Loading...
Deborah & Jeffrey Drive_Drain Tile Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Deborah & Jeffrey Drive Drain Tile Project DATE: February 23, 2010 Dubuque kilkitl Al4mudaglf t r 2007 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Deborah and Jeffrey Drive Drain Tile Project, as completed by Top Grade Excavating, Inc., in the final contract amount of $44,407.74, which is a 14.8% decrease from the original contract amount of $50,967.21. The cost of the project was less than anticipated because the contractor was able to limit the size of the excavation required to install the storm sewer and drain tile. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer ` Michhl C. Van Milligen Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Mana r FROM: Gus Psihoyos, City Engineer DATE: February 18, 2010 SUBJECT: Deborah & Jeffrey Drive Drain Tile Project CIP 7201354 INTRODUCTION BACKGROUND DISCUSSION RECOMMENDATION Dubuque kernil AI- Anerlca City 2007 The enclosed resolution provides for the acceptance of the construction contract for the Deborah & Jeffrey Drive Drain Tile Project. The Deborah & Jeffrey Drive Drain Tile Project involved the extension of approximately 425 feet of storm sewer, the installation of approximately 610 feet of drain tile and three storm sewer intakes in the Deborah and Jeffrey Drive corridor. The project was awarded based on a competitive quotation process for public improvements in accordance with Iowa Code, Section 26.14. The 2009 Intake Reconstruction Project was completed by Top Grade Excavating, Inc. of Epworth, Iowa, in the final contract amount of $44,407.74, which is a 14.8% decrease from the original contract amount of $50,967.21. The cost of the project was less than anticipated because the contractor was able to limit the size of the excavation required to install the storm sewer and drain tile. I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $44,407.74 to Top Grade Excavating, Inc. for the Deborah & Jeffrey Drive Drain Tile Project. BUDGET IMPACT The total cost for the Deborah & Jeffrey Drive Drain Tile Project is as follows: Award Final Construction Contract $50,967.21 $44,407.74 Contingency 5,905.25 Engineering 9,743.66 4,000.00 Total Project Cost $66,616.12 $48,807.74 The project was funded through the Drain Tile Program (CIP #7201354). ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $44,407.74 to Top Grade Excavating, Inc. for the Deborah & Jeffrey Drive Drain Tile Project. cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer II Chuck Gau, Engineering Technician ACCEPTING THE DEBORAH & JEFFREY DRIVE DRAIN TILE PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Deborah & Jeffrey Drive Drain Tile Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Drain Tile Program appropriation for the contract amount of $44,407.74 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 1 day of March j 010. Atte —1//_ _ -- anne F. Schneider, CMC, City Clerk RESOLUTION NO. 57 -10 Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE DEBORAH & JEFFREY DRIVE DRAIN TILE PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Deborah & Jeffrey Drive Drain Tile Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $48,407.74. Dated this Ai day of Cemotav , 2010. Filed in the office of the City Clerk on thi'day City Engineer eanne F. Schneider, CMC, City Clerk Project Name: CIP Number: Project Contract Amount: Project Completion Date: DEBORAH & JEFFREY DR. DRAIN TILE PROJECT CIP: 7201354 $50,967.21 Oct 30 - 2009 Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: Top Grade 302 N Center Ave Epworth IA. 52045 563 876 - 9811 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 15" RCP, Class III 424 LF $ 37.55 427.00 $ 16,033 85 100.71% 117.84% 100 00% 133.33% 59.20% 58.88% 23.30% 155.75% 37.94% 52.08% 37.01% 100.00% 100.00% 1 2 6" Drain Tile, Non - Perforated 611 LF $ 4.66 720.00 $ 3,355 20 3 Tap Existing Intake 1 EA $ 400.00 1.00 $ 400 00 4 Intake 101 -B 3 EA $ 1,500.00 4.00 $ 6,000 00 5 Bedding Stone, 1" Clean 195 Ton $ 8.60 115.44 $ 992 78 6 Ball, Limestone 575 Ton $ 1.50 338.54 $ 507.81 7 Graded Stone Base 365 Ton $ 6.65 85.03 $ 565.45 8 PCC Curb & Gutter, Including Removal 400 LF $ 16.00 623 00 $ 9 9 6" PCC Driveway, Including Removal 80 SY $ 51.00 30.35 $ 1,547.85 10 4" PCC Sidewalk, Including Removal 96 SF $ 5.75 50.00 $ 287.50 11 HMA Pavement Remove & Replace 160 Ton $ 65.00 59.22 $ 3,849.30 12 Landscape Restoration 1 LS $ 500 00 1.00 $ 500.00 13 Traffic Control And Project Safety 1 LS $ 400 00 1.00 $ 400.00 CHANGE ORDER Payment Totals $ 44,407.74 Dubuque, Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. City Manager APPROVED: Michael Van Millige Gus Psihoyos, City Engineer Dubuque, Iowa Total Contract Work Performed to Date: Total Change Order Work Performed to Date: Total Contract and Change Order Work Performed to Date: $ 44,407.74 Miscellaneous Costs Engineering PROJECT CLOSE OUT FORM APPROVED: BY: TOTAL FINAL PROJECT COSTS: $ 48,407.74 The Undersigned - 1 - 00 GR' X C leC - contractor for the above improvement, does hereby accept the above 'Total Due Contractor", as full settlement for all claims for said improvement. $ 44,407.74 4.000.00