Loading...
Catch Basin Replacement Project 2008_AcceptanceMasterpiece on the Mississippi TO: FROM: SUBJECT: DATE: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager 2008 Catch Basin Replacement Project CIPs 7201081 and 3501041 March 8, 2010 City Engineer Gus Psihoyos is recommending acceptance of the 2008 Catch Basin Replacement Project, as completed by McDermott Excavating, in the final contract amount of $92,994, which is a $26,252 (39.4 %) increase from the original contract amount of $66,692. The replacement of seven additional intakes around the Locust Street Parking Ramp was added to the project at a cost of $25,845, which is the majority of the cost increase. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Mic ael C. Van Milligen Dubuque hail AlWlmedca City I HI I 2007 Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Man ag FROM: Gus Psihoyos, City Engineer DATE: March 5, 2010 SUBJECT: 2008 Catch Basin Replacement Project CIPs 7201081 and 3501041 INTRODUCTION Dubuque Al- AmedcaCity i r 2007 The enclosed resolution provides for the acceptance of the construction contract for the 2008 Catch Basin Replacement Project. BACKGROUND The 2008 Catch Basin Replacement Project involved the replacement of 22 catch basins that are located on streets that were resurfaced as part of the 2008 Public Works Asphalt Overlay Program. The project was awarded based on a competitive quotation process for public improvements in accordance with Iowa Code, Section 26.14. DISCUSSION The 2008 Catch Basin Replacement Project was completed by McDermott Excavating of Dubuque, Iowa, of Dubuque, Iowa, in the final contract amount of $92,994.00, which is a $26,252.00 (or 39.4 %) increase from the original contract amount of $66,692.00. The replacement of seven additional intakes around the Locust Street Parking Ramp was added to the project at a cost of $25.845.00 which is the majority of the cost increase. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $92,994.00 to McDermott Excavating for the 2008 Catch Basin Replacement Project. BUDGET IMPACT The total cost for the 2008 Catch Basin Replacement Project is as follows: Construction Contract Contingency Miscellaneous Costs Engineering Total Project Cost The project funding summary is as follows: CIP No. 7201081 3501041 ACTION TO BE TAKEN Fund Description Catch Basin/Westside Storage Curb /Catch Basin Replacement Total Project Funding The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $92,994.00 to McDermott Excavating for the 2008 Catch Basin Replacement Project. cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer II Award $ 66,692.00 6,669.20 7,336.12 $ 80,697.32 Final $92,994.00 0 343.90 2,113.65 $95,451.55 Fund Amount $69,606.55 25,845.00 $95,451.55 RESOLUTION NO. 77-10 ACCEPTING THE 2008 CATCH BASIN REPLACEMENT PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 2008 Catch Basin Replacement Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Catch Basin Maintenance, Catch Basin/Westside Storage, and Curb /Catch Basin Replacement appropriations for the contract amount of $92,994.00 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 15th day of March 2010. Attest: anne F. Schneider, CMC, City Clerk Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2008 CATCH BASIN REPLACEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2008 Catch Basin Replacement Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $95,451.55. Dated this 10th day of March, 2010. Filed in the office of the City Clerk on the 10th day of March, 2010 City Engineer 2010. Jeanne F. Schneider, CMC, City Clerk Project Name: CIP Number: Project Contract Amount: Project Completion Date: INTAKE REPLACEMENT PROJECT 7201066 $66,692.00 22 Jul - 09 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE Iowa @ 10th Street - Intake 101 -B, NW Corner 1 LS $ 2,625.00 1 $ 2,625.00 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 1 2 Iowa @ 10th Street - Intake 101 -B, NE Corner 1 LS $ 2,700.00 1 $ 2,700.00 3 Iowa @ 12th Street - Intake 101 -B Special, NW Corner 1 LS $ 3,173.00 1 $ 3,173.00 4 Iowa @ 13th Street - Intake 101 -B Special, NW Corner 1 LS $ 3,173.00 1 $ 3,173.00 5 10th @ Main Street - Intake 101 -B Special, NW Corner 1 LS $ 3,173.00 1 $ 3,173.00 6 10th @ Central Avenue - Intake 101 -B Special, SW Corner 1 LS $ 3,048.00 1 $ 3,048.00 7 12th @ Main Street - Intake 101 -B Special, SW Corner 1 LS $ 3,383.00 1 $ 3,383.00 8 12th @ Main Street - Intake 101 -B Special, NW Corner 1 LS $ 3,258.00 1 $ 3,258.00 9 3rd Street @ Parkway - Intake 101 -B, North Side 1 LS $ 2,575.00 1 $ 2,575.00 10 3rd Street @ Parkway - Intake 101 -B Special, South Side 1 LS $ 3,269.00 1 $ 3,269.00 11 Kane Street (Across From 1100) - Intake 101 -B 1 LS $ 2,785.00 1 $ 2,785.00 12 Kane Street (In Front Of 1100) - Intake 101 -B Special 1 LS $ 3,098.00 1 $ 3,098.00 13 Kane Street (West End of Wahlert) - Intake 104 -B Special 1 LS $ 4,169.00 1 $ 4,169.00 14 1150 Edina Street - Intake 101 -B 1 LS $ 2,863.00 1 $ 2,863.00 15 1161 Edina Street - Intake 101 -B 1 LS $ 2,700.00 1 $ 2,700.00 16 1111 Vernon Street - Intake 101 -B 1 LS $ 2,625.00 1 $ 2,625.00 17 1150 Vernon Street - Intake 101 -B 1 LS $ 2,575.00 1 $ 2,575.00 18 1207 Washington St. (Across The Street) - Intake 101 -B Specia 1 LS $ 3,258.00 1 $ 3,258.00 19 1502 Washington St. - Intake 101 -B Special 1 LS $ 2,942.00 1 $ 2,942.00 20 1598 Washington St. - Intake 101 -B Special 1 LS $ 3,258.00 1 $ 3,258.00 21 1608 Washington St. - Intake 101 -B Special 1 LS $ 2,942.00 1 $ 2,942.00 22 Cox Street @ Graber Center - Intake 101 -B Special 1 LS $ 3,100.00 1 $ 3,100.00 CHANGE ORDER 1 Repair Storm Pipe at Johnson & Lincoln 1 LS $ 457.00 1.00 $ 457.00 2 Additional Intakes @ Locust St Ramp (7) 1 LS $25,845.00 1.00 $ 25,845.00 Payment Totals $ 92,994.00 anager APPROVED: Michael Van illigen, C Dubuque, Iowa City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 I hereby certify that the above statement shows, in detail, the correct amount of all work requ' - to complete the above improvement. Gus Psihoyos, City Engineer Dubuque, Iowa PROJECT CLOSE OUT FORM Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: McDermott Excavating 14407 Highway 20 West Dubuque, Iowa 52003 -9709 563 -583 -4633 Total Contract Work Performed to Date: Total Change Order Work Performed to Date: Total Contract and Change Order Work Performed to Date: Miscellaneous Costs Engineering APPROVED: BY: 66,692.00 26,302.00 92,994.00 343.90 2,113.65 TOTAL FINAL PROJECT COSTS: $ 95,451.55 The Undersigned, n461ltdt akatieg2l for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement.