Accepting the Cummins Street Retaining Wall Reconstruction Project Copyrighted December 3, 2018 City of Dubuque Consent Items # 16. ITEM TITLE: Accepting the Cummins Street Retaining Wall Reconstruction Project SUMMARY: City Manager recommending acceptance of the construction contract for the Cummins Street Retaining Wall Reconstruction Project, as completed by Drew Cook & Sons Excavating, Inc. RESOLUTION Accepting the Cummins Street Retaining Wall Reconstruction Project and authorizing the payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type Cummins Street Retaining Wall Project-NNM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Cert Supporting Documentation THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Cummins Street Retaining Wall Reconstruction Project DATE: November 28, 2018 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Cummins Street Retaining Wall Reconstruction Project, as completed by Drew Cook & Sons Excavating, Inc., in the final contract amount of$97,664.52, which is an increase from the original contract amount of$93,591 .50. The additional cost is primarily due to the addition of a black pipe railing along the wall. I concur with the recommendation and respectfully request Mayor and City Council approval. �� �� ��� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque � Du B E �.�����" ,� ��� �� Masterpiece on the Mississippi Z°°'�Z°12 2013•2017 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer rr, , � v , DATE: November 27, 2018 RE: Cummins Street Retaining Wall Reconstruction Project INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Cummins Street Retaining Wall Reconstruction Project. BACKGROUND The Cummins Street Retaining Wall Reconstruction Project provided for the removal of an existing concrete retaining wall and replaced with a new modular redi-rock retaining wall. This modular block wall simulates a natural limestone look at less cost with faster installation. The length of the retaining wall is approximately 121 LF. The project also included a railing, 165 LF of new curb and gutter, sidewalk and replacement of an ADA ramp. DISGUSSION The Cummins Street Retaining Wall Reconstruction Project was completed by Drew Cook & Sons Excavating, Inc. of Dubuque, lowa, in the final contract amount of $97,664.52, which is an increase from the original contract in the amount of $93,591.50. The additional cost is primarily due to the addition of a black pipe railing along the wall. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $97,664.52 to Drew �ook & Sons Excavating, Co., Inc. for the Cummins Street Retaining Wall Reconstruction Project. BUDGET IMPACT The project cost summary for the Cummins Street Retaining Wall Reconstruction Project is as follows: Description Estimate Award Final Construction Contract $ 110,310.00 $ 93,591.50 $ 97,664.52 Contingency 11,031.00 11,031.00 0.00 Contract Admin / Construction Engineering 18,201.15 18,201.15 9,766.45 Total Project Cost � 139,542.15 $ 122.823.65 1Q7.430.97 Th� praj�ct funding summ�ry is as follows: CIP Fundinq Source Amount 3001029 Stone Retaining Walls � 107,43U.97 Total Project Funding $ 107,430,97 ACTION TO BE TAKEN The City Council is requestec� to adopt the �tt�ci�ed resolution to acc�pt the improv�m�nts �nd to authorize the payment of the contract amount of �97,664.52 to Drcw Cook & Sons Excav�ting, Co., Inc. f�r th� Cummins Street Retaining W�II Reconstruction Project. GNP:kb Attachments cc: Jenny Larson, Budget Director Bob Schiesl, Assistant City EnginPer 2 RESOLUTION NO. 356-18 ACCEPTING THE CUMMINS STREET RETAINING WALL RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Cummins Street Retaining Wall Reconstruction Project (the Project) has been completed by the Contractor, Drew Cook & Sons Excavating, Co., Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $97,664.52; and WHEREAS, the Contractor has previously been paid $83,008.64, leaving a balance of $14,655.88; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA THAT: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $14,655.88 as provided in Iowa Code Chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code Chapter 573 or Iowa Code Chapter 26.13. Passed, approved and adopted this 3rd day of December 2018. 4P L Attest: Kin S. 'Firnstahl, City Clerk y D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE CUMMINS STREET RETAINING WALL RECONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, lowa, hereby certifies that he has inspected the Cummins Street Retaining Wall Reconstruction Project, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $107,430.97. , �— �� Dated thi� day of , 2018. � i' � "; Gus Psihoyos, City Engin er j; ji � � e �e f; Filed in the office of the City Clerk on th�"����day of1 . ;����°"',2018. �� U �. ,... � � ' �....,�� _�� �--�--�---- � �.,��'"�� ��.� Kev�n . Firnstahl, C�C, City Clerk � I,f � ;� ,� � � �