2007
SUBJECT: Utility Relocation Project - 9th to 10th Street: Sanitary Sewer, 20 -Inch
Transmission Watermain, and Fiber Optic Conduit
Sealed bids were received for the Utility Relocation Project — 9 to 10 Street: Sanitary
Sewer, 20 -Inch Transmission Watermain, and Fiber Optic Conduit. City Engineer Gus
Psihoyos recommends award of the contract to the low bidder, Top Grade Excavating,
Inc., in the amount of $710,860.87, which is 2.10% under the estimate of probable cost.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
Bob Green, Water Department Manager r;
DATE: March 10, 2010
Dubuque
Al- America City
2007
SUBJECT: Utility Relocation Project — 9 to 10 Street: Sanitary Sewer, 20 -Inch
Transmission Watermain, and Fiber Optic Conduit
INTRODUCTION
The enclosed resolution authorizes the award of the construction contract for the Utility
Relocation Project — 9 to 10 Street: Sanitary Sewer, 20 -Inch Transmission
Watermain, and Fiber Optic Conduit.
BACKGROUND
The project involves the replacement and relocation of the following utilities: 8 -inch
sanitary sewer; 20 -inch transmission watermain; network fiber; and traffic fiber that are
currently located within the alley between Central Avenue and Iowa Street that runs
from 9 to 10 Street. These utilities will be replaced and relocated to 9 and 10
Streets and to the west side of the Central Avenue.
On February 15, 2010, the City Council authorized initiation of the public bidding
process and set a public hearing for March 1, 2010 to consider approval of the plans
and specifications, form of contract and estimated cost.
At the March 1, 2010 public hearing, through the adoption of a resolution, the City
Council approved the plans, specifications, form of contract, and estimated cost for the
Utility Relocation Project — 9 to 10 Street project.
DISCUSSION
Multiple addendums were issued during the bidding process to clarify the elements of
the project and to add value to the project. Changes to the scope of the project include
adding water and sanitary sewer service for the parking facility, adding additional fiber
conduit on Iowa Street, and increasing the pavement protection /replacement standards
for 9 1 0 th and Central Avenue. Based on these changes, the revised project cost
estimate is $936,672.40 up from $821,422.50.
Because the construction contractor must wait until the bid is awarded before ordering
materials, the City pre- ordered and purchased the 20 -inch diameter water main
materials. This ensures that material delivery will not delay completion of the utility
relocation project.
BID RESULTS
Sealed bids were received on March 9, 2010. Top Grade
Iowa, submitted the low bid in the amount of $710,860.87.
the revised estimate of probable cost. A summary of the
follows:
Top Grade Excavating, Inc.
Connolly Construction
RECOMMENDATION
I recommend that the contract be awarded to Top Grade Excavating, Inc. in the amount
of $710,860.87.
BUDGET IMPACT
The revised estimate of probable costs for the Utility Relocation Project
Street: Sanitary Sewer, 20 -Inch Transmission Watermain, and Fiber Optic
follows:
Revised Estimate
Construction Contract $726,082.50
Water Main Materials* 46,305.40
Contingency 65,713.80
Construction Engineering & Inspection 98,570.70
Total Project Cost $936,672.40
*The large- diameter water main materials were purchased by the City directly from the supplier
availability.
The funding summary is as follows:
CIP No.
7201066
3001615
3001266
3501608
7402261
Contractor Name
Fund Description
Sanitary Sewer Construction Funds
General Storm Sewer Repairs
Traffic Conduit & Foundations
Fiber Optic Conduit & Structures
Street Lighting
Water Funds
Total Project Funding
Excavating, Inc. of Epworth,
This amount is 2.10% under
bid proposals received is as
Total Bid
$ 710,860.87
$1,046,361.30
— 9th to 10
Conduit is as
Bid
$710,860.87
46, 305.40
65,713.80
98,570.70
$921,450.77
to ensure its
Fund Amount
$286,993.41
18,886.58
72,309.25
80,404.50
46,168.94
416,688.09
$921,450.77
The sanitary sewer relocation will be funded with savings from the Asbury Plaza Area
Wastewater Pumping Facilities Project in the amount of $307,350.80.
