Acceptance of 2019 Asphalt Overlay Ramp Project One Copyrighted August 19, 2019 City of Dubuque Consent Items # 14. ITEM TITLE: Acceptance of 2019Asphalt Overlay Ramp Project One SUMMARY: City Manager recommending acceptance of the construction contract for the 2019 Asphalt Overlay Access Ramp Project One as completed by Drew Cook& Sons Excavating Co. Inc. RESOLUTION Accepting the 2019 Asphalt Overlay Access Ramp Project one and authorizing the final payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Adopt Resolution(s) ATTACHMENTS: Description Type 2019 Asphalt Overlay Access Ramp Project One-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY OF � uI�AaMca cih DuB E � � I � � I Maste iece on the Mississi i Zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2019 Asphalt Overlay Access Ramp Project One (CIP 2501227) DATE: August 12, 2019 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2019 Asphalt Overlay Access Ramp Project One, as completed by Drew Cook & Sons Excavating Co. Inc., in the final contract amount of $141,684.93, which is a 26.65% increase from the contact amount of $111,875.00. A large quantity of curb was included in this contract. The 180 linear feet of curb was in very poor condition and needed to be replaced. The concrete base under the asphalt pavement on Forest Lane was another unexpected expense which was a result of the poor roadway condition that was encountered. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE CITY OF � All•Amerip 6ih D B E L���. U � � , ��� � � Maste iCce on the Mississi 1 2oo�•zoiz•zoi3 �P pp 2017*2019 TO: Michael C. Van Milligen, City Manager � .r FROM: Gus Psihoyos, City Engineer `;, � _ :...� SUBJECT: 2019 Asphalt Overlay Access Ramp Project One (CIP 2501227) DATE: August 19, 2019 INTRODUCTION The enclos�c! resc�lutic�n provic�es for th� a�ce�tance o# the canstruction contrac# and establishment of the Final Schedule of Assessments for the 2019 Asphalt Overlay Access Ramp Project One. BACKGROUND The project replaced thirty non-compliant access ramps with thirty-five compliant, directional ramps as per Public Right of Way Accessibiiities Guidciii��s (PROvJA�j specifications in conjunction with the Public Works Asphalt Overlay Program involving the following intersections: • Forest Lane & Delhi Street, one single ramp. • Forest Lane & Glen Oak, two single and two double ramps. • Forest Lane alley between Glen Oak & N. Booth, two single ramps. • Forest Lane � N. �ooth Street, two single and twQ dol�ble ram�s. • Forest Lane & Nevada Street, two single ramps. • Needham Place & 7t" Street, two single ramps. • Needham Place & Prospect Street, two single ramps. • Needham Place & 5�h Street, two single r�mps. • Winona Street at alley south of W. 5t" Street, two single ramps. • Winona Street at alley north of W. 3�d Street, four single ramps. • Winona Street & W 3�d Street, two single ramps. • Melrose Terrace & Paulina Street, two single ramps. • Melrose Terrace & Alpine Street, two single ramps. DISCUSSION The 2019 Asphalt Overlay Access Ramp Project One was completed by Drew Cook & Sons Excavating Co. Inc. of Dubuque, IA in the final contract amount of $141,684.93. This is a 26.65% increase over the contract amount of $111,875.00. A large quantity of curb was included in this contract. The 180 linear feet of curb was in very poor condition and needed to be replaced. The concrete base under the asphalt pavement on Forest Lane was another unexpectea expense wnich was a resuii oT tne pr�nr roadway condition that was encountered. SPECIAL ASSESSMENTS Two of the properties on Needham Place had severely deteriorated sidewalk that needed to be replaced. When City staff reviewed the pedestrian ramps to be replaced, these sidewalks were inspected and marked up. City staff worked with the abutting property owners and they agreed to a voluntary assessment to replace their sidewalks. City staff shared the financial assistance availability with the property owners. Both property owners qualified for financial assistance based on HUD guidelines. The total assessment for the sidewalk replacement was $1,433.80. After applying the financial assistance, the assessment to the property owners totaled $180.72. BUDGET IMPACT The summary of project costs for the 2019 Asphalt Overlay Access Ramp Project One is as follows: Description Estimate Award Final Construction Contract $ 115,319.00 $ 111,875.00 $ 141,684.93 Contingency 11,531.90 11,531.90 0.00 Construction Administration & Inspection 19,027.64 19,027.64 21,252.74 Total Construction Cost $ 145,878.54 $142,434.54 $162,937.67 The project funding is summarized below: Fund CIP No. � Fund Descripti�n Amount 2501227 Curb Ramp Program $ 162,756.95 Special Assessment $ 180.72 Total Project Funding $ 162,937.67 REQUESTED ACTION The City Council is requested to adopt the attached resolutions accepting the improvements and to authorize the final payment of the contract amount of $141,684.93 to Drew Cook & Sons Excavating Co. Inc. for the 2019 Asphalt Overlay Access Ramp Project One. Prepared by: Luke Steger, Engineering Technician cc: John Klostermann, Public Works Director Arielle Swift, Assistant Public Works Director Jenny Larson, Budget Director 2 Jon Dienst, Civil Engineer II Paui Davis, Public Works Supervisor 3 RESOLUTION NO. 288-19 ACCEPTING THE 2019 ASPHALT OVERLAY ACCESS RAMP PROJECT ONE AND AUTHORIZING THE FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2019 Asphalt Overlay Access Ramp Project One, (the Project) has been completed by the Contractor, Drew Cook & Sons Excavating Co. Inc. (Contractor), and the City Engineer has examined the work and signed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $141,684.93; WHEREAS, the Contractor has previously been paid $134,600.68, leaving a balance of $7,084.25; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Curb Ramp Program CIP appropriations for the contract amount of $141,684.93 Tess any retained percentage provided for therein as provided in Iowa Code. Section 3. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $7,084.25 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter, 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 19th day of August 2019. Attest: Kevi S. Firnstahl; CMC City Clerk oy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF 2019 ASPHALT OVERLAY ACCESS RAMP PROJECT ONE The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2019 Asphalt Overlay Access Ramp Project One, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $162,9:37.67. Dated this day of , 2019. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the, day of J , 2019.