Loading...
Water & Resource Recovery Center FY2020 Budget PresentationCopyrighted February 27, 2019 City of Dubuque Public Hearings # 2. ITEM TITLE: Water & Resource Recovery Center FY2020 Budget Presentation SUMMARY: SUGGESTED DISPOSITION: ATTACHMENTS: Description W&RRC FY2020 Budget Outline Type Supporting Documentation Water & Resource Recovery Center This page intentionally left blank. -38- WATER & RESOURCE RECOVERY CENTER DEPARTMENT Budget Highlights Expenses Employee Expense Supplies and Services Payment to Construction Fund Machinery and Equipment Engineering - Sewer Administration Public Works Sewer Maintenance Charges Administrative Overhead Recharge Payment in Lieu of Taxes Debt Service Total Expenses Resources Operating Revenue Total Resources Net Operating Surplus (Deficit) Personnel - Authorized FTE Sanitary User Fee Rate Increase Revenue 1% Rate Increase Generates FY 2018 Actual 1,533,344 2,627,010 181,114 10,477 190,435 730,507 1,407,393 142,884 6,131,146 FY 2019 FY 2020 % Change From Budget Requested FY 2019 Budget 1,476,394 2,870,704 845,000 29,570 234,473 830,141 1,376,688 142,884 5,275,393 1,448,236 2,963,561 458,758 128,275 280,899 758,438 1,444,114 142,884 5,229,832 (1.9)% 3.2 % (45.7)% 333.8 % 19.8 % (8.6)% 4.9 % (0.9)% 12,954,310 13,796,771 13, 081, 247 12, 854, 997 13, 090, 204 12, 905, 459 (1.7)% (1.4)% 13,796,771 842,461 17.00 3.00% 13, 090, 204 8,957 12, 905, 459 50,462 15.00 15.00 3.00% 4.50% $ 96,813 (1 .4)% 41,505 Improvement Package Summary 1 of 4 This improvement package would provide funding for a carbon fiber repair kit that would provide materials and training to expedite a spot repair to the 42" pre -stressed concrete cylinder pipe (PCCP) which conveys wastewater from the Terminal Street Valve House to the Water & Resource Recovery Center. This improvement would allow City staff to expeditiously restore service in the event of a failure of the 42" PCCP, minimizing the effects of an extended sanitary bypass. This improvement supports the City Goals of Financially Responsible, High -Performance City Organization: Sustainable, Equitable, and Effective Service Delivery, and Sustainable Environment: Preserving and Enhancing Natural Resources. Related Cost: Sanitary User Fee Impact Activity: Plant Operations $15,668 Sanitary User Fee Non -Recurring Recommend - Yes 0.16% 2 of 4 This improvement package would provide funding for an exhaust wall to evacuate painting/chemical fumes from the maintenance work space. This improvement allows for additional painting/finishing of components in-house. This improvement also provides a safer working environment for maintenance staff. Filtration of paint/fumes produces cleaner exhaust. This improvement supports the goals of Vibrant Community: Healthy and Safe, and Sustainable Environment: Preserving and Enhancing Natural Resources. Related Cost: Sanitary User Fee Impact Activity: Plant Operations $3,500 Sanitary User Fee Non -Recurring Recommend - Yes 0.04% -39- 3 of 4 This improvement package would provide funding for a spare pump for the W&RRC Disinfected Effluent Water (DEW) system. This improvement would facilitate faster replacement of one of the systems three identical pumps. Many processes at W&RRC depend on an adequate supply of DEWfor heating, cooling, and washing. Utilization of DEW reduces the consumption of potable city water. This improvement supports the City Goals of Financially Responsible, High -Performance City Organization: Sustainable, Equitable and Effective Service Delivery, and Sustainable Environment: Preserving and Enhancing Natural Resources. Related Cost: $6,950 Sanitary User Fee Non -Recurring Recommend - Yes Sanitary User Fee Impact 0.07% Activity: Plant Operations 4 of 4 This improvement package would provide funding for a spare pump and a pump rebuild kit for the Lake Eleanor Road Lift Station. The additional pump and rebuild kit would expedite replacement of one of the two existing pumps, allow sufficient time for rebuild of a pump removed from service, and provides a layer of protection in the case of a pump failure. The additional pump greatly reduces the likelihood of a sanitary sewer overflow associated with pump failure. This Improvement supports the City Goal of Financially Responsible, High -Performance City Organization: Sustainable, Equitable, and Effective Service Delivery. Related Cost: $9,800 Sanitary User Fee Non -Recurring Recommend - Yes Sanitary User Fee Impact 0.10% Activity: Plant Operations Significant Line Items Employee Expense 1. FY 2020 employee expense reflects a 1.5% wage package increase. 