ACTION TO BE TAKEN
I recommend that the City Council adopt the attached resolution awarding the Utility
Relocation Project — 9 to 10 Street: Sanitary Sewer, 20 -Inch Transmission
Watermain, and Fiber Optic Conduit to Top Grade Excavating, Inc. in the amount of
$710,860.87.
Prepared by Deron Muehring, Civil Engineer II
cc: Jenny Larson, Budget Director
Don Vogt, Public Works Director
John Klostermann, Street Maintenance Supervisor
Bob Green, Water Department Manager
Deron Muehring, Civil Engineer II
Todd Irwin, Engineering Technician
AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE UTILITY RELOCATION
PROJECT - 9 TO 10 STREET: SANITARY SEWER, 20 -INCH TRANSMISSION
WATERMAIN, AND FIBER OPTIC CONDUIT
Whereas, sealed proposals have been submitted by contractors for the Utility
Relocation Project - 9 to 10 Street: Sanitary Sewer, 20 -Inch Transmission
Watermain, and Fiber Optic Conduit (the Project) pursuant to Resolution No. 53 -10 and
Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on
the 19 day of February, 2010.
Whereas, said sealed proposals were opened and read on the 9 day of March,
2010 and it has been determined that Top Grade Excavating, Inc., with a bid in the
amount of $710,860.87, is the lowest responsive, responsible bidder for the Project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That a Public Improvement Contract for the Project is hereby awarded to Top
Grade Excavating, Inc. and the City Manager is hereby directed to execute a Public
Improvement Contract on behalf of the City of Dubuque for the Project.
Passed, approved and adopted this 15th day of March 2010.
Attest:
eanne F. Schneider, CMC, City Clerk
RESOLUTION NO. 88 -10
Roy D. Buol, Mayor
NO.
DESCRIPTION
QUANTITY
Engineer's Estimate
UNIT TOTAL
PRICE PRICE
Top Grade Excavating
UNIT TOTAL
PRICE PRICE
Connolly Construction
UNIT TOTAL
PRICE PRICE
UNIT
PRICE
TOTAL
PRICE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
MISCELLANEOUS
Mobilization
Traffic and Safety Control Phase I - Inc. Daily Inspection
Traffic and Safety Control Phase II - Inc. Daily Inspection
Pavement Markings
EROSION AND SEDIMENTATION CONTROL
12" Fitter Sock at Inlets
Pavement Surface Clean Up During Construction
DEMOLITION
Traffic Sign, Remove, Salvage & Replace
Way Finding Sign, Remove, Salvage & Replace
Remove Existing Street Light & Base, or Ped. Pole and Base
Full Depth Pavement Sawing
Remove Existing PCC Curb & Gutter
Remove Existing PCC Pavement (9 ")
Remove Existing ACC Pavement (3.5 ")
Remove and Salvage Brick Pavers
Remove Existing Composit Pavement (3" ACC over 7" PCC)
Remove Existing Drive Apron
Remove Existing Sidewalk
Remove Existing Storm Intake
