Award of Public Improvement Contract for 15 South Main Building Demolition (Parcel 106) Copyrighted J une 3, 2019 City of Dubuque Consent Items # 18. ITEM TITLE: Award of Public Improvement Contractfor 15 South Main Street (Parcel 106) Building Deconstruction Project SUMMARY: City Manager recommending that the award for the 15 South Main Street Building Deconstruction Project be officially recorded in the minutes of the City Council. SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Make Matter of Record ATTACHMENTS: Description Type Award 15 South Main Building Deconstruction Project- City Manager Memo MVM Memo Staff Memo Staff Memo THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 15 South Main Street (Parcel 106) Building Deconstruction Project Award of Public Improvement Contract lowa DOT Agreement No. 2019-16-138 lowa DOT Project No. NHSN-020-9 (254)-2R-31 DATE: May 28, 2019 Through the competitive quotation process for public improvements, the 15 South Main Street Building Deconstruction Project was awarded on May 23, 2019, to Mainline Excavating Co. Inc., in the amount of$33,999, which was 9.3°k under the estimate of probable cost. Assistant City Engineer Bob Schiesl recommends that the award for the 15 South Main Street Building Deconstruction Project be officially recorded in the minutes of the City Council. I concur with the recommendation and respectfully request Mayor and City Council approval. �1.� ��, i�,� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Bob Schiesl, Assistant City Engineer THE CTTY OF Dubuque �" ui���eNe�ary DUB E 'il��i;' Masterpiece on the Mississippi Z°°' Z°'Z 2013 2017 TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer DATE: May 28, 2019 SUBJECT: 15 South Main Street (Parcel 106) Building Deconstruction Project Award of Public Improvement Contract lowa DOT Agreement No. 2019-16-138 lowa DOT Project No. NHSN-020-9 (254)--2R-31 INTRODUCTION The purpose of this memorandum is to seek City Council concurrence in the award of the construction contract for the Bid Package 1 , 15 South Main Street Building Deconstruction Project. BACKGROUND In 2012, the lowa DOT purchased a portion of the former SELCO building located at 15 South Main Street for the purpose of preserving right-of-way property for the future construction of the US Highway 20 - Mississippi River bridge crossing. Per the terms of the purchase agreement, the seller could continue to use the portion of the state's purchased property. In 2017, the seller sold the remainder of the property Spahn & Rose for building material outdoor storage. The existing 11 ,000 sq. ft. steel building structure is now vacant and needs to be deconstructed, salvaged, and removed. The lowa DOT approached the City and requested assistance in the deconstruction of the 15 South Main Street property. The lowa DOT has agreed to reimburse the City for actual cost to deconstruct the onsite steel building and the disconnection of the public utilities from the property. Both the City and lowa DOT feel that potentially more competitive bids will be received if the deconstruction project is administered by the City and bid locally. The deconstruction project will be completed in two phases, Bid Package 1 will cover deconstruction of the building structure and Bid Package 2 will cover utility disconnects. BID RESULTS Sealed informal bids were received on May 23, 2019, for the 15 South Main Street Building Deconstruction Project. Mainline Excavating Co. Inc. of Dubuque, lowa, submitted the low bid in the amount of $33,999.00 which is 9.3% under the estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Name Total Bid Amount Mainline Excavating Co. Inc. $ 33,999.00 Drew Cook & Sons Excavating $ 39,850.00 Connolly Construction $ 54,100.00 RECOMMENDATION Through the competitive quotation process for public improvements, this project was awarded on May 23, 2019 to Mainline Excavating Co. Inc. of Dubuque, lowa, in the contract amount of$33,999.00. BUDGETIMPACT The estimate of probable cost for the 15 South Main Street Building Deconstruction Project is summarized in the following table: Description Cost Estimate Award Bid Package 1 - Building Deconstruction $ 37,500.00 $ 33,999.00 Building Deconstruction - Direct Landfill Fees 10,000.00 Contingency (10°k) 3,750.00 3,750.00 Engineering Design (7.5°k) 3,093.75 3,093.75 Construction Administration & Inspection (7.5°k) 3,093.75 3,093.75 Total Construction Cost Estimate $ 47,437.50 $ 53,936.50 The proposed project funding is summarized as follows: CIP No. Fund Description Fund Amount 100 1548 SELCO Building Demolition $ 53,936.50 lowa DOT Reimbursement- Based on Actual Costs Total Project Funding $ 53,936.50 ACTION TO BE TAKEN The City Council is requested to concur in the award the construction contract for the 15 South Main Street Building Deconstruction Project to Mainline Excavating Co. Inc. in the amount of$33,999.00. In accordance with the competitive quotation requirements of lowa Code, Section 26.14, it is necessary that the award for the 15 South Main Street Building Deconstruction Project be officially recorded in the minutes of the City Council. Attach. Prepared by Robert Schiesl, Assistant City Engineer cc: Jim Schnoebelen, Ken Yanna, lowa DOT District 6 Jenny Larson, Budget Director F:\PROJECTS\SELCO Bldg Demolition -2019\Council &Staff Documents\Award - Building Demo