2. The Iowa Public Employee Retirement System (IPERS) City contribution of 9.44% is unchanged from FY 2019 The employee contribution of 6.29% is unchanged from FY 2019. 3. The City portion of health insurance expense is decreased from $1,193 in FY 2019 to $921 in FY 2020 per month per contract which results in an annual cost savings of $52,111 or 22.77%. 4. Overtime is unchanged from $59,350 in FY 2019 to $59,350 in FY 2020. FY 2018 actual was $52,395. 5. Sick leave payout is decreased from $14,720 in FY 2019 to $11,225 in FY 2020. 6. The FY 2019 budget recommendation included elimination of a Plant Operator Position effective January 1, 2019. This results in a savings of $38,716 in FY 2020 (-0.50 FTE or 1,040 hours annually). Supplies & Services 7. Property Insurance decreased from $84,857 in FY 2019 to $79,951 in FY 2020 based on FY 2018 actual plus 8%. -40- 8. Sales Tax increased from $307,767 in FY 2019 to $324,762 in FY 2020 based on increased sanitary sewer rates in FY 2020. This expense is directly offset by sales tax revenue. 9. Electricity Utility Expense unchanged from $424,777 in FY 2019 to $424,777 in FY 2020 based on FY 2019 budget. Electrical expense for the W&RRC plant in FY 2020 is $227,486, which includes increased microturbine output and $79,766 for the estimated BioResoure Development electrical usage which will be reimbursed on a monthly basis. The lift station electrical expense in FY 2020 is estimated to be $197,291. FY 2018 actual was $384,033. 10. Gas Utility Expense increased from $65,204 in FY 2019 to $87,710 in FY 2020 based on FY 2018 actual. 11. Property Maintenance decreased from $91,050 in FY 2019 to $66,350 in FY 2020 based on FY 2018 actual of $69,433. 12. Machinery and Equipment Maintenance increased from $186,277 in FY 2019 to $309,625 in FY 2020. FY 2018 actual was $195,639. The increase is due to increasing digester cleaning (+$20,000) due to quotes coming in higher, increasing pump, grinder, and mixer maintenance (+$16,000) due to more frequent repair of equipment due to heavy wear from grit and struvite, increasing siloxane media replacement (+$35,720) and increasing hydrogen sulfide media replacement (+$36,060) due to more frequent replacement due to BioResource Development, adding monthly jetting digester heat exchange maintenance (+$3,000) which was previously budgeted in the Property Maintenance line item, and adding HVAC maintenance (+$10,000) due to the age of HVAC units and more frequent repairs. This line item represents samplers and lab equipment maintenance ($2,817), digester cleaning ($60,000), pump, grinder and mixer maintenance ($36,000), primary and final clarifier maintenance ($10,000), boiler treatment ($6,900), siloxane media replacement ($35,720), hydrogen sulfide media replacement ($111,060), ultraviolet lamp replacement ($25,500), water based parts washer maintenance ($3,328), citric acid ($1,000), backflow testing ($2,500), monthly jetting digester heat exchanger maintenance ($3,000), and HVAC maintenance ($10,000) 13. Major Repair Element is unchanged from $75,000 in FY 2019 to $75,000 in FY 2020. 14. Equipment Maintenance Contract Expense increased from $76,634 in FY 2019 to $77,293 in FY 2020 based on FY 2019 plus 1%. FY 2018 actual was $78,527. 15. Lift Station Maintenance decreased from $163,200 in FY 2019 to $138,155 in FY 2020 based on a three year average. FY 2018 actual was $113,091. 16. Polymer Expense decreased from $245,985 in FY 2019 to $226,100 in FY 2020 based on bid results in FY 2019. FY 2018 actual was $227,424. 17. Liquid Oxygen increased from $426,734 in FY 2019 to $427,536 in FY 2020. The FY 2020 budget includes $27,536 for tank rental and $400,000 for oxygen based on the expected loading. FY 2018 actual was $434,495. 18. Environmental Testing/Monitoring Expense decreased from $59,663 in FY 2019 to $25,000 in FY 2020 based on FY 2018 actual of $24,967. 19. Hauling Service decreased from $276,722 in FY 2019 to $274,300 in FY 2020 based on FY 2018 actual $265,376 plus 3%. -41- Total Equipment $ 128,275 Machinery & Equipment 20. Equipment replacement items include ($128,275): Administration Smart Phone $ 346 Plant Operations Heavy Duty Pickup Truck $ 36,000 Compact Pickup Truck $ 14,500 Forklift $ 27,500 Steam Pressure Washer $ 5,000 Shop Equipment $ 14,519 Cell Phones $ 60 Environmental Monitoring Laboratory Equipment $ 11,900 Recommended Improvement Packages $ 18,450 Debt Service 21. Annual debt service payments for FY 2020 are as follows ($5,229,832): Final Call Amount Debt Series Source Purpose Payment Date $ 62,400 G.O. 2017A Sanitary Fees Sanitary Sewer Improvements 2030 2025 $ 95,273 G.O. 2011A Sanitary Fees Sanitary Sewer Improvements 