Loading...
Chaplain Schmitt Veteran's Memorial Site Improvements_Initiate Copyrighted July 1, 2019 City of Dubuque Items to be set for Public Hearing # 1. ITEM TITLE: Chaplain Schmitt Veteran's Memorial Site Improvements Project- I nitiate SUMMARY: City Manager recommending initiation of the public bidding procedure for the Chaplain Schmitt Veteran's Memorial Project, and further recommends that a public hearing be setfor July 15, 2019. RESOLUTION Preliminaryapproval of plans, specifications, form of contract and estimated cost; setting the date for a public hearing on plans, specifications, form of contract, and estimated cost; and ordering the advertisement of bids for the Chaplain Schmitt Veteran's Memorial Project SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s), Set Public Hearing for July 15, 2019. ATTACHMENTS: Description Type Chaplain Schmitt Veteran's Memorial Project-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY OF � uI�AaMca cih DuB E � � I � � I Maste iece on the Mississi i Zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Chaplain Schmitt Veteran's Memorial Project Request to Initiate Construction Bidding CIP: 100-2781 DATE: June 26, 2019 Project Manager Steve Sampson Brown recommends initiation of the public bidding procedure for the Chaplain Schmitt Veteran's Memorial Project, and further recommends that a public hearing be set for July 15, 2019. I concur with the recommendation and respectfully request Mayor and City Council approval. � Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Steve Sampson Brown, Project Manager Jesus Aviles, Dubuque Racing Association President & CEO Gary Dolphin, Chaplain Schmitt Project Advisory Committee Member Kevin Lynch, Chaplain Schmitt Project Advisory Committee Member Marie Ware, Leisure Services Manager THE CTTY OF Dubuque �" ui���eNe�ary DUB E ,il��i;' Masterpiece on the Mississippi Z°°' Z°'Z 2013 2017 TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Steve Sampson Brown, Project Manager SUBJECT: Chaplain Schmitt Veteran's Memorial Project Request to Initiate Construction Bidding CIP: 100-2781 DATE: June 24, 2019 INTRODUCTION The enclosed resolutions authorize the initiation of the public bidding procedure for the Chaplain Schmitt Veteran's Memorial Project. BACKGROUND At the November 5, 2018 City Council Meeting approved the Chaplain Schmitt Island Improvement Agreement between the City of Dubuque and the Dubuque Racing Association, LTD (DRA) for the development of the Chaplain Schmitt Veteran's Memorial Project. At the December 17, 2018 City Council Meeting, the City Council approved giving authorization to the City Manager to negotiate the final terms of an agreement with RDG Planning & Design (RDG) and to execute a contract for design, engineering and construction administration services for the Chaplain Schmitt Veteran's Memorial Project. RDG has completed their design work and the contract documents for the project are ready for bidding. DISCUSSION The proposed improvements for the new memorial will include a number of amenities to honor Veterans, Chaplain Schmitt himself, and improve the overall experience and enhance the existing monuments. All of the existing memorial elements will be preserved in their current location or integrated into the new layout. The proposed improvements include enhancing the Veterans Memorial Plaza by improving the edge of the pond with a pathway, seating and plaza expansion space for additional memorials and Veterans' tributes. A gateway sign will also be installed where Admiral Sheehy Drive intersects E. 16�h Street along with clean-up of the pond edge to enhance viewsheds. The proposed Chaplain Schmitt Island Memorial is composed of a decorative swirling concrete path that transforms into an elevated boardwalk that extends from the Veteran's Plaza over the pond. Located at the end of the boardwalk is Page 1 of 4 a circular landing that contains a structure/sculpture titled "Skyward". This structure/sculpture is a 52' long stainless-steel sheet with vertical cut slits that is 24' high on one end and tapers down to 15' on the other end. The sheet is then loosely rolled to a diameter of 11'. An opening allowing pedestrians to enter the sculpture to where they will be able to read a poem which will be etched on the metal. Colorful nighttime lighting will be used in a subtle way to honor our Veterans and add prominence to the memorial. An improved and expanded Memorial Plaza will facilitate formal and informal gatherings, ceremonies, and contemplation. The Plaza will become part of the overall public space system on the Island. As part of the project, the Tri-State Vietnam Veteran's Memorial which is currently located by Miller Riverview Park will be relocated to the Memorial Plaza. In accordance Section 2.2 of the Dubuque Racing Association Chaplain Schmitt Island Improvement Agreement by and between the City of Dubuque, lowa and The Dubuque Racing Association, LTD dated October 25, 2018, all design, bids, change orders over $5,000.00, and design changes must be approved by a majority of the Chaplain Schmitt Project Advisory Committee. On June 14, 2019 the Chaplain Schmitt Project Advisory Committee met and affirmed the final project scope, budget, and to initiate bidding on the project. The members of the Advisory Committee are: For City: Mike Van Milligen — City Manager' Gus Psihoyos — City Engineer Marie Ware — Leisure Services Manager For DRA: Rick Dickinson Gary Dolphin Kevin Lynch ' Not present at the June 14, 2019 meeting, all other members were present. PROJECT SCHEDULE The schedule for the project will be as follows: Initiate Bidding July 1 , 2019 Publish Notice to Bidders, Advertisement for Bids July 5, 2019 Notice of Hearing on Plans & Specifications July 5, 2019 Public Hearing July 15, 2019 Receipt of Bids August 1 , 2019 