Loading...
Bee Branch Railroad Infrastructure (Culvert) Improvements Engineering Task Order 18-01 Copyrighted December 3, 2018 City of Dubuque Consent Items # 20. ITEM TITLE: Bee Branch Railroad Infrastructure (Culvert) Improvements - Engineering Task Order No. 18-01 SUMMARY: City Manager recommending approval of Task Order 18-01 for Strand Associates to provide engineering services for the Bee Branch Railroad Culverts Project. SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Approve ATTACHMENTS: Description Type Bee Branch Railroad Cul�rt Impro�ments-NNM Memo City Manager Memo Staff Memo Staff Memo Task Order 18-01 Supporting Documentation THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Bee Branch Railroad Infrastructure (Culvert) Improvements Engineering Services Task Order No. 18-01 [CIP #2642769, Project No. 1X0004] DATE: November 28, 2018 City Engineer Gus Psihoyos recommends City Council approval of Task Order 18-01 for Strand Associates to provide engineering services for the Bee Branch Railroad Culverts Project. In March of 2017, an Agreement for Technical Services (Agreement) with Strand Associates (Strand) was executed establishing that Strand would provide consulting engineering services related to the Bee Branch Railroad Culverts Project. As outlined in the Agreement, the services to be provided under the Agreement were to be outlined in subsequently issued Task Orders. In March of 2017, Task Order 17-01 was executed and outlined that Strand would work through the process of preparing an engineering design acceptable to Canadian Pacific Railway. With the execution of Task Order No. 18-01 , the scope of services will establish that Strand Associates would provide engineering services required to produce the final design in the form of the bid package. The cost to pertorm the work will be billed on an hourly rate basis (plus expenses) up to a not-to-exceed fee of$560,000.00. I concur with the recommendation and respectfully request Mayor and City Council approval. �� �� ��� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer 2 Dubuc�ue T'HE CITY OF � DUB E "°.���C��� I ► Mc�sterpiece on the Mississip�i � :,��;.Z„��.z�,�,,t�,�; TO: Michael C. Van Milligen, City Manager �.9"' � � ����� FROM: Gus Psihoyos, City Engineer ,f ���--�` . , �. ,� SUBJECT: Bee Branch Railroad Infrastructure (Culvert) Improvements Engineering Services Task Order No. 18-01 [CIP #2642769, Project No. 1X0004] DATE: November 28, 2018 INTRODUCTION The purpose of this memo is to seek approval and execution of Task Order 18-01 for Strand Associates to provide engineering services for the Bee Branch Railroad Culverts Project. These are improvements associated with the HUD NDRC funds for the Bee Branch Watershed Flood Mitigation Project. BACKGROUND On August 18, 2008, the City Council approved authorization to negotiate a professional services agreement with Strand for design and engineering services for the Bee Branch Creek Restoration Project (Project). On October 22, 2008, the City Manager executed an agreement with Strand. In January 2016, the State was awarded $95.7 million in HUD National Disaster Resiliency Competition grant funds. Per the award, the City of Dubuque is to receive $23.1 million for storm water infrastructure improvements associated with the Bee Branch Watershed Flood Mitigation Project. The infrastructure improvements included the installation of a large diameter storm sewer along 17th Street from the (Lower) Bee Branch Creek, under the railroad tracks on Pine Street, and continuing west to W. Locust Street. The work includes inlets and local sewer connections to the storm sewer and the complete reconstruction of the