2031 2018 $ 43,507 G.O. 2012E Sanitary Fees Sanitary Forcemain Repairs 2032 2018 $ 110,944 G.O. 2012D Sanitary Fees Sanitary Sewer Improvements 2033 2019 $ 445,075 G.O. 20148 Sanitary Fees Sanitary Sewer Improvements 2034 2021 $ 165,406 G.O. 2016C Sanitary Fees Sanitary Sewer Improvements 2035 2024 $ 62,622 SRF 2006 Sanitary Fees Northfork Catfish Creek 2031 $ 218,550 SRF 2009 Sanitary Fees Meter Change -Out 2031 $ 3,696,980 SRF 2010 Sanitary Fees W&RRC Plant Upgrade 2039 $ 186,141 SRF 2013 Sanitary Fees W&RRC Cogeneration 2033 $ 118,061 SRF 2018 Sanitary Fees Kerper Boulevard Sanitary 2038 $ 24,873 Planned Sanitary Fees Outfall Manhole Sanitary 2039 $ 5,229,832 Total Sanitary Annual Debt Service Revenue 22. Sewage Fees decreased from $10,366,756 in FY 2019 to $10,116,942 in FY 2020 based on a 4.50% rate increase in FY 2020 and a 7% decrease in consumption in FY 2019. 23. Sewage dumping fees increased from $124,964 in FY 2019 to $130,148 in FY 2020 based on FY 2018 actual of $130,148. -42- 24. Late Payment Penalties increased from $97,800 in FY 2019 to $126,353 in FY 2020 based on FY 2018 actual of $306,353 less one-time payments. 25. The VVater and Resource Recovery Center's pre-treatment largest industrial customers projected changes in revenues as follows: • Prairie Farms decreased from $472,345 in FY 2019 to $424,132 in FY 2020 based on FY 2018 actual of $405,868 plus 4.50%; • Inland Protein increased from $170,017 in FY 2019 to $191,967 in FY 2020 based on FY 2018 actual of $183,701 plus 4.50%; and • Rousselot is decreased from $900,000 in FY 2019 to $882,331 in FY 2020 based on FY 2018 actual actual of $844,336 plus 4.50%. 26. High Strength Waste revenue decreased from $190,000 in FY 2019 to $189,644 in FY 2020 based on FY 2018 actual of $189,644. This revenue represents other entities paying the City to take high strength waste which will be used in the anaerobic digesters to generate additional energy using the micro -turbines. 27. Gas Revenue increased from $214,354 in FY 2019 to $221,609 in FY 2020. This line item represents 5% of the gross revenue for BioResource Development ($63,843), lease of the site ($10,000), staff time reimbursement ($56,000), reimbursement of gas ($12,000) and electric cost ($79,766). 28. Fats, Oils and Grease Permit and Dumping fees decreased from $30,000 in FY 2019 to $24,614 in FY 2020 based on FY 2018 actual of $24,614. -43- This page intentionally left blank. -44- WATER & RESOURCE RECOVERY CENTER The Water & Resource Recovery Center uses technology to clean the water used by the community to allow its safe return to the environment. The process provides the opportunity to extract resources from the water for use within the Center and the surrounding community. Water & Resource Recovery Center Administration Operations and Evnironmental Maintenance Monitoring SUCCESS IS ABOUT PLANNING, PARTNERSHIPS AND PEOPLE LEADING TO OUTCOMES PEOPLE W&RRC Staff, Health Department, Engineering and Public Works provided the majority of our City relationships. We also maintain relationships with local industries, the Resilient Community Advisory Commission and Regional/Local Engineers. PLANNING The W&RRC has ongoing planning and implementation for several environmental issues including spill prevention plans, Bio -Solids Management and Nutrient Reduction. PARTNERSHIPS The W&RRC maintains partnerships with City Departments, Iowa Department of Natural Resources, USEPA, Local Industries and local/regionaUservice providers. -45- /\ li$13,796,771 WATER & RESOURCE RECOVERY CENTER $13,000,000 $12,000,000 $11,000,000 $10,000,000 FY 2018 FY 2019 FY 2020 Full -Time Equivalent 17.00 15.00 15.00 Resources $13,Q9Q,204 Operating Revenue $12,905,459 RI FY 2018 ■ FY 2019 FY 2020 The Water Resource Recovery Center is supported by 15.00 full-time equivalent employees, which accounts for 28.97% of the department expense as seen below. Overall, the department's expenses are expected to decrease by -2% in FY 2020 compared to FY 2019. Expenditures and Debt by Fiscal Year EmploYee Ekpense StIpplies and SerViceS Construction Find E9vipment Engineering �H P" is Works aH Admin pverheatl $1,533,344 $1,476,394 $1,448,236 • $181,114 $845,000 $458,758 $10,477 1 $29,570 $128,275 $190,435 N $234,473 NM $280,899 $730,507 $830,141 $758,438 $1,407,393 $1,376,688 $1,444,114 $2,627,010 ■ $2,870,704 $2,963,561 Debt Service $6,131,146 $5,275,393 $5,229,832 $0 $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 FY 2018 7 FY 2019 FY 2020 -46- WATER & RESOURCE RECOVERY CENTER Operations and Maintenance Overview Operations and maintenance of the W&RRC consists of maintaining