Remove Existing Storm Sewer Pipe
Remove Existing Sanitary Sewer Manhole
Abandon Existing Sanitary Sewer Pipe (8 ")
Remove Existing Water Main Pipe (20 ")
EXCAVATION & STONE
Trench Stabilization Stone, Inc. Over Excavation
Backfrll, Limestone
3" Crushed Stone Base
Modified Subbase
Graded Stone Base
1
1
1
1
15
8
6
2
6
970
300
725
1150
6255
870
90
825
4
60
3
4
310
200
5100
1500
500
60
LS
LS
LS
LS
EA
EA
EA
EA
EA
LF
LF
SY
SY
SF
SY
SY
SY
EA
LF
EA
CY
LF
Ton
Ton
Ton
Ton
Ton
$ 15,500.00
$ 15,500.00
$34,700.00
$ 34,700.00
$ 81,000.00
$ 81,000.00
$ -
$ 12,800.00
$ 12,800.00
$15,025.00
$ 15,025.00
$ 20,500.00
$ 20 500.00
$ -
$ 1,750.00
$ 1,750.00
$15,025.00
$ 15,025.00
$ 20 500.00
$ 20 500.00
$ -
$ 2,500.00
$ 2,500.00
$1,200.00
$ 1,200.00
$ 1,430.00
$ 1,430.00
$ -
Sub Total
$ 80.00
$ 32,550.00
$ 1,200.00
Sub Total
$70.00
$ 65,950.00
$ 1,050.00
Sub Total
$ 240.00
$ 123,430.00
$ 3,600.00
Sub Total
$ -
$ -
$ 300.00
$ 2,400.00
$200.00
$ 1,600.00
$ 1,784.00
$ 14,272.00
$ -
Sub Total
$ 250.00
$ 3,600.00
$ 1,500.00
Sub Total
$150.00
$ 2,650.00
$ 900.00
Sub Total
$ 501.00
$ 17,872.00
$ 3 006.00
Sub Total
$ -
$ -
$ 350.00
$ 700.00
$300.00
$ 600.00
$ 2,200.00
$ 4,400.00
$ -
$ 300.00
$ 1,800.00
$750.00
$ 4,500.00
$ 957.00
$ 5 742.00
$ -
$ 3.50
$ 3,395.00
$2.25
$ 2,182.50
$ 2.85
$ 2,764.50
$ -
$ 2.00
$ 600.00
$1.00
$ 300.00
$ 6.65
$ 1,995.00
$ -
$ 8.00
$ 5,800.00
$4.97
$ 3,603.25
$ 5.80
$ 4 205.00
$ -
$ 6.00
$ 6,900.00
$2.50
$ 2,875.00
$ 10.70
$ 12,305.00
$ -
$ 5.00
$ 31,275.00
$0.85
$ 5,316.75
$ 3.15
$ 19 703.25
$ -
$ 10.00
$ 8,700.00
$5.50
$ 4,785.00
$ 17.10
$ 14,877.00
$ -
$ 10.00
$ 900.00
$2.50
$ 225.00
$ 6.40
$ 576.00
$ -
$ 8.00
$ 6,600.00
$1.50
$ 1,237.50
$ 5.80
$ 4 785.00
$ -
$ 275.00
$ 1,100.00
$250.00
$ 1,000.00
$ 480.00
$ 1,920.00
$ -
$ 5.00
$ 300.00
$2.50
$ 150.00
$ 26.80
$ 1 608.00
$ -
$ 250.00
J 750.00
$350.00
$ 1,050.00
$ 560.00
$ 1,680.00
$ -
$ 125.00
$ 500.00
$95.00
$ 380.00
$ 790.00
$ 3160.00
$ -
$ 15.00
$ 4,650.00
$11.61
$ 3,599.10
$ 59.35
$ 18,398.50
$ -
Sub Total
$ 75,470.00
Sub Total
$6.50
$ 32,704.10
$ 1,300.00
Sub Total
$ 16.30
$ 101,125.25
$ 3,260.00
Sub Total
$ -
$ -
$ 14.00
$ 2,800.00
$ 6.00
$ 30,600.00
$2.50
$ 12,750.00
$ 5.58
$ 28,458.00
$ -
$ 10.75
$ 16,125.00
$14.17
$ 21,255.00
$ 16.35
$ 24 525.00
$ -
$ 10.75
$ 5,375.00
$14.17
$ 7,085.00
$ 17.20
$ 8,600.00
$ -
$ 12.00
$ 720.00
$14.17
$ 850.20
$ 16.35
$ 981.00
$ -
Sub Total
$ 55,620.00
Sub Total
$ 43,240.20
Sub Total
$ 65,824.00
Sub Total
$ -
Masterpiece on the Mississippi
BID TABULATION FORM
Project Name:
Project Completion Date:
Utility Relocation Project 9th to 10th Street; Sanitary
Sewer, 20" Transmission Water Main, and Fiber Optic
Conduit
23 -Apr -10
NO.