street and other underground utilities along street right-of-way corridor. In October of 2016, the City Council passed Resolution 362-16 authorizing the execution of the funding contract with the lowa Economic Development Authority (IEDA) for the City's receipt of$23,309,600.00 in Community Development Block Grant Program Disaster Recovery - National Disaster Resiliency funds for the Bee Branch Watershed Flood Mitigation Project. In March of 2017, an Agreement for Technical Services (Agreement) with Strand Associates (Strand) was executed establishing that Strand would provide consulting engineering services related to the Bee Branch Railroad Culverts Project. As outlined in the Agreement, the services to be provided under the Agreement were to be outlined in subsequently issued Task Orders. In March of 2017, Task Order 17-01 was executed. It outlined that Strand would work through the process of preparing an engineering design acceptable to Canadian Pacific Railway. DISCUSSION With the execution of Task Order No. 18-01, the scope of services will establish that Strand Associates would provide engineering services required to produce the final design in the form of the bid package. Task Order 18-01 is an extension of Task Order 17-01. The cost to perform the work will be billed on an hourly rate basis (plus expenses) up to a not-to-exceed fee of$560,000.00. BUDGETIMPACT The expenses related to Task Order No. 18-01 were presented at the quarterly Bee Branch Watershed Flood Mitigation Budget meeting on September 6, 2018 and reflected in the funding plan outlined thereon. The engineering services will be covered using $23,100,000.00 in Community Development Block Grant Program Disaster Recovery - National Disaster Resiliency funds for the Bee Branch Watershed Flood Mitigation Project. These funds are available now and can be drawn from immediately after making payments to Strand for engineering services. ACTION TO BE TAKEN I respectfully request execution of the attached Task Order No. 18-01 for engineering services for the Bee Branch Railroad Culvert Project which is associated with the Bee Branch Watershed Flood Mitigation Project. Attach. Prepared by Deron Muehring cc: John Tharp, (HUD) Grant Steve Brown, Project Manager Deron Muehring, Civil Engineer TO 18-01-RR Crossing Final Design-l l blonths-Dec'17-Nov'18 10 SrV IRV BTE ABE KSD Expenses Labor Expense Task Task H;ric V Uave W Jerry 11 Shane'L Paul D Kristine '1'0��1 L, Sean 13 I,uke II Steve S Dinne Cech Admin Nlike J Laur.R Court.W Dave S Arch. Tech hlich.K DB DUKK Abl/RD CPU Sub Other Subtotal Subtotal Task Subtotal Flours Project�lanagement $ I�lft,2d8 PM Correspondence(EmaiUPhone) 80 80 30 6 C 40 40 $ 2,C43 $38,078 $ 3,617 $ 41,695 242 [nternal Staff titeetings/Coordination 30 8 8 16 16 4 4 4 l6 l2 8 30 30 24 24 20 20 l0 63 $ 2,212 $40,235 $ 3,543 $ 43,777 234 Subconsultant Yieetings/Coordination 40 16 20 23 $ 390 $I1,S40 $ 922 $ I2,462 76 Weekly City Meetings/Conf.Calls l00 l6 8 8 8 12 80 20 l0 l2 76 $ 2,134 $2,500 $43,880 $ 6,435 $ 50,315 274 Stakhol(Icr Coordinafion 5 76,8�32 CPR Correspondence and Meetings 8 8 40 40 4 $ 1,736 $5,000 $18,520 $ 7,480 $ 26,000 96 Right-of-Way Management,Meetings l6 80 32 43 $ 624 $25,760 $ 1,531 $ 27,291 l28 Easement Exhibits and Desc.(6) 4 S g 7$ $ 1,192 $14,220 $ 1,31 l $ 15,531 95 Prime Con[racror Meetinos 24 20 l2 $ 390 $ 7,380 $ 640 $ 8,020 44 7'opographic Survey $ Z3,g7( Preparation 2 2 l0 2 $ l33 $ 1,901 $ 187 $ 2,088 l4 Lower Bee Branch,piezometers,borings,monitoring wells 4 4 50 2 $ 769 $ 8,267 $ 88l $ 9,147 58 Survey and Data Reduction(Boundary),Boring Staking,Set Pins,CP ROW 4 20 4 40 12 $ 631 $2,500 $ 9,085 $ 3,G55 $ 12,740 68 F,nginecring AnHtysis $ ���,((» Geoteclinical An�lysis(Vihrntion Mqnitqring-RR,Test Pile) C� 30 40 l5 10 l32 3 $ 3,353 $2,400 $34,400 $ 6,331 $ 40,781 233 Twin Box Analysis-GPR 4 2 $ - $I7,000 $ 580 $18,735 $ 19,315 4 Environmental Analysis and Sampling,Sediment Sampling 4 l08 l20 60 116 $ 870 $8,500 $39,220 $12,349 $ 5(,569 292 I)esign $ 180,799 Sluice Gate and Ramp Design 4 24 8 2 24 40 2 S l $ 39 $14,5 I0 $ 94l $ 15,451 l04 Level Control Gate Flushing System Design 4 8 IG 8 18 $ - $ 4,820 $ 3l7 $ 5,137 36 Water Service Design-Maintenance 4 8 l2 g IG $ - $ 4,440 $ 282 $ 4,722 32 ImgationDesian 8 8 8 4 l2 $ 48 $3,500 $ 3,440 $ 4,114 $ 7,554 28 Ped Tunnel Entry-Structural Retaining Walls 4 l2 10 IO 50 90 8 $ 1,964 $21,600 $ 2,301 $ 23,901 l76 Ped Tunnel Entry-Landscaping Retaining Walls 4 12 8 4 4 24 40 l2 $ 88l $l 1,648 $ 1,180 $ t2,328 96 Ped'Cunnel Rehab-Stnicturnl Design 4 30 20 40 SO 2 $ 1,953 $20,110 $ 2,184 $ 22,294 144 Ped Tunnel-Lighting 4 2 20 l2 l9 $ - $ 4,520 $ 334 $ 4,854 38 Ped Tunnel-Video Surveillance 4 2 20 12 l9 $ - $ 4,520 $ 334 $ 4,854 38 Ped Tunnel-Drainage and Pumping 4 8 l6 16 2 6 22 $ 103 $ 6,726 $ 500 $ 7,226 52 Temporary Soil Retention DetaiVOld Main Shutdown 8 40 10 20 4 $ l,l24 $12,400 $ 1,307 $ 13,707 78 Ped Tunnel-Trail Design 8 80 20 20 54 $ 240 $14,960 $ 1,214 $ 16,174 128 Pwnp Station Trash Rack,Screen System,Stop Logs 4 40 8 I( fi0 64 $ - $18,340 $ l,l26 $ 19,466 l28 Architectural Design-Add'I 3D ModelinglDetails 4 2 2 20 20 l00 12 $ 1,946 $2Q490 $ 2,141 $ 22,631 l60 Construction Documents and Bidding $ �g,47fl Technical Specs-Additonal Design/GCs 24 8 8 4 8 8 8 4 l6 20 10 54 $ l95 $468 $16,790 $ I,680 $ 18,470 1 l3 Total[ndividual Hours: 4l3 80 l6 8 80 l76 100 62 l l6 l20 l l8 224 28 434 l54 l54 271 I30 195 20 40 232 88 763 $ 41,868 Houis 3,264 Rates: $ l45 $ l95 $ l85 $ 210 $ 200 $ ll5 $ 215 $ ll0 $ I55 $ ll0 $ ll0 $ ll0 $ 85 $ 195 $ l55 $ l32 $ 106 $ I20 $ 138 $ 75 $ 250 $ l45 $ l20 $ 16 $ - $ - Cost: $ 60,610 $15,600 $2,960 $ 1,680 $16,000 $2Q240 $21,500 $ 6,820 $17,980 $13,200 $12,980 $24,640 $2,380 $ 84,630 $23,870 $20,323 $28,726 $15,600 $26,935 $ 1,500 $10,000 $33,640 $10,560 $ 13,429 $ 25,579 $ 46,055 Total Eng.Services $ 560,000 C Cseis dmueh�in AppData Local MicrusoR W'indows Temporary[ntemet Files ContenLOutlook`I VPPSPSV I3ee[3�nnch RR Crossing Design 7'O 18-01 E{ourly 6reakdown.xls Upper Bee Branch Creek- Railroad Culvert and Sewer Crossing Engineering Services-Earned Value Summary-June 201E City of Dubuque,lowa TASK ORDER SUMMARY Engineering Services-Scope Items � Total Project Management � Project Admir�strasion f�eb'17 t�Sdo•�'176 TO 17-C1'�- 36.9'3 Project Administration(Dec'17 io Nov'18)TO 18-01 42,209 RR Entry,'Insurance TO 17-01 33,900 Meetings jFeb'17 to Nov'17}TU 17-01 85.544 Nleetings(Dec'17 to Nov'18)TO 18-U1 106,553 Cost C)pinions�O 17-01 16.350 Stakehoider Co�rdination �� Permi;s TO 17-01 7,030 Util�ty Coordinat�on TO 1 7-01 2.854 CPR Goordinatioi�,Meetings,and Submittals T�17-01 61,�155 CPR In Person MeeEng and CPR Re-Submittals TO 18-01 26,000 'r Easements TO 17-01 11,805 Revised Easements, RUW NlanagemenUAcquisition Assistance TO 18-01 42.822 Trenchless Gontractors TO 17-01 �.