equipment and records necessary to collect, pump, treat and dispose of the liquid wastes discharged into the sanitary sewer system as required by state and federal regulatory agencies at the lowest possible cost while sustaining appropriate maintenance programs for plant reliability; operating and maintaining 20 pumping stations located throughout the City of Dubuque; Repair and maintain all equipment required for the successful and efficient operation of the W&RRC. Stock essential spare parts and maintain records for effective operation of the W&RRC. 00 00 Center Operations For FY18 the Water & Resource Recovery Center (W&RRC) treated an average 7.02 million gallons per day (M.G.D.) or 2,562 million gallons for the year. 7.02 million gallons is equal to about 1400 semi -tanker loads of sewer water per day. The average BOD or Biochemical Oxygen Demand was 24,500 pounds of Oxygen per day of which 23,900 pounds was removed or about 97.6 percent removal. 30000 25000 20000 15000 fnnn Pounds of Oxygen Demand 1 1In II Out That means that each day we kept 23,900 pounds of Oxygen from being removed from the waters of the Mississippi River. -47- WATER & RESOURCE RECOVERY CENTER 12.5 tons of soil amendment (fertilizer) are produced PER DAY during the process of cleaning the wastewater. That is an average of eight semi loads per week of useful material being safely returned to a beneficial purpose. Operations and Maintenance Funding Summary FY 2018Actual FY 2019 Budget FY 2020 Requested Expenditures $9,827,182 $9,144,151 $9,289,084 Resources $13,454,137 $12,928,424 $12,738,062 Operations and Maintenance Position Summary FY 2020 WRRC MANAGER 1.00 MAINTENANCE SUPERVISOR WW1 1.00 W&RRC OPERATIONS SUPERVISOR 1.00 EQUIPMENT MECHANIC - W WT 2.00 INDUSTRIALELECTRONICS TECH 1.00 WRRC OPERATOR CERT GR II 2.00 PLANT OPERATOR GRADE III &IV 200 CONFIDENTIALACCOUNT CLERK 1.00 Total FT Equivalent Employees 11.00 -48- WATER & RESOURCE RECOVERY CENTER Performance Measures Operations and Maintenance -Activity Statement Maintain efficient operations and maintenance of the W&RRC to assure for treatment of the City of Dubuque's waste water in the most cost effective manner possible while protecting the environment and citizens from exposure to pollution in the Mississippi River. Goal: Sustainable Environment -1(14 Outcome #1: Maintain proper operation and maintenance of pumping stations throughout the City of Dubuque to ensure that untreated wastewater is not discharged to streets, storm sewers or creeks/rivers where citizens may come in contact with this potentially dangerous material. All pumping stations are connected with the W&RRC computer system to allow for real-time monitoring of the operations of the stations. Stations are visited by the W&RRC Maintenance staff at least weekly to check for proper operations. Three of the major stations are checked daily during the work week. Three of the pumping stations have permanently installed standby power generators and the others can be powered by the three portable generators owned by the W&RRC. This capability along with the standby generators at the W&RRC assures the businesses and citizens of the City of Dubuque that even during power outages the W&RRC will continue to operate and provide essential services to our citizens. All operations staff to have at least Grade II Certification Training is provided to employees of the W&RRC to equip all employees with the required skills to successfully operate a complex technical facility, to maintain and upgrade certifications required by IDNR and keep abreast of current regulations and technologies. A higher level of training for all operators will lead to a more efficient operation of the W&RRC. 1/4,47Goal: Robust Local Economy Outcome #2: Increased Energy Production for use at the W&RRC Increased addition of HSW to the digesters provides for additional revenue for the W&RRC and over time will allow the W&RRC to produce most of the energy needed to operate the Center. The W&RRC produces 75% to 85% of the electrical needs for the Center. • Increased Gas Production via the Introduction of HSW • Matching Center KW Demands with HSW Introduction • Alliant agreement to allow increase KW production -49- WATER & RESOURCE RECOVERY CENTER 700 600 500 400 300 200 100 0 Electrical Demand KW 1 2 3 Blue = Total Demand Green = W&RRC Production Red = Purchased -50- WATER & RESOURCE RECOVERY CENTER Environmental Monitoring Overview The Environmental Monitoring Section performs the chemical, biological and bacterial sampling and analysis associated with the operations of the W&RRC and assists in the operations of additional City Departments and the community by providing analytical services. The function of the Industrial Pretreatment Program is to eliminate from industrial sources those materials which may cause pass through and/or interference with the operation of the City of Dubuque's Publicly Owned Treatment Works. Working in conjunction with many City of Dubuque Departments to operate and maintain the Fats, Oils and Grease program. The program is aimed at eliminating Sanitary Sewer Overflows caused by the discharge of excessive amount of fats, oils and greases into the sanitary sewer system. Environmental Monitoring Funding Summary FY 2018 Actual FY 2019 Budget FY 2020 Requested Expenditures $454,902 $492,422 $462,900 Resources $338,259 $151,819 $158,258 Environmental Monitoring Position Summary FY 2020 Lab Supervisor 1.00 Lab Technician 2.00 Environmental Coordinator 1.00 Total FT Equivalent Employees 4.00 Highlights of the Past Year The Environmental Monitoring Activity created the position of Laboratory Supervisor from one of the existing Laboratory Technician positions. This new position provides a staffing structure that improves the efficiency and effectiveness of laboratory activities. Future Initiatives The Laboratory is currently pursuing state certification in the analysis of the nutrients phosphorus and nitrogen. Performance Measures Environmental Monitoring - Activity Statement Monitor the quality of water discharged from the Water & Resource Recovery Center to assure environmental stewardship and adherence to State and Federal regulations and the environmental goals of the Citizens of Dubuque. -51- WATER & RESOURCE RECOVERY CENTER Outcome #1: Maintain a Fats, Oil and Grease program to protect the sanitary sewer system from blockages caused by excessive buildup in the system helping eliminate sanitary sewer overflows caused by Fats, Oils and Grease. Outcome #2: Ensure a safe water supply - In support of the Water Department Collect and analyze 16 water samples per week from various locations within the City of Dubuque. The assurance of safe drinking water is essential for the health and safety of the community. -52- Recommended Operating Revenue Budget - Department Total 43 - WATER & RESOURCE RECOVERY Fund Account Account Title FY17 Actual Revenue FY18 Actual Revenue FY19 Adopted Budget FY20 Recomm'd Budget 610 42230 SEWAGE DISPOSAL PERMITS 610 42237 FOG PERMITS 610 42331 FOG INSPECTION fEES 1,150 37,325 50 1,485 38,850 250 1,150 37,325 50 1,485 38,850 250 42 - LICENSES AND PERMITS 38,525 40,585 38,525 40,585 610 43110 INVESTMENT EARNINGS 32,547 44,481 12,810 51,786 43 - USE OF MONEY AND PROPERTY 32,547 44,481 12,810 51,786 610 51,185 WATER TESTS -OUTSIDE 610 51,205 SEWAGE FEES 610 51,215 LATE PAYMENT PENALTY 610 51,216 FOG PENALTIES 610 51,218 ARTCO FLEETING 610 51,220 SWISS VALLEY FARMS 610 51,225 INLAND PROTEIN 610 51,227 HIGH STRENGTH WASTE 610 51,230 SEWAGE DUMPING FEES 610 51,231 FOG DUMPING FEES 610 51,235 WW IND. PRETREATMENT 610 51,240 SAN ROUESSLOT 610 51,256 BRD LEASE 610 51,257 BRD STAFF REIMBURSEMENT 610 51,258 BRD GAS REIMBURSEMENT 610 51,259 BRD ELECTRIC REIMB 610 51,260 BRD GROSS REVENUE 610 51261 BRD ELECTRIC USE PROFIT 610 51,690 LANDFILL PAYMENT -LAB TEST 610 51,964 ARENANOVELT 47,728 9,929,090 97,800 1,800 0 472,345 170,017 274,326 124,964 28,006 36,341 853,196 0 0 0 0 25,500 0 6,773 250 40,293 10,106,780 306,353 2,750 1,318 405,868 183,701 189,644 130,148 24,614 35,990 844,336 0 0 0 0 0 0 1,177 415 47,728 10,366,756 97,800 1,800 0 472,345 170,017 190,000 124,964 30,000 36,341 900,000 0 0 0 0 214,354 0 0 250 40,293 10,116,942 126,353 2,750 1,318 424,132 191,967 189,644 130,148 24,614 35,990 882,331 10,000 56,000 12,000 79,766 63,843 25,000 1,177 415 51- CHARGES FOR SERVICES 12,068,136 12,273,386 12, 652,355 12,414,683 610 53201 REFUNDS 610 53204 IOWA FUEL TAX REFUND 610 53520 WATER SAMPLING -PLANT 610 53521 WWT SAMPLING -AIRPORT 610 53523 WWT SAMPLING -OUTSIDE 610 53610 INSURANCE CLAIMS 610 53620 REIMBURSEMENTS -GENERAL 610 53630 SALES TAX COLLECTION 0 2,044 613 41,318 24,366 34,289 79 290,086 50 0 695 37,344 24,870 0 1,375 324,422 0 2,044 613 41,318 24,366 0 79 307,767 50 0 695 37,344 24,870 0 1,375 324,762 53 - MISCELLANEOUS 392,796 388,756 376,187 389,096 610 610 610 54109 54210 54220 SALVAGE SALES GO BOND PROCEEDS BOND DISCOUNT 366 652,158 21,006 170 1,030,001 15,018 366 0 0 170 0 0 54 - OTHER FINANCING SOURCES 673,531 1,045,189 366 170 610 59710 FR SANITARY SEWER CONST 20,000 0 0 0 59 - TRANSFER IN AND INTERNAL 20,000 0 0 0 43 - WATER & RESOURCE RECOVERY TOTAL 13,225,535 13, 792,396 13, 080, 243 12,896,320 -53- Recommended Operating