Acceptance of English Ridge Subdivision - Storm Water Detention Facility Improvements Copyrighted
July 15, 2019
City of Dubuque Consent Items # 12.
ITEM TITLE: English Ridge Subdivision -Acceptance of Storm Water
Detention Facility Improvements
SUMMARY: City Manager recommending acceptance of the public
storm water detention facility improvements that the
developer, English Ridge LLC, has recentlycompleted in
English Ridge Subdivision.
RESOLUTION Accepting Public Storm Water Detention
Facility Improvements in English Ridge Subdivision in
the City of Dubuque, lowa
SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Adopt
Resolution(s)
ATTACHMENTS:
Description Type
English Ridge Subdivision Storm Water Detention City Manager Memo
Facility-MVM Memo
Staff Memo Staff Memo
Resolution Resolutions
Area Map Supporting Documentation
Dubuque
THE CITY OF �
uI�AaMca cih
DuB E � �
I � � I
Maste iece on the Mississi i Zoo�•zoiz•zois
YP pp zoi�*zoi9
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Acceptance of Storm Water Detention Facility Improvements in English
Ridge Subdivision
DATE: July 8, 2019
City Engineer Gus Psihoyos is recommending acceptance of the public storm water
detention facility improvements that the developer, English Ridge LLC, has recently
completed in English Ridge Subdivision. Maintenance of the detention facility would
become the responsibility of the City, with the costs of same being assessed to the
property owners within all phases of the English Ridge Subdivision.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
v
Mic ael C. Van Milligen
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Teri Goodmann, Assistant City Manager
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
�
THE CITY OF P„r Dti�Uqit�
� �
�-AmerieaG�ty
� �
Masterpiece on the Mississippi ���,.Z�,�.Zn,�
TO: Michael C. Van Milligen, City Manag�
FROM: Gus Psihoyos, City Engineer , ���.,.
�-
DATE: June 28, 2019
SUBJECT: Acceptance of Storm Water Detention Facility Improvements in English
Ridge Subdivision
INTRODUCTION
The enclosed material provides for City Council acceptance of the public storm water
detention facility improvements that the developers, English Ridge LLC, have recently
completed in English Ridge Subdivision.
BACKGROUND
English Ridge Subdivision includes five phases of residential lots off of Stone Valley
Road. As a condition of subdivision plat approval through Resolution No. 31-09, the
developer of English Ridge Subdivision was required to install certain public
improvements including street paving with curb, sanitary sewer main, watermain, storm
sewers and catch basins, boulevard street lighting, and storm water detention facilities
and to dedicate said improvements to the City upon completion. In 2018, all public
improvements were completed by the developer and accepted by the City except for the
storm water detention facility.
DISCUSSION
Subdivision Ordinance requires that upon completion of all the required public
improvements, the subdivider shall notify the City in writing of the completion of the
improvements, requesting that the City either approve or reject the acceptance of the
improvements, together with a statement of reasons for any rejection.
On June 24, 2019, the owners requested City's acceptance of the storm water detention
basin improvements in English Ridge Subdivision. As a condition of subdivision plat
approval through Resolution No. 31-09, Section 4, the developer of English Ridge
Subdivision was required to own and maintain the storm water detention facility until all
of the following were complied with:
1. The detention basin has been fully completed.
2. 80% of the platted subdivision lots have been developed.
3. Adequate erosion control measures, as approved by the City, have been
installed on the remaining 20% of the lots.
Upon review and inspection by the City, it has been determined that the above
described conditions from Section 4 of Resolution No. 31-09 have been met and that
the public improvements required by Resolution No. 31-09, have been completed in
accordance with plans approved by the City Council and in conformance with City
specifications. Maintenance of the detention facility would become the responsibility of
the City with the costs for same being assessed to the property owners within all phases
of the English Ridge Subdivision.
RECOMMENDATION
I would, therefore, recommend that the City Council accept the public storm water
detention facility improvements as described above.
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution accepting the public
storm water detention facility improvements in English Ridge Subdivision.