DESCRIPTION
QUANTITY
Engineer's Estimate
UNIT TOTAL
PRICE PRICE
Top Grade Excavating
UNIT TOTAL
PRICE PRICE
Connolly Construction
UNIT TOTAL
PRICE PRICE
UNIT
PRICE
TOTAL
PRICE
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
STORM SEWER SEWER
Storm Sewer Intake -101B
Storm Sewer Pipe - 12" DIP
Storm Sewer Pipe - 12" DIP Stub with temp cap
Connect New DIP Pipe to Existing 12" Storm Sewer
SANITARY SEWER
Bypass Pumping
Connect to Existing 8" Sanitary Sewer
Connect to Existing 10" Sanitary Sewer
48" Diameter Manhole Base, Inc Bedding
48" Diameter Manhole Sidewall
Construct OutsideDrop(8 ")
Manhole Frame & Cover
8" DIP Inc. Bedding and Wrap class 51
10" DIP Inc. Bedding and Wrap class 51
4" DIP Inc. Bedding and Wrap (Lateral for Future Ramp)
6" DIP Inc. Bedding and Wrap (Lateral for Fire Station)
4° Clean -out on Run w/ frame and cover (CI)
6" Terminal Clean -out w/ frame and cover (CI)
Sewer Service Connections w/ fittings and coupling or cap
4
95
1
4
1
4
1
4
53
1
4
492
120
30
153
1
1
2
Ea
LF
EA
EA
LS
EA
EA
EA
VF
LS
LS
LF
LF
LF
LF
EA
EA
EA
$ 1,500.00
$ 6,000.00
$2,180.00
$ 8,720.00
$3,075.00
$ 12,300.00
$ -
$ 35.00
$ 3,325.00
$41.68
$ 3,959.60
$62.60
$ 5,947.00
$ -
$ 100.00
$ 100.00
$432.00
$ 432.00
$357.00
$ 357.00
$ -
$ 150.00
$ 600.00
$495.00
$ 1980.00
$315.00
$ 1,260.00
$ -
Sub Total
$ 1,200.00
$ 10,025.00
$ 1,200.00
Sub Total
$675.00
$ 15,091.60
$ 675.00
Sub Total
$16,420.00
$ 19,864.00
$ 16,420.00
Sub Total
$ -
$ -
$ 125.00
$ 500.00
$845.00
$ 3,380.00
$ 428.00
$ 1,712.00
$ -
$ 150.00
$ 150.00
$855.00
$ 855.00
$ 435.00
$ 435.00
$ -
$ 900.00
$ 3,600.00
$1,275.00
$ 5,100.00
$ 525.00
$ 2,100.00
$ -
$ 95.00
$ 5,035.00
$125.00
$ 6,625.00
$ 102.00
$ 5,406.00
$ -
$ 1,150.00
$ 1,150.00
$1,183.00
$ 1,183.00
$ 1230.00
$ 1,230.00
$ -
$ 325.00
$ 1,300.00
$290.00
$ 1,160.00
$ 1,005.00
$ 4,020.00
$ -
$ 36.00
$ 17,712.00
$117.26
$ 57,691.92
$ 66.50
$ 32,718.00
$ -
$ 42.00
$ 5,040.00
$121.16
$ 14,539.20
$ 67.10
$ 8,052.00
$ -
$ 30.00
$ 900.00
$81.09
$ 2,432.70
$ 74.65
$ 2,239.50
$ -
$ 32.00
$ 4,896.00
$76.13
$ 11,647.89
$ 74.80
$ 11,444.40
$ -
$ 320.00
$ 320.00
$1,025.00
$ 1,025.00
$ 1,295.00
$ 1,295.00
$ -
$ 200.00
$ 200.00
$1,025.00
$ 1,025.00
$ 1,385.00
$ 1,385.00
$ -
$ 200.00
$ 400.00
$200.00
$ 400.00
$ 895.00
$ 1,790.00
$ -
Sub Total
$ 42,403.00
Sub Total
$ 107,739.71
Sub Total
$ 90,246.90
Sub Total
$ -
•
NO.
DESCRIPTION
QUANTITY
Engineer's Estimate
UNIT TOTAL
PRICE PRICE
Top Grade Excavating
UNIT TOTAL
PRICE PRICE
Connolly Construction
UNIT TOTAL
PRICE PRICE
UNIT
PRICE
TOTAL
PRICE
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
WATER MAIN
Boring Setup(Under Central Ave.)