Expenditure Budget - Department Total 43 - WATER & RESOURCE RECOVERY Fund Account Account Title FY17 Actual Expense FY18 Actual Expense FY19 Adopted Budget FY 20 Recomm'd Budget 610 61,010 FULL-TIME EMPLOYEES 640 61,010 FULL-TIME EMPLOYEES 610 61,020 PART-TIME EMPLOYEES 610 61,030 SEASONAL EMPLOYEES 100 61,050 OVERTIME PAY 610 61,050 OVERTIME PAY 640 61,050 OVERTIME PAY 610 61,071 HOLIDAY PAY -OVERTIME 640 61,071 HOLIDAY PAY -OVERTIME 610 61,091 SICK LEAVE PAYOFF 100 61,310 IPERS 610 61,310 IPERS 640 61,310 IPERS 100 61,320 SOCIAL SECURITY 610 61,320 SOCIAL SECURITY 640 61,320 SOCIAL SECURITY 100 61,410 HEALTH INSURANCE 610 61,410 HEALTH INSURANCE 640 61,410 HEALTH INSURANCE 610 61,415 WORKMENS' COMPENSATION 100 61,416 LIFE INSURANCE 610 61,416 LIFE INSURANCE 640 61,416 LIFE INSURANCE 610 61,640 SAFETY EQUIPMENT 610 61,660 EMPLOYEE PHYSICALS 965,479 0 0 22,612 0 55,670 0 23,739 0 24,172 0 94,388 0 0 80,088 0 0 270,316 0 40,971 0 768 0 4,690 121 964,031 809 638 4,473 42 52,124 230 24,601 355 14,843 4 93,513 124 3 76,654 101 12 254,095 293 38,766 0 752 1 6,837 42 961,728 0 0 0 0 59,350 0 17,221 0 14,720 0 98,016 0 0 80,556 0 0 214,651 0 29,293 0 859 0 0 0 990,095 0 0 0 0 59,350 0 17,221 0 11,225 0 100,694 0 0 82,45 8 0 0 1 62,54 0 0 23,810 0 843 0 0 0 61- WAGES AND BENEFITS 1,583,015 1,533,344 1,476,394 1,448,236 610 62010 OFFICE SUPPLIES 610 62011 UNIFORM PURCHASES 610 62030 POSTAGE AND SHIPPING 610 62032 FLAGS 610 62061 DP EQUIP. MAINT CONTRACTS 610 62062 JANITORIAL SUPPLIES 610 62065 LAB SUPPLIES 610 62090 PRINTING & BINDING 610 62110 COPYING/REPRODUCTION 610 62130 LEGAL NOTICES & ADS 610 62140 PROMOTION 610 62170 SUBSCRIPTIONS -BOOKS -MAPS 610 62190 DUES & MEMBERSHIPS 610 62204 REFUNDS 610 62206 PROPERTY INSURANCE 610 62208 GENERAL LIABILITYINSURAN 610 62210 SALES TAX 610 62310 TRAVEL -CONFERENCES 610 62320 TRAVEL -CITY BUSINESS 610 62360 EDUCATION & TRAINING 610 62411 UTILITY EXP-ELECTRICI TY 610 62412 UTILITY EXP -GAS -54- 1,318 2,414 2,692 0 9,942 0 19,648 2,502 774 73 0 0 875 7,208 78,795 15,408 291,779 3,290 144 8,990 334,908 62,099 2,298 2,425 3,492 90 8,898 1,470 40,082 1,725 321 3,575 0 0 409 11,065 73,943 13,763 325,418 1,975 159 8,893 384,033 87,710 1,318 2,500 2,692 135 8,610 1,000 19,648 2,502 773 73 0 0 1,125 7,208 84,857 11,750 307,767 4,450 290 4,853 424,777 65,204 2,194 2,500 3,597 135 8,808 1,724 40,082 4,541 336 100 600 300 885 11,065 79,951 10,684 324,762 3,45 0 390 11,330 424,777 87,710 Recommended Operating Expenditure Budget - Department Total 43 - WATER & RESOURCE RECOVERY Fund Account Account Title FY17 Actual Expense FY18 Actual Expense FY19 Adopted Budget FY 20 Recomm'd Budget 610 62415 610 62416 610 62421 610 62424 610 62431 610 62435 610 62436 610 62438 610 62511 610 62513 610 62521 610 62528 610 62611 610 62612 610 62613 610 62614 610 62621 610 62622 610 62623 610 62625 610 62628 610 62629 610 62631 610 62633 610 62638 610 62639 610 62663 610 62666 610 62667 610 62676 610 62678 610 62681 610 62692 610 62696 610 62710 610 62712 610 62713 610 62716 610 62721 610 62726 610 62731 610 62732 610 62733 610 62736 610 62747 610 62763 610 62767 610 62780 UTILITY EXPENSE STORMWATR UTILITY EXP -WATER TELEPHONE RADIO/PAGER FEE PROPERTY MAINTENANCE ELEVATOR MAINTENANCE RENTAL OF SPACE FIRE SUPPRESSION FUEL, MOTOR VEHICLE FUEL, DIESEL MOTOR VEHICLE MAINT. MOTOR VEH. MAINT. OUTSOUR MACH/EQUIP MAINTENANCE MAJOR REPAIR ELEMENT METER MAINTENANCE EQUIP MAINT CONTRACT 02 PLANT MAINTENANCE BELT FILTER MAINTENANCE CETRIFUGE MAINTENANCE LIFT STATION MAINTENANCE INSTRUMENTATION MAINT INSTR MAINT CONTRACT LIME CHLORINE POLYMER LIQUID CO2/02 SOFTWARE LICENSE EXP CREDIT CARD CHARGE DATA SERVICES PIPE -SPECIAL FITTINGS EDUCATIONAL MATERIALS LUBRICATION PRODUCTS LANDFILL FEES OUTSIDE COLLECTOR EXPENSE CONTRACTOR SERVICES CONSULTING ENGINEERS LEGAL SERVICES CONSULTANT SERVICES FINANCIAL CONSULTANT AUDIT SERVICES MISCELLANEOUS SERVICES TEMP HELPCONTRACT SERV. CONTRACT CUSTODIAL CATERING SERVICES MACH/EQUIPMENT RENTAL PAYMENT TO IOWA DNR ENVIRON. TESTING/MON. HAULING SERVICES 5,991 47,805 6,838 2,026 86,412 2,736 480 0 7,781 2,436 9,497 1,127 154,385 0 9,057 74,879 0 76,333 36,729 148,495 3,072 6,720 906 9,630 245,985 548,121 6,354 0 86 0 0 5,043 18,752 8,291 0 0 5,692 9,773 1,177 2,200 3,421 0 29,851 0 1,500 6,470 59,663 276,722 11,606 39,101 7,184 2,758 69,433 2,845 480 0 10,285 389 7,260 100 195,639 0 5,500 78,527 100 0 33,924 113,091 0 3,798 0 13,892 227,424 434,495 14,546 0 395 0 120 4,577 10,281 6,962 0 19,088 7,242 8,727 7,043 2,200 10,152 0 12,838 82 0 2,839 24,967 265,376 6,395 51,209 6,857 2,067 91,050 2,178 480 0 7,937 2,436 7,454 1,150 186,277 75,000 