Loading...
2 10 10 Water Department FY 2011 Budget PresentationBudget Presentation Administration Water Treatment Plant Distribution Meter *Every Child/Every Promise *Prescott School mentoring program *Water Conservation Educational Program *Sustainable/Smarter City Initiative Vacuum Filter Building Backup Power Supply Budget:$92,000.00 Expense:$87,604.40 Savings$ 4,395.60 West Clear Well Reservoir –Pipe Coating Program Budget:$235,145.57 Expense:$ 62,205.57 Savings$ 179,940.00 Water Storage Tank Inspection Program West Third Reservoir Fluoride Bulk and Day Tank Upgrade *Drinking Water Treatment Plant Optimization Study *ADA Improvements –Eagle Point Water Plant *Bunker Hill Pump Station Renovations *Water Storage Tank Inspection Program *Asbury Tank Painting *Pump Replacement Vacuum Filter Building *West Third Renovation Project *Well Maintenance Program *Chlorine Sampling Station Maintenance Program *Electrical Usage Integrated Sustainability Monitoring *Water Circulating System for Water Storage Tanks *North Siegert Farm (Paving and Utility –Phase 3) Installed approximately: 1623’ of 16” & 12” & 8” ductile iron water main Installed: six fire hydrants, and nine valves Highway 61/151 South * Installed approximately: 2340’ of 8” & 6” ductile iron water main Installed: five fire hydrants, and ten valves *Miller Road Installed approximately: 1700’ of 8” & 6” ductile iron water main Installed: four fire hydrants, and six valves *North Fork Trails Subdivision Installed approximately: 750’ of 6” ductile iron water main Installed: three fire hydrants, and five valves *English Ridge Subdivision Installed approximately: 480’ of 6” ductile iron water main *Monroe Bridge Project Installed approximately: 90’ of 8” ductile iron water main *Wolff Road (Water Main Loop) Installed approximately: 360’ of 6” ductile iron water main *Mount Saint Francis Installed approximately: 480’ of 8” ductile iron water main Villa Street (Cleveland Avenue to Rush Street) * Locust Street (Ninth Street to Seventeenth Street) * Locust Street at 13Street th * Locust Street at 17Street th * JF Kennedy Rd and Pennsylvania Avenue * Vernon Street and Glen Oak Street * Windsor Avenue at East 24Street th * Windsor Avenue at Ries Street * Windsor Avenue at Sutter Street * Jones Street and Locust Street * *Water Main Replacements Kaufmann Avenue (Chaney Road to JF Kennedy Road) Sunset Ridge (Wartburg Place to End) BrunskillRoad Bridge Reconstruction *Backflow Prevention Program *Central Avenue 20” Transmission Main Relocation *Water Main Extensions (As Requested) *Fire Hydrant Painting Program Paint 25% of hydrants annually *Annexation Estimated Proportions of Factors Contributing to Water Loss Meter Replacement Program Total Project Cost: $8,775,709 *Water Meter Repair Worker For FY’2011 the highest ranked city (West Des Moines) is approximately 62.9% higher than Dubuque The average water rate is approximately 28.3% higher than Dubuque The proposed 4% increase will impact the average residential user by an additional $0.68 per month