Acceptance of Storm Water Detention Facility Improvements in Pebble Cove Copyrighted
August 19, 2019
City of Dubuque Consent Items # 19.
ITEM TITLE: Acceptance of Storm Water Detention Facility
Improvements in Pebble Cove Subdivision
SUMMARY: City Manager recommending acceptance of the public
storm water detention facility improvements that the
developer, Kivlahan Farms L.C., has recentlycompleted in
Pebble Cove Subdivision Phase 1.
RESOLUTION Accepting Public Storm Water Detention
Facility Improvements in Pebble Cove Subdivision (Phase
1), in the City of Dubuque, lowa
SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Adopt
Resolution(s)
ATTACHMENTS:
Description Type
Pebble CoveAcceptance of Storm Water Detention City Manager Memo
Facility-MVM Memo
Staff Memo Staff Memo
Resolution Resolutions
Area Map Resolutions
Dubuque
THE CITY OF �
uI�AaMca cih
DuB E � �
I � � I
Maste iece on the Mississi i Zoo�•zoiz•zois
YP pp zoi�*zoi9
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Acceptance of Storm Water Detention Facility Improvements in Pebble
Cove Subdivision — Phase 1
DATE: August 9, 2019
City Engineer Gus Psihoyos is recommending acceptance of the public storm water
detention facility improvements that the developer, Kivlahan Farms L.C., has recently
completed in Pebble Cove Subdivision Phase 1. Maintenance of the detention facility
will become the responsibility of the of the City, with the costs for same being assessed
to the property owners within Pebble Cove Subdivision Phase 1.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
v
Mic ael C. Van Milligen
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Teri Goodmann, Assistant City Manager
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Dubuque
THE CITY OF �
Ali•Ameriq Cih
DUB E ` �� � � '
� � � ��
MC1stC' iece On tl2e MissiSsi i zoo�•Zoi2•zoi3
� p� 2017*2019
TO: Michael C. Van Milligen, City Manager �. _- _
�� �
FROM: Gus Psiho os Cit En ineer ���---`--��
Y , Y J _....,✓
DATE: August 5, 2019
SUBJECT: Acceptance of Storm Water Detention Facility Improvements in Pebble
Cove Subdivision — Phase 1
INTRODUCTION
The enclosed material provides for City Council acceptance of the public storm water
detention facility improvements that the developers, Kivlahan Farms L.C., have recently
completed in Pebble Cove Subdivision Phase 1.
BACKGROUND ,
Pebble Cove Subdivision includes two phases of residential lots off of David Drive. As a
condition of subdivision plat approval through Resolution No. 171-08, the developer of
Pebble Cove Subdivision Phase 1 was required to install certain public improvements
including street paving with curb, sanitary sewer main, watermain, storm sewers and
catch basins, boulevard street lighting, and storm water detention facilities and to
dedicate said improvements to the City upon completion. In 2016, all public
improvements were completed by the developer and accepted by the City except for the
storm water detention facility.
DISCUSSION
Subdivision Ordinance requires that upon completion of all the required public
improvements, the subdivider shall notify the City in writing of the completion of the
improvements, requesting that the City either approve or reject the acceptance of the
improvements, together with a statement of reasons for any rejection.
On August 5, 2019, the owners requested City's acceptance of the storm water
detention basin improvements in Pebble Cove Subdivision Phase 1. As a condition of
subdivision plat approval through Resolution No. 171-08, the developer of Pebble Cove
Subdivision Phase 1 was required to own and maintain the storm water detention facility
until all of the following were complied with:
1. The detention basin has been fully completed.
2. 80�/0 of the platte� subdivision lots have been developed.
3. Adequate erosion control measures, as approved by the City, have been
installed on the remaining 20% of the lots.
Upon review and inspection by the City, it has been determined that the above
described conditions from Resolution No. 171-08 have been met and that the public
improvements required by Resolution No. 171-08, have been completed in accordance
with plans approved by the City Council and in conformance with City specifications.
Maintenance of the detention facility would become the responsibility of the City with the
costs for same being assessed to the property owners within Pebble Cove Subdivision
Phase 1.
RECOMMENDATION
I would, therefore, recommend that the City Council accept the public storm water
detention facility improvements as described above.
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution accepting the public
storm water detention facility improvement� in Pebble Cove Subdivision Phase 1.
Prepared by Nate Kieffer, Land Surveyor
CC. Dean Mattoon, Engineering Assistant
RESOLUTION NO. 293-19
ACCEPTING PUBLIC STORM WATER DETENTION FACILITY IMPROVEMENTS IN
PEBBLE COVE SUBDIVISION (PHASE 1), IN THE CITY OF DUBUQUE, IOWA
Whereas, pursuant to Resolution 171-08, certain public storm water detention facility
improvements were installed by the developer of Pebble Cove Subdivision (Phase 1) in
the City of Dubuque, Iowa; and
Whereas, the improvements have been completed and the City Manager has
examined the work and has filed a certificate stating that the same has been completed
in accordance with the plans approved by the City Council and in conformance with City
specifications, and has recommended that the improvements be accepted by the City
Council.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
Section 1. That the recommendation of the City Manager be approved and that said
public storm water detention facility improvements in Pebble Cove Subdivision (Phase
1) be and the same is hereby accepted.
Passed, approved, and adopted this 19th day of August 2019.
L.-
%/ Roy D. Buol, Mayor
Attest:
Kevi S. Firnstdhl, Ciy Clerk
TDu$ E PEBBLE COVE SUBDIVISION DAGIS ,�
o�e�Q�E�aER���aAP�����,��aMa.�ovs.,.E�
Mnsterpiere on the Mississippi AREA MAP
�
� ': ;a � �y � X � ,,
r + a 'y�
t y� E' �� � :� '� � �� � �.
