Rejecting Bids for the Fire Station No. 6 External Stairwell Addition Project Copyrighted October 7, 2019 City of Dubuque Consent Items # 15. ITEM TITLE: Rejecting Bids forthe Fire Station No. 6 External Stairwell Addition Project SUM MARY: City Manager recommending rejection of the bids for the Fire Station 6 External Stairwell, so the City Fire Department and Engineering staff can value engineer the design and create alternatives that produce cost saving measures. RESOLUTION Rejecting competitive bid proposals received for the Fire Station 6 External StairwayAddition Project SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Adopt Resolution(s) ATTACHMENTS: Description Type Fire Station 6 External Stairwell Additional Project City Manager Memo Rejection of Bids-MVM Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY OF � uI�AaMca cih DuB E � � I � � I Maste iece on the Mississi i Zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Fire Station 6 External Stairwell Addition Project — Rejection of Bids C I P 350-2706 DATE: October 1, 2019 Three bids were received on September 10, 2019, for the Fire Station 6 External Stairwell Addition Project. All three bids were substantially over the estimated construction cost. Project Manager Steve Sampson Brown recommends the City Council reject the bids for the Fire Station 6 External Stairwell so the City Fire Department and Engineering staff can value engineer the design and create alternatives that produce cost saving measures. It is anticipated that the project will be rebid later this year after incorporating value engineered alternatives that will deliver the project on budget. I concur with the recommendation and respectfully request Mayor and City Council approval. � Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Steve Sampson Brown, Project Manager Rick Steines, Fire Chief Dubuque THE CITY C�F � ABI•A�er�Cin DUB E �� ' l� � �w MIZSt�?� ZCC� UYl t12� MtSSiSSi i zoo��2oi2�2oi3 � �� 2017*2019 TO: Michael C. Van Milligen - City Manager FROM: Steve Sampson Brown — Project Manager f —��`` SUBJECT: Fire Station 6 External Stairwell Addition Project— Rejection of Bids CIP 350-2706 DATE: September 30, 2019 INTRODUCTION The enclosed resolution is in reference to the rejection of bid proposals received for the Fire Station 6 External Stairwell Addition Project. BACKGROUND Fire Station 6 is a three story structure that comprises of an apparatus truck bay and kitchen on the ground floor, living quarters and office space on the second floor, and a restricted height basement. The only access between the ground floor and the second floor is a wooden internal staircase that is original to the building which itself was built in 1906. The original staircase has begun to separate at the second floor level and is becoming structurally unstable. In 2017 the Fire Deparkmen# rontracted with IIW Enginee�s, Architects, Surveyors P.C. of Dubuque, IA (IIW) to conduct a facility needs assessment for Fire Station 6. The results of that assessment were completed in 2018 which indicated the internal stairwell was in need of replacement. Based on the results of the assessment IIW was hired to design the replacement of the staircase. After consideration of several alternatives and the current and future needs of the fire station, a design option was selected to remove the internal staircase and replace it with an enclosed set of external stairs on northeast side of the station. This alternative has several benefits: • By removing the internal staircase, critically needed additional equipment storage space is created. • The current hose drying tower which can only be �ccessed via the kitchen area will be relocated to the new external stair tower. • Direct access to the basement from the exterior of the building will be created. DISCUSSION Three Bids were received on September 10, 2019, for the Fire Station 6 External Stairwell Additian Project. Portzeri Canstruction Inc., Klauer Construcfiior� Company, and Tricon Construction Group each submitted a bid. All three bids were substantially over the estimated construction cost. Page 1 of 2 i he iow bid submitted by Kiau�r Cc�nstruetion Company, ii� �he amc,unt af�2'9,530.00 tivas 37% over the architect's estimate of$203,900. City Fire Department and Engineering staff will value engineer the design and create alternatives that produce cost saving measures. It is anticipated that the project will be rebid later this year after incorporating value engineered alternatives that will deliver the project on budget. RECOMMENDATION I recommend that the City Council reject the bids received for the Fire Station 6 External Stairwell Addition Project. ACTION TO BE TAKEN The City Council is requested to reject the bids for the Fire Station 6 External Stairwell Addition Project through adoption of the attached resolution. SSB\kb cc: Jenny Larson, Director of Finance & Budget Gus Psihoyos — City Engineer Rick Steines — Fire Chief F:\PROJECTS\Fire Station No.6-Existing Building Evaluation-Stair Tower\City Council Documentation\5_Rejection of Bids Page 2 of 2 RESOLUTION NO. 348-19 REJECTING COMPETITIVE BID PROPOSALS RECEIVED FOR THE FIRE STATION 6 EXTERNAL STAIRWAY ADDITION PROJECT Whereas, three (3) competitive sealed bid proposal was submitted by three (3) contractors for the Fire Station 6 External Stairwell Addition Project (the Project) pursuant to Resolution No. 300-19 and a Notice to Bidders published the City of Dubuque Website www.cityofdubuque.orq/bids, Master Builders of Iowa Plan Room mbiplanroom-dsm(c�mbionline.com and posted to the Master Builders Construction Update Network on the 23rd day of August, 2019; and Whereas, the three (3) competitive sealed bid proposal were opened and read on the 10th day of September 2019; and Whereas, the City Council has deemed it advisable to reject the three (3) competitive sealed bid proposals for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The three (3) competitive sealed bid proposals for the Fire Station 6 External Stairwell Addition Project are hereby rejected. Section 2. The City Clerk is authorized and instructed to return the bid deposit of the unsuccessful bidders for the Fire Station 6 External Stairwell Addition Project. Passed, approved and adopted this 7th day of October 2019. 4-6k. A. Rios, Mayor Pro Tem Attest: Keri S. Firnstahl, CMC, City Clerk