Kerper Boulevard Storm Sewer Improvements Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Kerper Boulevard Storm Sewer Project DATE: January 26, 2010 Dubuque AI4i dacb hli ll? 2007 City Engineer Gus Psihoyos is recommending acceptance of the public improvements for the Kerper Boulevard Storm Sewer Project, as completed by McDermott Excavating Co., in the final contract amount of $75,489.53, which is a 31.0% increase from the original contract amount of $57,611.20. The cost increase was due to the use of additional bedding material and pavement required to satisfactorily complete the project. concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Michael C. Van Milligen Masterpiece on the Mississippi Dubuque baking All4merdcaCgr 1 11 1 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: January 26, 2010 SUBJECT: Kerper Boulevard Storm Sewer Project CIP 7201806 INTRODUCTION The purpose of this memo is to recommend acceptance of the public improvements and authorize payment to the contractor for the Kerper Boulevard Storm Sewer Project. BACKGROUND The Kerper Boulevard Storm Sewer Project included the extension of approximately 650 lineal feet of 15" reinforced concrete pipe (RCP) and the construction of three intakes to help alleviate ponding during heavy rain events in the Kerper Boulevard corridor. The project provided Bradley Iron Works and Hawkeye Boat Sales access to the public storm sewer so that they can resolve their respective private drainage issues. DISCUSSION The Kerper Boulevard Storm Sewer Project was completed by McDermott Excavating Co. of Dubuque, Iowa, in the final contract amount of $75,489.53, which is a 31.0% increase from the original contract amount of $57,611.20. The cost increase was due to the use of additional bedding material based on soil conditions and the additional pavement required to satisfactorily complete the project. RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the contract amount of $75,489.53 to McDermott Excavating Co. of Dubuque, Iowa, for the Kerper Boulevard Storm Sewer Project. BUDGET IMPACT The total cost for the Kerper Boulevard Storm Sewer Project is as follows: Award Final Construction Contract $57,611.20 $75,489.53 Contingency 5,761.12 0 Engineering & Inspection 9,505.85 7,565.71 Total Project Cost $72,878.17 $83,055.24 The funding summary for the project is as follows: CIP No. Fund Description 7201806 Kerper Storm Sewer Extension 7201008 Storm Sewer Improvements /Extensions Total Project Funding ACTION TO BE TAKEN Fund Amount $76,500.00 6,555.24 $83,055.24 I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $75,489.53 to McDermott Excavating Co. for the Kerper Boulevard Storm Sewer Project. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director Ton Freund, Engineering Technician RESOLUTION NO. 19-10 ACCEPTING THE KERPER BOULEVARD STORM SEWER PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Kerper Boulevard Storm Sewer Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Kerper Boulevard Storm Sewer Extension and Storm Sewer Improvements /Extensions appropriations for the contract amount of $75,489.53 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 1st day of February , 2010 eanne F. Schneider, CMC, City Clerk oy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE KERPER BOULEVARD STORM SEWER PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Kerper Boulevard Storm Sewer Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $83,055.24. Dated this day of , 2010. Filed in the office of the City Clerk on the:;?, day o City Engineer 2010 nne F. Schneider, CMC, City Clerk Project Name: CIP Number: Project Contract Amount: Project Completion Date: KERPER BLVD. STORM SEWER PROJECT CIP: 7201806 $57,611.20 19 Jun Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: McDermott Excavating 14407 Route 20 Dubuque, Iowa 52003 563 583 - 4633 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 15" RCP 622.32 LF $ 27.53 287.00 $ 7,901 11 46.12% 53.33% 100.00% 100.00% 88 06% 100 00% 100 00% 100.00% 283.50% 0.00% 127.41% 81.52% 100.00% 78.33% 154.82% 100 00% 1 2 15" HDPE N -12 30 LF $ 26.00 1600 $ 416.00 3 Tap Existing Storm Sewer 1 LS $ 1,10000 1.00 $ 1,100.00 4 48" Diameter Manhole Base 2 EA $ 450 00 2.00 $ 900.00 5 48" Diameter Sidewall 17.51 LF $ 108.00 15.42 $ 1,665.36 6 Manhole Frame and Cover 2 EA $ 425.00 2 00 $ 850.00 7 Intake 101 -B (Includes Insualation between watermain) 2 EA $ 1,600.00 2.00 $ 3,200.00 8 Intake 101 -C 1 EA $ 2,178 00 1.00 $ 2,178.00 9 Bedding Stone, 1" Clean 155 Tons $ 13 25 439.43 $ 5,822.45 10 Backfill, Limestone / Sand 1450 Tons $ 1.06 0.00 $ - 11 Graded Stone Base 245 Tons $ 12.50 312.15 $ 3,901 88 12 HMA Surface Course 145 Tons $ 87 38 118.21 $ 10,329.19 13 6" PCC Driveway, Including Removal 90 SY $ 56.42 90.00 $ 5,077.80 14 PCC Curb And Gutter, Including Removal 80 LF $ 15 86 62.66 $ 993.79 15 Landscape Restoration 166 SY $ 2.45 257.00 $ 629 65 16 Traffic Control And Protect Safety 1 LS $ 3,503.00 1.00 $ 3,503 00 CHANGE ORDER 1 Alternate "A" 15" HDPE (341.5 x $23.03 = ($7864.75) Hit and Repaired unmarked sanitary lateral Extra for 60" MH and Labor to raise pipe to avoid sanitary lateral. See Invoice dated 6 -23 -2009 in 8" PCC Pavement instead of 6" PCC Pavement (216.48 x $66.09 = $14,307.16) Difference in cost from 6" to 8" Pavement i $9.67 / Sq Yd x 90 = $870 30 1.00 $ 7,684.50 2 1 00 $ 674 35 3 1.00 $ 3,485.00 4 1.00 $ 14,307.16 5 1.00 $ 870 30 Payment Totals $ 75,489.53 Michael Van Milligen Dubuque, Iowa Gus Psihoyos, City Engineer Dubuque, Iowa Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: / \ APPROVED: PROJECT CLOSE OUT FORM Total Contract Work Performed to Date $ 48,468.22 Total Change Order Work Performed to Date: $ 27,021.31 Total Contract and Change Order Work Performed to Date: $ 75,489.53 Miscellaneous Costs Engineering TOTAL FINAL PROJECT COSTS: $ 83,055.24 The Undersigned, IK Aer>lwct/ contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. BY: i $ 7,565.71