL�TY
no
Coverage required: _YeS — from the edge
Any contract for construction or demolition a oo�°b°dgeto trestlee trac o)n f cabo�n of the
of the tracks of a railroad or effecting any
tunnel, underpass, or crossing for which an easement or li additional c�overages.
railroad is required, shall require evidence of the following
Railroad Protective Liability:
�—_each occurrence(p
er limits required by Railroad)
$—policy aggregate(per limits required by Railroad)
OR
. of this endorsement shall be attached to the
An endorsement to the Commercial General Liability policy equal to ISO CG 241
(Contractual Liability-Railroads). A copy
certificate of insurance.
� __ � ,.r� Schedule F,
General,Artisan or Trade Contractors, Subcontractors or Sub Subcontractors November 2017
City of Dubuque Insurance Rna actors otr Sub Subcont actors or Trade Contractors,
Subco
PRESER
VATION OF GOVERNMENTAL IMMUNITIES ENDORSEMENT
rees and states that the purchase
�. Nonwaiver of Governmental Immunit .The inslowa as an Addigonal Insured does not waive any
of this policy and the including of the City of Dubuque,
of the defenses of governmental immunity avaibe iamended f om tDme to t meowa under Code of owa
Section 670.4 as it is now exists and as it may
2. Claims Coveraae.The insurer further agal mmunitylu der t efCode of lowa Section 670.4 ass t
claims not subject to the defense of governmen
now exists and as it may be amended fromsia e�to nd tions of this linsurance policy Code of owa
Section 670.4 shall be covered by
the term
3
. Assertion of Government Immunit . The Citys f Dua y time and shall do sospponlbhe t�mely written
any defense of governmental immunity, and may •
request of the insurer.
Non-Denial of Coveraae. The insurer shall not deny coverage under this policy and the insurer
olic for
4.
shall not deny any of the rights and benefits accruing to the City of�{e tqunsdic on hasrruled in favor of
reasons of governmental immunity unle y and until a the Cit of Dubuque, lowa.
t he d e f e n s e(s)of governmental immunit asserted by Y
No Other Chan e in Polic . The above preservation of governmental immunities shall not otherwise
change or alter the coverage available under the rolicy.
(DEPARTMENT MANAGER: FILL IN ALL BLANKS AND CHECK BOXES)
Page 6 of
g Schedule F, General, Artisan or Trade Contractors,Subcontractors or Sub Subcontractors November 2017