9,057 76,634 0 0 36,729 163,200 3,072 17,500 906 9,630 245,985 426,734 6,353 0 444 0 0 5,043 31,700 8,291 8,000 0 5,692 60,000 1,177 2,750 0 0 17,700 0 0 5,700 59,663 276,722 13,181 42,034 7,173 2,869 66,350 2,845 480 5,770 10,285 389 7,405 1,742 309,625 75,000 0 77,293 0 0 34,942 138,155 13,000 22,500 960 11,000 226,100 427,536 9,541 600 480 12,253 0 4,577 51,531 6,961 0 0 5,752 12,500 1,177 2,200 0 20,000 17,700 300 0 2,134 25,000 274,300 -55- Recommended Operating Expenditure Budget - Department Total 43 - WATER & RESOURCE RECOVERY Fund Account Account Title FY17 Actual Expense FY18 Actual Expense FY19 Adopted Budget FY 20 Recomm'd Budget 62 - SUPPLIES AND SERVICES 2,765,294 2,627,010 2,870,704 2,963,561 610 71120 PERIPHERALS, COMPUTER 610 71314 TRUCK -REPLACEMENT 610 71318 HEAVY EQUIP -REPLACEMENT 610 71410 SHOP EQUIPMENT 610 71413 LABORATORY EQUIPMENT 610 71421 HIGH PRESSURE SPRAY 610 71511 PUMPS 610 71520 HVAC 610 71610 CUSTODIAL EQUIPMENT 610 72418 TELEPHONE RELATED 610 72515 TEST EQUIPMENT, OTHER 156 0 0 7,953 1,066 0 0 0 242 46 0 801 0 0 133 7,296 0 0 0 0 291 1,956 0 0 0 10,000 19,100 0 0 0 0 470 0 0 50,500 27,500 14,519 11,900 5,000 14,950 3,500 0 406 0 71- EQUIPMENT 9,463 10,477 29,570 128,275 610 610 74111 74112 PRINCIPAL PAYMENT INTEREST PAYMENT 3,742,470 1,881,718 4,301,389 1,829,757 3,454,212 1,821,181 3,511,282 1,718,550 74 - DEBT SERVICE 5,624,188 6,131,146 5,275,393 5,229,832 610 91100 TO GENERAL 610 91710 TO SANITARY SEWER CONST 1,301,957 1,736,000 1,550,277 181,114 1,519,572 845,000 1,586,998 458,758 91- TRANSFER TO 3,037,957 1,731,391 2,364,572 2,045,756 43 - WATER & RESOURCE RECOVERY TOTAL 13,019, 916 12, 033,368 12, 016, 633 11,815,660 -56- FATS OILS GREASE 34,970 32,2 WATER MAIN REPLACEMENTS - 43755 Recommended Expenditure Budget Report by Activity & Funding Source 43 - WATER & RESOURCE RECOVERY • UNDISTRIBUTED FUNDING SOURCE: SEWAGE FACILITY OPERATION Account FY18 Actual Expense FY19 Adopted Budget FY20 Recomm'd Budget SUPPLIES AND SERVICES 17,920 15,488 17,920 TRANSFER TO 1,731,391 2,364,572 2,045,756 UNDISTRIBUTED 1,749,311 2,380,060 WPC ADMINISTRATION - 43100 FUNDING SOURCE: SEWAGE FACILITY OPERATION Account FY18 Actual Expense FY19 Adopted Budget FY20 Recomm'd Budget DEBT SERVICE 6,131,146 EQUIPMENT 291 SUPPLIES AND SERVICES 398,037 WAGES AND BENEFITS 139,845 5,275,393 341,880 141,586 5,229,832 346 381,272 148,217 Mr WRRP ADMINISTRATION 6,669,319 5,758,859 5,759,667 WPC PLANT OPERATIONS - 43400 FUNDING SOURCE: SEWAGE FACILITY OPERATION Account FY18 Actual Expense FY19 Adopted Budget FY20 Recomm'd Budget EQUIPMENT 133 10,470 116,029 SUPPLIES AND SERVICES 2,121,570 2,413,525 2,476,877 WAGES AND BENEFITS 1,001,189 929,014 903,060 Willi. WRR PLANT OPERATIONS 3,122,893 FATS OILS GREASE - 43500 FUNDING SOURCE: SEWAGE FACILITY OPERATION Account FY18 Actual Expense FY19 Adopted Budget FY20 Recomm'd Budget EQUIPMENT SUPPLIES AND SERVICES WAGES AND BENEFITS 1,956 7,148 25,866 6,856 25,427 8,791 24,660 FUNDING SOURCE: WATER UTILITY OPERATION Account FY18 Actual Expense FY19 Adopted Budget FY20 Recomm'd Budget WAGES AND BENEFITS 1,913 ENVIRON -MONITORING 1,913 ENVIRON -MONITORING - 43700 FUNDING SOURCE: SEWAGE FACILITY OPERATION Account FY18 Actual Expense FY19 Adopted Budget FY20 Recomm'd Budget -57- EQUIPMENT 8,097 19,100 11,900 SUPPLIES AND SERVICES 82,334 92,955 78,701 WAGES AND BENEFITS 364,470 380,367 372,299 r -r - ENVIRON -MONITORING ATER & RESOURCE RECOVERY TOTAL $ 12,033,367.74 $ 492,422 462,900 12,016,633.00 $ 11,815,660.00 -58- CITY OF DUBUQUE, IOWA DEPARTMENT DETAIL - PERSONNEL COMPLEMENT 43 WATER AND RESOURCE RECOVERY CENTER FD JC WP -GR JOB CLASS FY 2018 FY 2019 FY 2020 FTE BUDGET FTE BUDGET FTE BUDGET 61010 Full Time Employee Expense 610 5080 GE -40 WRRC MANAGER 1.00 $ 92,652 1.00 $ 99,913 1.00 $ 108,576 610 3300 GE -35 WRRC ASSIST. MANAGER 1.00 $ - 0.00 $ - 0.00 $ - 610 3030 GE -34 MAINTENANCE SUPERVISOR VWVT 1.00 $ 79,395 1.00 $ 80,590 1.00 $ 82,420 610 GE -33 W&RRC OPERATIONS SUPERVISOR 0.00 $ - 1.00 $ 66,218 1.00 $ 67,792 610 GE -33 LAB SUPERVISOR 1.00 $ 75,273 1.00 $ 76,418 1.00 $ 78,150 610 GE -31 ENVIRONMENTAL COORDINATOR 1.00 $ 59,966 1.00 $ 60,860 1.00 $ 65,706 610 2100 GE -31 LAB TECHNICIAN II 2.00 $ 119,167 2.00 $ 123,350 2.00 $ 121,973 610 GE -25 CONFIDENTIAL ACCOUNT CLERK 1.00 $ 47,651 1.00 $ 48,373 1.00 $ 49,535 610 2400 0E-14 EQUIPMENT MECHANIC - VWdT 2.00 $ 117,126 2.00 $ 119,494 2.00 $ 122,200 610 2800 OE -14 MAINTENANCE ELECTRICIAN 1.00 $ 57,983 1.00 $ 58,864 1.00 $ 62,125 610 0E-14 WRRC OPERATOR CERT GR IV 0.00 $ - 1.00 $ 55,910 1.00 $ 63,243 610 0E-13 WRRC OPERATOR CERT GR III 2.00 $ 113,035 1.00 $ 56,563 1.00 $ 