Bee Branch Railroad Infrastructure (Culvert) Improvements Engineering Task Order 18-01 Copyrighted
December 3, 2018
City of Dubuque Consent Items # 20.
ITEM TITLE: Bee Branch Railroad Infrastructure (Culvert) Improvements
- Engineering Task Order No. 18-01
SUMMARY: City Manager recommending approval of Task Order 18-01
for Strand Associates to provide engineering services for
the Bee Branch Railroad Culverts Project.
SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Approve
ATTACHMENTS:
Description Type
Bee Branch Railroad Cul�rt Impro�ments-NNM Memo City Manager Memo
Staff Memo Staff Memo
Task Order 18-01 Supporting Documentation
THE CITY OF Dubuque
�
AIFA�erlwGh
UB E '�� III►
Masterpiece on the Mississippi Z°°'�w'2
7A13 2017
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Bee Branch Railroad Infrastructure (Culvert) Improvements
Engineering Services Task Order No. 18-01
[CIP #2642769, Project No. 1X0004]
DATE: November 28, 2018
City Engineer Gus Psihoyos recommends City Council approval of Task Order 18-01 for
Strand Associates to provide engineering services for the Bee Branch Railroad Culverts
Project.
In March of 2017, an Agreement for Technical Services (Agreement) with Strand
Associates (Strand) was executed establishing that Strand would provide consulting
engineering services related to the Bee Branch Railroad Culverts Project. As outlined in
the Agreement, the services to be provided under the Agreement were to be outlined in
subsequently issued Task Orders.
In March of 2017, Task Order 17-01 was executed and outlined that Strand would work
through the process of preparing an engineering design acceptable to Canadian Pacific
Railway.
With the execution of Task Order No. 18-01 , the scope of services will establish that
Strand Associates would provide engineering services required to produce the final
design in the form of the bid package.
The cost to pertorm the work will be billed on an hourly rate basis (plus expenses) up to
a not-to-exceed fee of$560,000.00.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
�� �� ���
Mic ael C. Van Milligen �� �
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Teri Goodmann, Assistant City Manager
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
2
Dubuc�ue
T'HE CITY OF �
DUB E "°.���C���
I ►
Mc�sterpiece on the Mississip�i �
:,��;.Z„��.z�,�,,t�,�;
TO: Michael C. Van Milligen, City Manager
�.9"' � � �����
FROM: Gus Psihoyos, City Engineer ,f ���--�`
. , �. ,�
SUBJECT: Bee Branch Railroad Infrastructure (Culvert) Improvements
Engineering Services Task Order No. 18-01
[CIP #2642769, Project No. 1X0004]
DATE: November 28, 2018
INTRODUCTION
The purpose of this memo is to seek approval and execution of Task Order 18-01 for
Strand Associates to provide engineering services for the Bee Branch Railroad Culverts
Project. These are improvements associated with the HUD NDRC funds for the Bee
Branch Watershed Flood Mitigation Project.
BACKGROUND
On August 18, 2008, the City Council approved authorization to negotiate a professional
services agreement with Strand for design and engineering services for the Bee Branch
Creek Restoration Project (Project). On October 22, 2008, the City Manager executed an
agreement with Strand.
In January 2016, the State was awarded $95.7 million in HUD National Disaster Resiliency
Competition grant funds. Per the award, the City of Dubuque is to receive $23.1 million for
storm water infrastructure improvements associated with the Bee Branch Watershed Flood
Mitigation Project. The infrastructure improvements included the installation of a large
diameter storm sewer along 17th Street from the (Lower) Bee Branch Creek, under the
railroad tracks on Pine Street, and continuing west to W. Locust Street. The work includes
inlets and local sewer connections to the storm sewer and the complete reconstruction of
the street and other underground utilities along street right-of-way corridor.
In October of 2016, the City Council passed Resolution 362-16 authorizing the execution
of the funding contract with the lowa Economic Development Authority (IEDA) for the City's
receipt of$23,309,600.00 in Community Development Block Grant Program Disaster
Recovery - National Disaster Resiliency funds for the Bee Branch Watershed Flood
Mitigation Project.
In March of 2017, an Agreement for Technical Services (Agreement) with Strand
Associates (Strand) was executed establishing that Strand would provide consulting
engineering services related to the Bee Branch Railroad Culverts Project. As outlined in
the Agreement, the services to be provided under the Agreement were to be outlined in
subsequently issued Task Orders.
In March of 2017, Task Order 17-01 was executed. It outlined that Strand would work
through the process of preparing an engineering design acceptable to Canadian Pacific
Railway.