Award of Contract August 19, 2019 Substantial Completion Date May 18, 2020 Page 2 of 4 RECOMMENDATION I recommend that the City Council establish a date for the public hearing and authorize the City Clerk to advertise for proposals Chaplain Schmitt Veteran's Memorial Project. BUDGETIMPACT The estimate of probable cost for this project is summarized as follows: PROJECT COSTS ESTIMATE Construction Hard Costs Construction Contract — Base Bid $2,511 ,000.00 Contin enc 4°k $100,440.00 Parkin S ace Re lacement $68,750.00 Total - Bid Project Cost $2,680,190.00 Optional Add Alternates: #1 — 24" modified subbase under paving $60,000.00 #2 — South Point Picnic Area, including 24" subbase $229,000.00 #3 — South Point Landing, including 24" subbase $220,000.00 #4 — High Performance Coating for Galvanized Guardrails and $44,000.00 Handrails Project Soft Costs En ineerin /Architect Desi n & Construction Admin. Fees $522,700.00 Cit Staff Administration & Const. Ins ection Fees $16,000.00 Total — Project Soft Costs $538,700.00 TOTAL PROJECT COST (Without Bid Alternates) $3,218,890.00 The funding summary for the Chaplain Schmitt Veteran's Memorial Project is as follows: CIP Funding Source Amount 100-2781 Chaplain Schmitt Veteran's Memorial Project $3,220,000.00 Total Available Project Funding $3,220,000.00" " The base bid total project cost is $2,511 ,000 which fits within the available funding for this project. If the City benefits from a competitive bidding environment and bids for both the Base Bid and any of the bid alternates are below $3,220,000, then the City will Page 3 of 4 select the bid alternates in numerical order and included them as part of the award for this project. Otherwise only the base bid will be used as the basis of award for this project. Chaplain Schmitt Island Improvement Agreement between the City of Dubuque and the Dubuque Racing Association, LTD (DRA) stipulates if the cost of the project exceeds $3,220,00.00, and if both parties agree to increase the project budget the DRA and the City will split any excess costs equally on a 50/50 basis. ACTION TO BE TAKEN I respectfully request that the City Council grant preliminary approval to the construction plans and specifications; and establish July 15, 2019 as the date of the public hearing; and hereby authorized the City Clerk to advertise for bid proposals for the Chaplain Schmitt Veteran's Memorial Project through the adoption of the attached resolutions. SSB\ssb Attachments cc: Marie Ware — Leisure Services Manager Chaplain Schmitt Project Advisory Committee F:\PROJECTS\Chaplain Schmitt Veterans Memorial Project\City Council Documentation\1_Initiate\Chaplain Schmitt Veteran's Memorial-Initiate Bid Memo.docx Page 4 of 4 RESOLUTION NO. 247-19 CHAPLAIN SCHMITT VETERAN'S MEMORIAL PROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA THAT: Section 1. The proposed plans, specifications, form of contract and estimated cost for the Chaplain Schmitt Veteran's Memorial Project in the estimated amount $2,511,000.00, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. Section 2. A public hearing will be held on the 15th day of July 2019, at 6:00 p.m. in the Historic Federal Building Council Chambers (second floor) 350 W. 6th Street, Dubuque, Iowa, at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. Section 3. The Chaplain Schmitt Veteran's Memorial Project is hereby ordered to be advertised for bids for construction. Section 4. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. Section 5. The City Engineer is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the Notice to Bidders to be published on the City of Dubuque website and a contractor plan room service with statewide circulation, which notice shall be published not Tess than thirteen but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 1st day of August 2019. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:00 p.m. on the 19th day of August 2019, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Passed, approved and adopted this 1St day of July 2019. Attest: Kevin ". Firnstahl, C C, ity Clerk Jake Rios, Mayor Pro Tem NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR CHAPLAIN SCHMITT VETERAN'S MEMORIAL PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, lowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Chaplain Schmitt Veteran's Memorial Project, in accordance with the provisions of Chapter 26, Code of lowa, at 6:00 p.m., on the 15�h day of July 2019, in the Historic Federal Building Council Chambers (second floor), 350 West 6�h Street, Dubuque, lowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: The proposed improvements include enhancing the Veterans Memorial Plaza by improving the edge of the pond with a pathway, seating and plaza expansion space for additional memorials and veterans' tributes. A gateway sign will also be installed where Admiral Sheehy Drive intersects E. 16�h Street along with clean-up of the pond edge to enhance viewsheds. The proposed Chaplain Schmitt Island Memorial is composed of a decorative swirling concrete path that transforms into an elevated boardwalk that extends from the Veteran's Plaza over the pond. Located at the end of the boardwalk is a circular landing that contains a structure/sculpture titled "Skyward". This structure/sculpture is a 52' long stainless-steel sheet with vertical cut slits that is 24' high on one end and tapers down to 15' on the other end. The sheet is then loosely rolled to a diameter of 11'. An opening allowing pedestrians to enter the sculpture to where they will be able to read a poem which will be etched on the metal. Colorful nighttime lighting will be used in subtle way to honor our veterans and add prominence to the memorial. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 1 S� day of Julv 2019. Kevin S. Firnstahl, CMC, City Clerk