� ��, �i � ,- � ��� �.,�y�. �� �����
_
;�. . � ;� `��� �'� �� - a ''b; `� � �'+�' _.r „�'" ' , � .
s�' k � ,
,' � ,- �4 ��. , - ' _ .. � �
�� � �� � �
� , ..�� --.i�' y,,, y. . ��'.. 4 ..a .
"0 5" :n.
� � �.
w. �
� if
Y
�y
`F . �4 }*y�. .'� .. x� �,.!� _ 11 �
. ,<.: .� �:c � . .r"� �. .� .•Y*- �1� r
,..^
�
' ' �r ' F... �..�•.-
"
�. �'. 7{+�, ' ;E �' ; a 'n ry . _ � .
.. ..^ `v g^�� �,. n�� � � ,- �..r y� ^�. �. ..� .-_.
, r
�
. � ��/ � S .y_
�. �
� , . .
- , -.. . , 4 . . .
� �. af`a��' � � .x� -,.. . �..�q � . . YY �� � �-,�
� . }^ '` .. ... �
, ;. ��t �r" �-- '�� � r
,
'� _ -
� _� .��
„ {�� .,: „ �� � � ..- �� .
.
` �
a� � � � �
� -� •�_ �_
; � �.
� � � �, � �
r _� ,, � ��.,, � � �� �'� �� � ��� " �- �,
�< � �w.:,� �' �� = �
i� �� ��'�'� �.
r�, '�.» � .,��� �'"� �">,
;9 `y .o��.q � "n ' 'f. +V', "��'.
� �,
.. .
a,.
s. t .,
.� � ,�>�
� �;� ,� �� -- � �.��
. , , �. .
' -" "`: ��_ - ���� � �
�
� � �.
. , . �
. -
_ � .. „ ,--� �� � .� ,
� . .., �.-�'fr ,/� . ' `��•� s, �`�t a �
� . .. .,� . . .,.. . v' '�t�,
.. �_ . ., � , � , ,M`�=�` .��
fin fi � y {
.�:�t . g ,�y��1;�" '�� ey k� 4{ ry�' � '.
'ffS �'Rt`YXy �r,�"�C fl ' �, _5�`�� M �� � ..� .
r �
fe; ,�„�'.)':::.
' , ...�.. ._ _
� .�� ��_ \ y � 1 �' � �',ec�`"..�� �
y �
.
sg� `` jb4�' P �.
... �d�"�� �� � � '"'ti a � '� , �
.,
a „+
�
j
� 3 �
. _ ,"�'�` . ,c .E �, l . _ � �'C _ ♦ - i�
,.
\
�
y. � . .. , ,� . . , �. .-,�,` y .
+ ��
\
��
�
.
_- . . ,. _ , ', r -
. �,
,c•' �� � _ y* M �a �a ,�, �` 1 �� � �
_ � , �
� . � � '�
/ '
.
�,�'`�." �,a.� � y r�s' �` \ i ;3' ,r��,
_- ,. , � �
< �
.�� �,
� � . v'
�„�� " �.� r � � � . � '�� �� ��
���
.
� _ * �
,
� " � ,� �^ �� ��:,.� � � ��
„ �
.-° ,�y � �" „ ��� ,� ��
� , �� Y. � � �i � _ I � k_
.� y
r.'
a ,
. �
7 - ,.r� yy� • . , .
"' tl6! �',��n; '1�.'1.�. ` �' ,:�w. �y:.a.^32E��h'.�a `�.f .. � ���. �_ � .
� �' �
. . ,. r
, �.. . . . .� � ' ...,,,
, . .. ;. ,. .m .; ..... s��,.4i�o-c� .; ,.... . , Y,_ � :. f ..,`' � ..:� 1...,.§.
- _ \ \\ � p .. .1
1
�� � � �-.
`��: �° ,..--� � r +�,
` _tStSLt F'tI�I�Lt ,` �~. �, �_ t r-
, ,
,. _ - ' ,
�
OVE SUB. COVE SUB. - � � r
� ,�� �� � * ,� - �- � )ETENTION `
,,�. �� HASE 2 PHASE 1 _ �OND "
� � >���� - a�� ` �Dubuque�'Co As,s,essor
- 'MPROVEMENTS
DISCLAIMER:TY.._...._....___....____...�.._ � .. .
�sing the Dubuque Area Geographlc Informatlon SVstem
oAcis�,wnid,md�d�dar���eaeed ev eom me ciev oF � Map P�epa�ed by:
Dubuque and Dubuque County. It Is understood that,whlle
me cin oF o�e�q�e a�d pa�eidpaei�g age��i��ewzed me City of Dubuque
mo�����e�ca�d a��,�ace��fo�mac�o�a�auabie,oA��s a�d 1 ineh = 300 feet Engineering Division
ie�s�,vvue�s do�oe wa��a�e me a����v o��,��e�a of ine
mr��maeio�o�dar��o�r�i�ed ne�em rne ciev a�d Pa�ei�iPaei�g 50 West 13th St�eet
age��i�snau�oeeeneia uaeieFo�a�vai�e�e,i�ai��e,i��iae�ri, Dubuque,lowa 52001
���a�e�eiai,v��ieroe,o�sve�iai aamae�,wneme�Fo��e�eie o�
��r��eaeie,a�isi�g o�r oFme a�mo�ized o���a�mo�ized�se oF 100 50 0 100 200 300 400 Feet Phone:(563)589-4270
mis daea o�me i�aewN ro��enis dar�o�o�e oF a�v e���n oF
wa��a�ry wna�oe�e� Fax.(563)589-4205