DISCUSSION
With the execution of Task Order No. 18-01, the scope of services will establish that
Strand Associates would provide engineering services required to produce the final design
in the form of the bid package. Task Order 18-01 is an extension of Task Order 17-01.
The cost to perform the work will be billed on an hourly rate basis (plus expenses) up to a
not-to-exceed fee of$560,000.00.
BUDGETIMPACT
The expenses related to Task Order No. 18-01 were presented at the quarterly Bee
Branch Watershed Flood Mitigation Budget meeting on September 6, 2018 and reflected in
the funding plan outlined thereon.
The engineering services will be covered using $23,100,000.00 in Community
Development Block Grant Program Disaster Recovery - National Disaster Resiliency funds
for the Bee Branch Watershed Flood Mitigation Project. These funds are available now
and can be drawn from immediately after making payments to Strand for engineering
services.
ACTION TO BE TAKEN
I respectfully request execution of the attached Task Order No. 18-01 for engineering
services for the Bee Branch Railroad Culvert Project which is associated with the Bee
Branch Watershed Flood Mitigation Project.
Attach.
Prepared by Deron Muehring
cc: John Tharp, (HUD) Grant
Steve Brown, Project Manager
Deron Muehring, Civil Engineer
TO 18-01-RR Crossing Final Design-l l blonths-Dec'17-Nov'18 10
SrV IRV BTE ABE KSD Expenses Labor Expense Task
Task H;ric V Uave W Jerry 11 Shane'L Paul D Kristine '1'0��1 L, Sean 13 I,uke II Steve S Dinne Cech Admin Nlike J Laur.R Court.W Dave S Arch. Tech hlich.K DB DUKK Abl/RD CPU Sub Other Subtotal Subtotal Task Subtotal Flours
Project�lanagement $ I�lft,2d8
PM Correspondence(EmaiUPhone) 80 80 30 6 C 40 40 $ 2,C43 $38,078 $ 3,617 $ 41,695 242
[nternal Staff titeetings/Coordination 30 8 8 16 16 4 4 4 l6 l2 8 30 30 24 24 20 20 l0 63 $ 2,212 $40,235 $ 3,543 $ 43,777 234
Subconsultant Yieetings/Coordination 40 16 20 23 $ 390 $I1,S40 $ 922 $ I2,462 76
Weekly City Meetings/Conf.Calls l00 l6 8 8 8 12 80 20 l0 l2 76 $ 2,134 $2,500 $43,880 $ 6,435 $ 50,315 274
Stakhol(Icr Coordinafion
5 76,8�32
CPR Correspondence and Meetings 8 8 40 40 4 $ 1,736 $5,000 $18,520 $ 7,480 $ 26,000 96
Right-of-Way Management,Meetings l6 80 32 43 $ 624 $25,760 $ 1,531 $ 27,291 l28
Easement Exhibits and Desc.(6) 4 S g 7$ $ 1,192 $14,220 $ 1,31 l $ 15,531 95
Prime Con[racror Meetinos 24 20 l2 $ 390 $ 7,380 $ 640 $ 8,020 44
7'opographic Survey $ Z3,g7(
Preparation 2 2 l0 2 $ l33 $ 1,901 $ 187 $ 2,088 l4
Lower Bee Branch,piezometers,borings,monitoring wells 4 4 50 2 $ 769 $ 8,267 $ 88l $ 9,147 58
Survey and Data Reduction(Boundary),Boring Staking,Set Pins,CP ROW 4 20 4 40 12 $ 631 $2,500 $ 9,085 $ 3,G55 $ 12,740 68
F,nginecring AnHtysis $ ���,((»
Geoteclinical An�lysis(Vihrntion Mqnitqring-RR,Test Pile) C� 30 40 l5 10 l32 3 $ 3,353 $2,400 $34,400 $ 6,331 $ 40,781 233
Twin Box Analysis-GPR 4 2 $ - $I7,000 $ 580 $18,735 $ 19,315 4
Environmental Analysis and Sampling,Sediment Sampling 4 l08 l20 60 116 $ 870 $8,500 $39,220 $12,349 $ 5(,569 292
I)esign $ 180,799
Sluice Gate and Ramp Design 4 24 8 2 24 40 2 S l $ 39 $14,5 I0 $ 94l $ 15,451 l04