��5 Prime Cnn!ractor tileetif:gs TO 18-01 � 8:020� Survey �� Topo and Laser Survey Prep S,arvey,and Data Redu�t�on TO 17-0"I �11,079� Boundary Survey,Set#ing Pins,Staking Borings/MWs,Additional Laser Scan TO 18-01� 23,976 Engineering Araalysis �t�droloyic N�dr<iu'c P.1ode,n�and Tech ti�emo TO �7-�1 34.934 Geotechr�icai TO i 7-01 3'@.762 Additunal Geotechnical TO 18-01 40,782 Hydroc�eological Analysos TO 17-01; 15.328 Twin Box Analys�s TO 17-01� 29,536 Twin Box Anal�sis-Ground Penetrating Radar TO 18-01� �19,315 Enviroi�mentai Analys�s TO 17-01 27.238 Addit'onal Environmental Analysis TO 18-01 51.569 D�sign f----------- Level Control Gate SysEem,Pump�iig Stat�on,�n�Force h1ain TO'i7-01� 98.075 Level Conirol Gate and Pumpeng Station-Trash Hack,Stop Logs,and Flushing System TO 18-01 24,603 Sluice Gate and l�ccess Ramp TO 18-01 15,451 Roaciway and Grading Plans,SV`JPPP TO 17-01 25.578 Pedetria+i Trail and Grading Plans TO 18-01 16 17n La�dscapin�a�d Resdorat on TO 17-�t� 17,777' Electrical Net��vorkirg Ligh'.ing,Cathodic;Protection TO 17-01 22 895 Twin Box CulvertPedestrian Trail Lighting and Cameras TO 18-01 �9,708 Temporary So'sl Retention TQ 17-01 56,808 Twin Box Culvert-Temporary Soil Retention TO 18-01 13,707 Trenr,hl�ss Ciilverls�nd SPwer T(� 17-01 3 583 Local Storm and Sanitary Se�ver TO 17-01 4,672 Twin Box Pedestria�i Trail Storm Sewer,Yard Hydrant Sys#em,and Irrigation TO 18-0' 19,502 Tere�porary Staging/Stormwater Hancllin.g TQ 17-01 20.751 Structurai Design(Outlet Structure,TYans�tion Structure,Triple Box Cu�vertl TO 17-01 109,032 Dewateri�;q TO 17-01 15.d21 Architectur;tE Desiyn,�Ftenderi�ogs TO 17-01 24,150 Ad�litional Archituctural Desiyri,Re^eierings TO 18-01 22.631 ISI Envision TO 17-U1 6-1,186 Tevin Box Cu✓ert Strur,tiir�l Rehnbi';t�'.ior F'e�iestrian Tr�il Retc�ining W�IIs TO 18-01 59.023 G�mStructian t�ncumantn 3nd f�idcling - Spf;cific�aPons TC) 17-01 80,272 ncicl:ti:>n:il i�e„hn ai!S�f;dficatic�rs TO 1fS �1 17,�)55 PLue Pr��duct;��n fl)11-OI 67.5�11 f'r�:-13ie1�,1�;e;'.'nr�.Adc1e:��d:i, B e!OE� �i ri:�,Bi;',�n<ilysis I U 17-0' S 3,621 Sub-Tot�is 1,642,U00 � Stranc9 Associates, Inc� � . . 910 West Wingra Drive Madison,WI 53715 � (P)608-251-4843 STRAN D ASSOCIA�ES� Task Order No. 18-01 City of Dubuque Iowa (OWNER) and Strand Ass�ciates, Inc.�(F,NGINECR) Pursuant to Tecluiical Services Agreement dated March 14,2017 Bee F3ranch Creek Railroad Culverts(Bee Branch Creek Kestoration Project) Project Information Project Name: Upper E3ee 13ranch Creek—Railroad Culverts and Sanitary Sewer Crossing Project Description: OWNCR requires the construction of trenchless stormwater culvert pipes and sanitary sewer across the Canadian Pacific Railway(CPR), including the construction of box culverts, a transition structure, outlet structure, level control gates and pumping station, storm sewer, electrical and lighti�ig, a parking lot, a trail connection, and other miscellaneous landscaping and restoration elements. Services Description: Additional survey and design for the construction of culvert pipes anci sanitary se�ver across tlle CPR. Scone of Services ENGINEER will provide the following services to OWNER: 1. Project Management a. Schedule, attend (either in person or via te(econference), and facilitate weekly meetings with UWNL;R. ENUINEER and an IIW P.C. representative are anticipated to attend eacli meeting. b. Participate i�i communications via e-mail and telephone with appropriate OWNER staff. 2. Stakellolder Interaction a. Communicate and meet(up to three in-person meetings)witl�trenchless and temporaiy soil retention specialty contractors to assist in design development and opinions of probable construction cost. b. Co�nmunicatc �nd meet (up to 10 in person meetitigs) with OWNER right-of-way acc�uisition consultants and property owners impacted by right-of-way acquisiti�n for the project. 3. Survcy—Data Collection a. I,oc;ate property irons for the following properties requiring real estate acquisition: CPR, [3ard Materials, A-1 Crane, Robcrt Klaucr, and I�i�h�vay 151/61 Development. b. Provide laser scan topographic survey of the CPR corridor 200 feet norih and south beyond the project limits. 