59,102 610 2500 OE -12 WRRC OPERATOR CERT GR II 2.00 $ 113,879 2.00 $ 115,175 2.00 $ 109,273 610 2450 0E-11 WRRC OPERATOR (NC/GR I C) 2.00 $ 108,559 0.00 $ - 0.00 $ - TOTAL FULL TIME EMPLOYEES 17.00 $ 984,686 15.00 $ 961,728 15.00 $ 990,095 61030 SEASONAL EMPLOYEES 610 NA -38 INTERN 0.00 $ - 0.00 $ - 0.00 $ - TOTAL SEASONAL EMPLOYEES 0.00 $ - 0.00 $ - 0.00 $ TOTAL WATER & RESOURCE RECOVERY CENTER 17.00 $ 984,686 15.00 $ 961,728 15.00 $ 990,095 -59- CITY OF DUBUQUE, IOWA ACTIVITY PERSONNEL COMPLEMENT SUMMARY ACCT FD JC WP -GR POSITION CLASS FY 2018 FY 2019 FY 2020 FTE BUDGET FTE BUDGET FTE BUDGET Water & Resource Recovery Center Administration WASTEWATER PLANT 61043100 61010 610 3300 GE -40 MANAGER 1.00 $ 92,652 1.00 $ 99,913 1.00 $ 108,576 Total 1.00 $ 92,652 1.00 $ 99,913 1.00 $ 108,576 Water & Resource Recovery Center Plant Operation 61043100 61010 610 3300 GE -35 W&RRC ASSIST PLANT MGR 1.00 $ - 0.00 $ - 0.00 $ MAINTENANCE SUPERVISOR 61043400 61010 610 3030 GE -34 W&RRC 1.00 $ 79,395 1.00 $ 80,590 1.00 $ 82,420 61043400 61010 610 GE -33 MARC OPERATIONS SUPV 0.00 $ 1.00 $ 66,218 1.00 $ 67,792 EQUIPMENT MECHANIC - 61043400 61010 610 2400 OE -14 W&RRC 2.00 $ 117,126 2.00 $ 119,494 2.00 $ 122,200 ENVIRONMENTAL 61043400 61010 610 2228 GE -31 COORDINATOR 0.00 $ - 0.00 $ - 0.00 $ - 61043400 61010 610 1000 GE -25 CONFIDENTIALACCOUNTCERK 0.65 $ 30,973 0.65 $ 31,443 0.65 $ 32,198 61043400 61010 610 3942 OE -13 MARC OPERATOR GR III/IV 2.00 $ 113,035 2.00 $ 112,473 2.00 $ 122,345 61043400 61010 610 2500 OE -12 W&RRC OPERATOR GR II 2.00 $ 113,879 2.00 $ 115,175 2.00 $ 109,273 61043400 61010 610 2450 OE -11 W&RRC PLANT OP (NC/GR I C) 2.00 $ 108,559 0.00 $ - 0.00 $ - 61043400 61010 610 2800 OE -14 MAINTENANCE ELECTRICIAN 1.00 $ 57,983 1.00 $ 58,864 1.00 $ 62,125 Total 11.65 $ 620,950 9.65 $ 584,257 9.65 $ 598,353 Environmental Monitoring Lab -FT 61043700 61010 610 GE -33 LAB SUPERVISOR 61043700 61010 610 2100 GE -31 LAB TECHNICIAN II ENVIRONMENTAL 61043700 61010 610 2228 GE -31 COORDINATOR Total Fat Oils and Grease -FT 1.00 $ 75,273 1.00 $ 76,418 1.00 $ 78,150 2.00 $ 119,167 2.00 $ 123,350 2.00 $ 121,973 1.00 $ 59,966 1.00 $ 60,860 1.00 $ 65,706 4.00 $ 254,406 4.00 $ 260,628 4.00 $ 265,829 CONFIDENTIAL ACCOUNT 61043500 61010 610 1000 GE -25 CLERK 0.35 $ 16,678 0.35 $ 16,930 0.35 $ 17,337 Environmental Monitoring Lab -Seasonal 61043700 61030 610 650 NA -38 FINANCE INTERN -SEASONAL Total 0.35 $ 16,678 0.35 $ 16,930 0.35 $ 17,337 0.00 $ - 0.00 $ - 0.00 $ 0.00 $ - 0.00 $ - 0.00 $ TOTAL WATER & RESOURCE RECOVERY DEPARTMENT 17.00 $ 984,686 15.00 $ 961,728 15.00 $ 990,095 -60- Capital Iniproveinent Projects by Departinent/Division CIP Number Capital Improvement Project Title FY 17 Actual Expense FY 18 Actual Expense FY 19 Adopted Budget FY 20 Recomm'd Budget 71010710 UNDISTRIBUTED 7101339 SCADA SYSTEM UPGRADE 7101730 ALT 02 STUDY & IMPLEMENTA 7101731 DOG TRACK LIFT STATION 7101837 WRR PLANT RENOVATION 75,954 7102211 TERMINAL ST MAG METER REP 203,852 7102412 CEDAR LIFT PUMP/GEN/TRAIL 7102474 BRADLEY/PERRY FORCE MAIN 7102529 NUTRIENT REDUCT STRATEGY 212 7102530 OUTFALL MANHOLE 7102538 AIRPORT LS UPGRADES 7102598 CLARIFIER REALIGN/REPAIR 13,981 7102599 KERPER PUMP MOTOR/CONTROL 7102601 REPLACEMENT OF RADIOS 7102659 NUTRIENT RED/BASIN MOD 1 7102697 ASH POND ABANDONMENT 62,534 116,589 7102698 METHANE GAS SYSTEM WRRC 25,479 31,449 7102699 STRUVITE AIRPREX PILOT 29,518 7102700 LEVEL 4 AGREEMENT 10,099 19,569 7102701 HS WASTE RECEIVE & STORE 14,998 7102730 FRACK TANK 10,125 10,468 20,000 50,000 25,000 100,000 50,000 55,000 400,000 15,000 19,325 130,000 7102749 KW CAR WASH LIFT STATION 7102750 GRANGER CREEK LIFT STATIO 7102787 WRRC CAMERAS 27,500 12,000 45,900 WATER & RESOURCE RECOVERY TOTAL 280,900 -61- PRGRM /DEPT PROJECT DESCRIPTION FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 TOTAL PAGE WATER & RESOURCE RECOVERY CENTER Business Type Final Clarifier Drive Pier Realignment and Drive Repair Catfish Lift Station Spare Pump Lift Station SCADA Upgrades Camera System Upgrade High -Strength Waste Receiving & Storage Nitrogen Reduction UV Disinfection System Modifications Side -Stream Phosphorous Removal Total - Water & Resource Recovery Center $ 130,000 $ 130,000 $ 130,000 $ 130,000 $ $ 520,000 95 $ 55,000 $ — $ — $ — $ — $ 55,000 96 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 250,000 97 $ 45,900 $ — $ — $ — $ — $ 45,900 98 $ — $ — $ 522,155 $ 961,795 $ — $ 1,483,950 99 $ $ — $ 70,000 $ 98,000 $ 1,092,000 $ 1,260,000 100 $ — $ — $ — $ 10,000 $ 225,000 $ 235,000 1010 $ — $ — $ — $ — $ 300,000 $ 300,000 102 $ 280,900 $ 180,000 $ 772,155 $1,249,79 $ 1,667,000 $ 4,149, 850 -62- 5