Level Control Gate Flushing System Design 4 8 IG 8 18 $ - $ 4,820 $ 3l7 $ 5,137 36
Water Service Design-Maintenance 4 8 l2 g IG $ - $ 4,440 $ 282 $ 4,722 32
ImgationDesian 8 8 8 4 l2 $ 48 $3,500 $ 3,440 $ 4,114 $ 7,554 28
Ped Tunnel Entry-Structural Retaining Walls 4 l2 10 IO 50 90 8 $ 1,964 $21,600 $ 2,301 $ 23,901 l76
Ped Tunnel Entry-Landscaping Retaining Walls 4 12 8 4 4 24 40 l2 $ 88l $l 1,648 $ 1,180 $ t2,328 96
Ped'Cunnel Rehab-Stnicturnl Design 4 30 20 40 SO 2 $ 1,953 $20,110 $ 2,184 $ 22,294 144
Ped Tunnel-Lighting 4 2 20 l2 l9 $ - $ 4,520 $ 334 $ 4,854 38
Ped Tunnel-Video Surveillance 4 2 20 12 l9 $ - $ 4,520 $ 334 $ 4,854 38
Ped Tunnel-Drainage and Pumping 4 8 l6 16 2 6 22 $ 103 $ 6,726 $ 500 $ 7,226 52
Temporary Soil Retention DetaiVOld Main Shutdown 8 40 10 20 4 $ l,l24 $12,400 $ 1,307 $ 13,707 78
Ped Tunnel-Trail Design 8 80 20 20 54 $ 240 $14,960 $ 1,214 $ 16,174 128
Pwnp Station Trash Rack,Screen System,Stop Logs 4 40 8 I( fi0 64 $ - $18,340 $ l,l26 $ 19,466 l28
Architectural Design-Add'I 3D ModelinglDetails 4 2 2 20 20 l00 12 $ 1,946 $2Q490 $ 2,141 $ 22,631 l60
Construction Documents and Bidding $ �g,47fl
Technical Specs-Additonal Design/GCs 24 8 8 4 8 8 8 4 l6 20 10 54 $ l95 $468 $16,790 $ I,680 $ 18,470 1 l3
Total[ndividual Hours: 4l3 80 l6 8 80 l76 100 62 l l6 l20 l l8 224 28 434 l54 l54 271 I30 195 20 40 232 88 763 $ 41,868 Houis 3,264
Rates: $ l45 $ l95 $ l85 $ 210 $ 200 $ ll5 $ 215 $ ll0 $ I55 $ ll0 $ ll0 $ ll0 $ 85 $ 195 $ l55 $ l32 $ 106 $ I20 $ 138 $ 75 $ 250 $ l45 $ l20 $ 16 $ - $ -
Cost: $ 60,610 $15,600 $2,960 $ 1,680 $16,000 $2Q240 $21,500 $ 6,820 $17,980 $13,200 $12,980 $24,640 $2,380 $ 84,630 $23,870 $20,323 $28,726 $15,600 $26,935 $ 1,500 $10,000 $33,640 $10,560 $ 13,429 $ 25,579 $ 46,055 Total Eng.Services $ 560,000
C Cseis dmueh�in AppData Local MicrusoR W'indows Temporary[ntemet Files ContenLOutlook`I VPPSPSV I3ee[3�nnch RR Crossing Design 7'O 18-01 E{ourly 6reakdown.xls
Upper Bee Branch Creek- Railroad Culvert and Sewer Crossing
Engineering Services-Earned Value Summary-June 201E
City of Dubuque,lowa
TASK ORDER SUMMARY
Engineering Services-Scope Items � Total
Project Management �
Project Admir�strasion f�eb'17 t�Sdo•�'176 TO 17-C1'�- 36.9'3
Project Administration(Dec'17 io Nov'18)TO 18-01 42,209
RR Entry,'Insurance TO 17-01 33,900
Meetings jFeb'17 to Nov'17}TU 17-01 85.544
Nleetings(Dec'17 to Nov'18)TO 18-U1 106,553
Cost C)pinions�O 17-01 16.350
Stakehoider Co�rdination ��
Permi;s TO 17-01 7,030
Util�ty Coordinat�on TO 1 7-01 2.854
CPR Goordinatioi�,Meetings,and Submittals T�17-01 61,�155
CPR In Person MeeEng and CPR Re-Submittals TO 18-01 26,000
'r Easements TO 17-01 11,805
Revised Easements, RUW NlanagemenUAcquisition Assistance TO 18-01 42.822
Trenchless Gontractors TO 17-01 �.��5
Prime Cnn!ractor tileetif:gs TO 18-01 � 8:020�
Survey ��
Topo and Laser Survey Prep S,arvey,and Data Redu�t�on TO 17-0"I �11,079�
Boundary Survey,Set#ing Pins,Staking Borings/MWs,Additional Laser Scan TO 18-01� 23,976
Engineering Araalysis
�t�droloyic N�dr<iu'c P.1ode,n�and Tech ti�emo TO �7-�1 34.934
Geotechr�icai TO i 7-01 3'@.762
Additunal Geotechnical TO 18-01 40,782
Hydroc�eological Analysos TO 17-01; 15.328
Twin Box Analys�s TO 17-01� 29,536
Twin Box Anal�sis-Ground Penetrating Radar TO 18-01� �19,315
Enviroi�mentai Analys�s TO 17-01 27.238
Addit'onal Environmental Analysis TO 18-01 51.569
D�sign f-----------
Level Control Gate SysEem,Pump�iig Stat�on,�n�Force h1ain TO'i7-01� 98.075
Level Conirol Gate and Pumpeng Station-Trash Hack,Stop Logs,and Flushing System TO 18-01 24,603
Sluice Gate and l�ccess Ramp TO 18-01 15,451
Roaciway and Grading Plans,SV`JPPP TO 17-01 25.578
Pedetria+i Trail and Grading Plans TO 18-01 16 17n
La�dscapin�a�d Resdorat on TO 17-�t� 17,777'
Electrical Net��vorkirg Ligh'.ing,Cathodic;Protection TO 17-01 22 895
Twin Box CulvertPedestrian Trail Lighting and Cameras TO 18-01 �9,708
Temporary So'sl Retention TQ 17-01 56,808
Twin Box Culvert-Temporary Soil Retention TO 18-01 13,707
Trenr,hl�ss Ciilverls�nd SPwer T(� 17-01 3 583
Local Storm and Sanitary Se�ver TO 17-01 4,672
Twin Box Pedestria�i Trail Storm Sewer,Yard Hydrant Sys#em,and Irrigation TO 18-0' 19,502
Tere�porary Staging/Stormwater Hancllin.g TQ 17-01 20.751
Structurai Design(Outlet Structure,TYans�tion Structure,Triple Box Cu�vertl TO 17-01 109,032
Dewateri�;q TO 17-01 15.d21
Architectur;tE Desiyn,�Ftenderi�ogs TO 17-01 24,150
Ad�litional Archituctural Desiyri,Re^eierings TO 18-01 22.631
ISI Envision TO 17-U1 6-1,186
Tevin Box Cu✓ert Strur,tiir�l Rehnbi';t�'.ior F'e�iestrian Tr�il Retc�ining W�IIs TO 18-01 59.023
G�mStructian t�ncumantn 3nd f�idcling -
Spf;cific�aPons TC) 17-01 80,272
ncicl:ti:>n:il i�e„hn ai!S�f;dficatic�rs TO 1fS �1 17,�)55
PLue Pr��duct;��n fl)11-OI 67.5�11
f'r�:-13ie1�,1�;e;'.'nr�.Adc1e:��d:i, B e!OE� �i ri:�,Bi;',�n<ilysis I U 17-0' S 3,621
Sub-Tot�is 1,642,U00
� Stranc9 Associates, Inc�
� . . 910 West Wingra Drive
Madison,WI 53715
� (P)608-251-4843
STRAN D
ASSOCIA�ES�
Task Order No. 18-01
City of Dubuque Iowa (OWNER)
and Strand Ass�ciates, Inc.�(F,NGINECR)
Pursuant to Tecluiical Services Agreement dated March 14,2017
Bee F3ranch Creek Railroad Culverts(Bee Branch Creek Kestoration Project)
Project Information
Project Name: Upper E3ee 13ranch Creek—Railroad Culverts and Sanitary Sewer Crossing
Project Description: OWNCR requires the construction of trenchless stormwater culvert pipes and
sanitary sewer across the Canadian Pacific Railway(CPR), including the construction of box culverts, a
transition structure, outlet structure, level control gates and pumping station, storm sewer, electrical and
lighti�ig, a parking lot, a trail connection, and other miscellaneous landscaping and restoration elements.
Services Description: Additional survey and design for the construction of culvert pipes anci sanitary
se�ver across tlle CPR.
Scone of Services
ENGINEER will provide the following services to OWNER:
1. Project Management
a. Schedule, attend (either in person or via te(econference), and facilitate weekly meetings
with UWNL;R. ENUINEER and an IIW P.C. representative are anticipated to attend eacli
meeting.
b. Participate i�i communications via e-mail and telephone with appropriate OWNER staff.