1�,D�'�Jc R DfAll Uo�timertts A�eements U Uubuyue,City of(IA)'I SA IiBC Railrtud('ul�erts 2017 TU 2018 1154 05),I R-(11 d�xx Strand Associates, Inc:'' City of Dubuque 1'ask Order No. 18-01 Pa�c 2 Au�ust 22, 2018 4. Engineering Analysis a. F,nviro�imental Analysis: Yrovide up to teti soil samples from OWNE;R property for laboi•atocy analysis and test for hydrocarbons,volatile or�ariic hydrocarbons,polycyclic aromatic hydrocarbon,and Resource Conservation and Kecovery Act metals;summarize �ndings in a brief report. b. Sediment Analysis: Provide eight sediment samples from the existing Bee f3ranch channel for sieve and laboratory analysis to classii'y and charaeterize existing soils. c. Temporary Soil Retention Analysis: Provide request for proposal documentation including an exhibit and technical specification for test sheetpile installation. Provide vibration and settlement monitoring during test pile installatio�i. 5. Design Prepare the following final drawin�s and specifications and submit to OWNER for review at the 60 percent and 90 percent level completion. a. Structural: Prepare drawings and specifications for concrete retaining walls at the pedestrian tunnel entry,the rehabilitation of the existing twin box culverts, and an eiitry ramp to the transition structure. b. Level Control Gates and Pumping Station/Force Main: Prepare drawings and specifications for the construction of a sluice gate, hinge crest gate flushing system, and pump statioti tcasll rack/screen system. c. Grading and Restoration: Yrepare drawings and specifications for the trail connection to the existing L,ower Bee Branch trail and existing twin box culverts. d. Site I,ighting and Flectrical: Prepare drawings and specifications for lighting along the trail connection and inside the existing twin box culverts. e. Video Surveillance System: Prepare drawings and specifications for a video surveillaiice system along the trail connection,and an extension of the fiber optic network from the Upper Bee Brancll to the I,ower Bee Branch. f. l,andscaping: Prepare drawings and specifications for movable planter units and site furnishiiigs at the Outlet Structure. g. Ac�chitectural Rendering: Prepare updated 3U architectural renderings for proposed structure and site improvements. h. In•igation: Prepare dra�vings and specifications for in•i�ating hanging baskets and planters. i. Non-Potable Water Service System: I'repare drawiiigs and specifications for non-potable ��vater ser��ice and flushing systems for maintenance of the landscape elements post-construction. j. Drainage and I'umping: 1'repare dra�vings and specificatious for a trench drain and pumping system for the existing t���in box culvert. Initials R.1f AD Ducuments Agrecments U I hibuque,Citp ot(IA).TSA I3BC ktsih o�dCul�erts 201TT0 2018'I l sd 059 I R-01 ducr Strand Associates, Inc® City of Dubuque Task Order No. 18-01 Page 3 August 22, 2018 Compensation OWNER shall compensate ENGINEER for Services under this Task Order on an hourly rate basis plus expenses an estimated fee of $560,000. Schedule Services will begin upon execution of this Task Order, which is anticipated on June 25, 2018. Services are scheduled for completion in accordance with the following milestones. Milestone Date Final Drawings and Specifications Completion August 1, 2018 Bid Opening (Completion of Services) November 1, 2018 TASK ORDER AUTHORIZATION AND ACCEPTANCE: ENGINEER: STRAND ASSOCIATES, INC.® OWNER: City of Dubuque f f�61_ Matthew S. Richards Date Michael C. Van Milligan Date City Manager Corporate Secretary Initials\R:\MAD\Documents\Agreements\D\Dubuque, City of(IA)\TSA_BBC RailroadCulverts2017\TO\2018\1154.059.18-01.docx www.strand,com