TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Deborah & Jeffrey Drive Drain Tile Project
DATE: February 23, 2010
Dubuque
kilkitl
Al4mudaglf
t r
2007
City Engineer Gus Psihoyos is recommending acceptance of the construction contract
for the Deborah and Jeffrey Drive Drain Tile Project, as completed by Top Grade
Excavating, Inc., in the final contract amount of $44,407.74, which is a 14.8% decrease
from the original contract amount of $50,967.21. The cost of the project was less than
anticipated because the contractor was able to limit the size of the excavation required
to install the storm sewer and drain tile.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
`
Michhl C. Van Milligen
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Mana r
FROM: Gus Psihoyos, City Engineer
DATE: February 18, 2010
SUBJECT: Deborah & Jeffrey Drive Drain Tile Project
CIP 7201354
INTRODUCTION
BACKGROUND
DISCUSSION
RECOMMENDATION
Dubuque
kernil
AI- Anerlca City
2007
The enclosed resolution provides for the acceptance of the construction contract for the
Deborah & Jeffrey Drive Drain Tile Project.
The Deborah & Jeffrey Drive Drain Tile Project involved the extension of approximately
425 feet of storm sewer, the installation of approximately 610 feet of drain tile and three
storm sewer intakes in the Deborah and Jeffrey Drive corridor.
The project was awarded based on a competitive quotation process for public
improvements in accordance with Iowa Code, Section 26.14.
The 2009 Intake Reconstruction Project was completed by Top Grade Excavating, Inc.
of Epworth, Iowa, in the final contract amount of $44,407.74, which is a 14.8% decrease
from the original contract amount of $50,967.21. The cost of the project was less than
anticipated because the contractor was able to limit the size of the excavation required
to install the storm sewer and drain tile.
I recommend that the City Council accept the improvements and authorize the payment
of the contract amount of $44,407.74 to Top Grade Excavating, Inc. for the Deborah &
Jeffrey Drive Drain Tile Project.
BUDGET IMPACT
The total cost for the Deborah & Jeffrey Drive Drain Tile Project is as follows:
Award Final
Construction Contract $50,967.21 $44,407.74
Contingency 5,905.25
Engineering 9,743.66 4,000.00
Total Project Cost $66,616.12 $48,807.74
The project was funded through the Drain Tile Program (CIP #7201354).
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution to accept the
improvements and to authorize the payment of the contract amount of $44,407.74 to
Top Grade Excavating, Inc. for the Deborah & Jeffrey Drive Drain Tile Project.
cc: Jenny Larson, Budget Director
Deron Muehring, Civil Engineer II
Chuck Gau, Engineering Technician
ACCEPTING THE DEBORAH & JEFFREY DRIVE DRAIN TILE PROJECT AND
AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE
CONTRACTOR
Whereas, the Public Improvement Contract for the Deborah & Jeffrey Drive Drain
Tile Project (the Project) has been completed and the City Engineer has examined the
work and filed a certificate stating that the Project has been completed according to the
terms of the Public Improvement Contract and that the City Engineer recommends that
the Project be accepted; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
the Drain Tile Program appropriation for the contract amount of $44,407.74 Tess any
retained percentage provided for therein as provided in Iowa Code chapter 573, and to
pay such retainage only in accordance with the provisions of Iowa Code chapter 573.
Passed, approved and adopted this 1 day of March j 010.
Atte
—1//_ _ --
anne F. Schneider, CMC, City Clerk
RESOLUTION NO. 57 -10
Roy D. Buol, Mayor
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE DEBORAH &
JEFFREY DRIVE DRAIN TILE PROJECT
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the Deborah & Jeffrey Drive Drain Tile Project, that the Project has
been performed in compliance with the terms of the Public Improvement Contract, and
that the total cost of the completed work is $48,407.74.
Dated this Ai day of Cemotav , 2010.
Filed in the office of the City Clerk on thi'day
City Engineer
eanne F. Schneider, CMC, City Clerk
Project Name:
CIP Number:
Project Contract Amount:
Project Completion Date:
DEBORAH & JEFFREY DR.
DRAIN TILE PROJECT
CIP: 7201354
$50,967.21
Oct 30 - 2009
Contractor Name:
Contractor Address:
City, State, Zip:
Contractor Telephone:
Top Grade
302 N Center Ave
Epworth IA. 52045
563 876 - 9811
ITEM
NO.
CONTRACT ITEM
DESCRIPTION
CONTRACT ITEM
QUANTITY UNIT UNIT PRICE
PROJECT TOTAL
QUANTITY TOTAL
PERCENT
COMPLETE
15" RCP, Class III
424 LF $ 37.55
427.00 $ 16,033 85
100.71%
117.84%
100 00%
133.33%
59.20%
58.88%
23.30%
155.75%
37.94%
52.08%
37.01%
100.00%
100.00%
1
2
6" Drain Tile, Non - Perforated
611 LF $ 4.66
720.00 $ 3,355 20
3
Tap Existing Intake
1 EA $ 400.00
1.00 $ 400 00
4
Intake 101 -B
3 EA $ 1,500.00
4.00 $ 6,000 00
5
Bedding Stone, 1" Clean
195 Ton $ 8.60
115.44 $ 992 78
6
Ball, Limestone
575 Ton $ 1.50
338.54 $ 507.81
7
Graded Stone Base
365 Ton $ 6.65
85.03 $ 565.45
8
PCC Curb & Gutter, Including Removal
400 LF $ 16.00
623 00 $ 9
9
6" PCC Driveway, Including Removal
80 SY $ 51.00
30.35 $ 1,547.85
10
4" PCC Sidewalk, Including Removal
96 SF $ 5.75
50.00 $ 287.50
11
HMA Pavement Remove & Replace
160 Ton $ 65.00
59.22 $ 3,849.30
12
Landscape Restoration
1 LS $ 500 00
1.00 $ 500.00
13
Traffic Control And Project Safety
1 LS $ 400 00
1.00 $ 400.00
CHANGE ORDER
Payment Totals $ 44,407.74
Dubuque,
Masterpiece on the Mississippi
City of Dubuque
Engineering
50. W. 13th Street
Dubuque, IA 52001
(563) 589 -4270
I hereby certify that the above statement shows, in detail, the correct
amount of all work required to complete the above improvement.
City Manager
APPROVED:
Michael Van Millige
Gus Psihoyos, City Engineer
Dubuque, Iowa
Total Contract Work Performed to Date:
Total Change Order Work Performed to Date:
Total Contract and Change Order Work Performed to Date: $ 44,407.74
Miscellaneous Costs
Engineering
PROJECT CLOSE OUT FORM
APPROVED:
BY:
TOTAL FINAL PROJECT COSTS: $ 48,407.74
The Undersigned - 1 - 00 GR' X C leC - contractor for the above
improvement, does hereby accept the above 'Total Due Contractor", as
full settlement for all claims for said improvement.
$ 44,407.74
4.000.00