2. Stakellolder Interaction
a. Communicate and meet(up to three in-person meetings)witl�trenchless and temporaiy
soil retention specialty contractors to assist in design development and opinions of
probable construction cost.
b. Co�nmunicatc �nd meet (up to 10 in person meetitigs) with OWNER right-of-way
acc�uisition consultants and property owners impacted by right-of-way acquisiti�n for
the project.
3. Survcy—Data Collection
a. I,oc;ate property irons for the following properties requiring real estate acquisition: CPR,
[3ard Materials, A-1 Crane, Robcrt Klaucr, and I�i�h�vay 151/61 Development.
b. Provide laser scan topographic survey of the CPR corridor 200 feet norih and south
beyond the project limits.
1�,D�'�Jc R DfAll Uo�timertts A�eements U Uubuyue,City of(IA)'I SA IiBC Railrtud('ul�erts 2017 TU 2018 1154 05),I R-(11 d�xx
Strand Associates, Inc:''
City of Dubuque
1'ask Order No. 18-01
Pa�c 2
Au�ust 22, 2018
4. Engineering Analysis
a. F,nviro�imental Analysis: Yrovide up to teti soil samples from OWNE;R property for
laboi•atocy analysis and test for hydrocarbons,volatile or�ariic hydrocarbons,polycyclic
aromatic hydrocarbon,and Resource Conservation and Kecovery Act metals;summarize
�ndings in a brief report.
b. Sediment Analysis: Provide eight sediment samples from the existing Bee f3ranch
channel for sieve and laboratory analysis to classii'y and charaeterize existing soils.
c. Temporary Soil Retention Analysis: Provide request for proposal documentation
including an exhibit and technical specification for test sheetpile installation. Provide
vibration and settlement monitoring during test pile installatio�i.
5. Design
Prepare the following final drawin�s and specifications and submit to OWNER for review at the
60 percent and 90 percent level completion.
a. Structural: Prepare drawings and specifications for concrete retaining walls at the
pedestrian tunnel entry,the rehabilitation of the existing twin box culverts, and an eiitry
ramp to the transition structure.
b. Level Control Gates and Pumping Station/Force Main: Prepare drawings and
specifications for the construction of a sluice gate, hinge crest gate flushing system, and
pump statioti tcasll rack/screen system.
c. Grading and Restoration: Yrepare drawings and specifications for the trail connection to
the existing L,ower Bee Branch trail and existing twin box culverts.
d. Site I,ighting and Flectrical: Prepare drawings and specifications for lighting along the
trail connection and inside the existing twin box culverts.
e. Video Surveillance System: Prepare drawings and specifications for a video surveillaiice
system along the trail connection,and an extension of the fiber optic network from the Upper
Bee Brancll to the I,ower Bee Branch.
f. l,andscaping: Prepare drawings and specifications for movable planter units and site
furnishiiigs at the Outlet Structure.
g. Ac�chitectural Rendering: Prepare updated 3U architectural renderings for proposed
structure and site improvements.
h. In•igation: Prepare dra�vings and specifications for in•i�ating hanging baskets and planters.
i. Non-Potable Water Service System: I'repare drawiiigs and specifications for non-potable
��vater ser��ice and flushing systems for maintenance of the landscape elements
post-construction.
j. Drainage and I'umping: 1'repare dra�vings and specificatious for a trench drain and
pumping system for the existing t���in box culvert.
Initials R.1f AD Ducuments Agrecments U I hibuque,Citp ot(IA).TSA I3BC ktsih o�dCul�erts 201TT0 2018'I l sd 059 I R-01 ducr
Strand Associates, Inc®
City of Dubuque
Task Order No. 18-01
Page 3
August 22, 2018
Compensation
OWNER shall compensate ENGINEER for Services under this Task Order on an hourly rate basis plus
expenses an estimated fee of $560,000.
Schedule
Services will begin upon execution of this Task Order, which is anticipated on June 25, 2018. Services
are scheduled for completion in accordance with the following milestones.
Milestone
Date
Final Drawings and Specifications Completion August 1, 2018
Bid Opening (Completion of Services)
November 1, 2018
TASK ORDER AUTHORIZATION AND ACCEPTANCE:
ENGINEER:
STRAND ASSOCIATES, INC.®
OWNER:
City of Dubuque
f f�61_
Matthew S. Richards Date Michael C. Van Milligan Date
City Manager
Corporate Secretary