Prepared by Nate Kieffer, Land Surveyor
CC. Dean Mattoon, Engineering Assistant
Prepared by Gus Psihoyos, City Engineer, 50 W. 13th St., Dubuque, IA 52001, 563-589-4276
Return to Kevin Firnstahl, City Clerk, 50 W. 13th St., Dubuque, IA 52001, 563-589-4100
RESOLUTION NO. 256-19
ACCEPTING PUBLIC STORM WATER DETENTION FACILITY IMPROVEMENTS IN
ENGLISH RIDGE SUBDIVISION, IN THE CITY OF DUBUQUE, IOWA
Whereas, pursuant to Resolution 31-09, certain public storm water detention facility
improvements were installed by the developer of English Ridge Subdivision in the City
of Dubuque, Iowa; and
Whereas, the improvements have been completed and the City Manager has
examined the work and has filed a certificate stating that the same has been completed
in accordance with the plans approved by the City Council and in conformance with City
specifications, and has recommended that the improvements be accepted by the City
Council.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA THAT:
Section 1. The recommendation of the City Manager be approved and that said
public storm water detention facility improvements in English Ridge Subdivision be and
the same is hereby accepted.
Passed, approved and adopted this 15th day of July 2019.
Attest:
Kevin ``. Firnstahl, City Clerk
Roy D. Buol, Mayor
TDuB E LOCATIONMAP DAGIS ..�
o�a�Q�E�aE����aPP�����,��R�a.�o�sr,.E�
Masterpiece or�Nic Mi�sissippi
..�
�� �
�,!� v z _r= ����''
������ , _ s�� _
�,���,,
�: �! ��� ��
,.�.-
h� ,� �,�
t� � ��
� �-J. �f�#�'*(4��� .
r �� `�`'.�Sa f�: _
[ ` ! ._. .:- s'_
�., A� �-" SUBDIVISION J �, , � . ' , ' '.-�� �
,� ; � :� -
a
'�'+�� ' �g. � � �� �� � 9���-
� .� � " - —
�'� � _ "'���
. , � .�� ,�,� ,
�� ,� _ ; ��. ; �.�
;
,; . � , �
� � �, � '' �� ;�
` r :;a_ - �_
„ � , � � r i r �
� F � s '._ �
� � . ,ar
� ._ . �`` .
`�'u : � � ,. � �. _ , �
_ �_.__ ,�
C ' - �=°:��;� d � ! � �
,
❑ , .:
J � � ._
' W � .,.
1 - —— �` �, �_ �
�
� � "
� k �
, i
� ��
, � �
r r� _
_,. .
__ ,
� TORM WATER � ' � ��
( r ; _ _
�--DETENTION � � '� � � � � �
�"BASIN �nr_ii iTv � � � ��
, : ,
. . � �r
, �. r ;, a , � r
.r . .; .�.:-
. ,_ ,
,� _ - . .,
:, ,
— — � � t,;
�
- — � `._ ����� r � �
. r.��`�?_',
' ��� . :;����.�'"� -..._� ,4
�
DISCLAIMER:Thls Informatlon was complled
�sing the Dubuque Area Geographlc Informatlon SVstem
oAcis�,wnid,md�d�dar���eaeed ev eom me cin oF � Map P�epa�ed by:
o�e�a�e a�d o�e�a�e co��N. ie is��de�srood mae,wnue
me ciev oF o�e�q�e a�d pa�eidpaei�g age�d��ewzed me City of Dubuque
mo��,��e�ca�d a���ce��fo�mac�o�a�auabie,oA��s a�d 1 inch = 300 feet Engineering Division
ie�s�,vvue�s do�oe wa��a�e me a����a�v o�����e��v of ine
mr��maeio�o�dar��o�eai�ed ne�em rne ciev a�d Pa�ei�iPaei�g 50 West 13th St�eet
age��i�snau�oe ee neia uaeie Fo�a�v ai�e�e,i�ai�e�e,i��iae�eai, Dubuque,lowa 52001
���a�e�eiai,v��ieroe,o�svedai damae�,wneme�ro��eaeie o�
��r��eeaeie,a�isi�g o�r oF me a�mo�ized o���a�mo�ized��oF 100 50 0 100 200 300 400 Feet Phone:(563)589-4270
mis daea o�me i�aewev eo��mis daea o�o�e oF a�v e�ea�n oF
wa��a�ry wna�oe�� Fax.(563)589-4205