20" Bored Steel Casing(0.312" Wall)
Casing Spacers
Ductile Iron Pipe(20 ") class 51 (20" DIP furnished by City)
Ductile Iron Pipe(12') class 52
Ductile Iron Pipe(6 ") class 52
Ductile Iron Pipe(8 ") class 52
Ductile Iron Pipe(4 ") class 52
Valve(20 ") w/Box & Cover (valves furnished by City)
Valve(12") w/Box & Cover
Valve(8 ") w /Box & Cover
Valve(6 ") w /Box & Cover
Valve(4 ") w /Box & Cover
Hydrant(6 ")
6" DIP Hydrant Lead
Fittings
Connect To Existing 4 ", 6" and 8" Water Main
20" Connection w/ Standard Coupling
20" Connection w/ Transition Coupling
20" Mega Lug Retainer Gland or Field Lok MJ
12" Mega Lug Retainer Gland or Field Lok MJ
8" Mega Lug Retainer Gland or Field Lok MJ
6" Mega Lug Retainer Gland or Field Lok MJ
4" Mega Lug Retainer Gland or Field Lok MJ
20" Field Lok 350 Gasket or Sure Stop 350 Gasket
12" Field Lok 350 Gasket or Sure Stop 350 Gasket
8" Field Lok 350 Gasket or Sure Stop 350 Gasket
6" Field Lok 350 Gasket or Sure Stop 350 Gasket
Temporary Flushing Assembly
Copper Tube (2") Type K
Parking Ramp Water Service
PAVEMENT
PC Concrete Pavement, (9 ") w/ Int Curb, Class "C" Doweled
PC Concrete Pavement, (8 ") , Class "C" Doweled
PC Concrete Curb & Gutter (30 ")
HMA 3000k Surface and Binder Course, W (PG 64-28)
Fixture Adjustment
PC Concrete Driveway, 6 ", Construct
PC Concrete Sidewalk, 4 ", Construct
PC Concrete Sidewalk, 6 ", Construct
PC Concrete Access Ramp, Detectable
1
45
6
730
75
70
60
115
7
1
3
6
1
3
35
5900
6
1
2
37
7
14
25
8
40
3
3
2
1
12
1
665
800
550
575
19
585
2025
80
2
EA
LF
EA
LF
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
LF
LBS
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
LS
LF
LS
SY
SY
LF
Ton
BA
SF
SF
SF
EA
$ 1,000.00
$ 1,000.00
$ 9,000.00
$ 300.00
$2,100.00
$ 2,100.00
$ 4,864.00
$ 4,864.00
$ -
$ 200.00
$125.00
$ 5,625.00
$ 152.00
$ 6,840.00
$ -
$ 50.00
$145.00
$ 870.00
$ 245.00
$ 1,470.00
$ -
$ 65.00
$ 47,450.00
$41.75
$ 30,477.50
$ 130.00
$ 94,900.00
$ -
$ 80.00
$ 6,000.00
$63.85
$ 4,788.75
$ 89.00
$ 6,675.00
$ -
$ 50.00
$ 3500.00
$51.60
$ 3,612.00
$ 75.25
$ 5,267.50
$ -
$ 65.00
$ 3,900.00
$55.20
$ 3,312.00
$ 78.65
$ 4 719.00
$ -
$ 50.00
$ 5,750.00
$52.70
$ 6,060.50
$ 73.20
$ 8,418.00
$ -
$ 5,000.00
$ 35,000.00
$763.00
$ 5,341.00
$ 1,065.00
$ 7,455.00
$ -
$ 1,500.00
$ 1,500.00
$1,638.00
$ 1,638.00
$ 1,980.00
$ 1,980.00
$ -
$ 1,000.00
$ 3,000.00
$899.67
$ 2,699.01
$ 1,210.00
$ 3,630.00
$ -
$ 850.00
$ 5,100.00
$638.00
$ 3,828.00
$ 890.00
$ 5,340.00
$ -
$ 700.00
$ 700.00
$633.00
$ 633.00
$ 800.00
$ 800.00
$ -
$ 3,000.00
$ 9,000.00
$2,036.00
$ 6,108.00
$ 2,110.00
$ 6,330.00
$ -
$ 50.00
$ 1,750.00
$40.90
$ 1,431.50
$ 44.85
$ 1,569.75
$ -
$ 7.00
$ 41,300.00
$3.30
$ 19,470.00
$ 4.10
$ 24,190.00
$ -
$ 1,200.00
$ 7,200.00
$410.00
$ 2,460.00
$ 623.00
$ 3,738.00
$ -
$ 4,000.00
$ 4,000.00
$1,900.00
$ 1,900.00
$ 912.00
$ 912.00
$ -
$ 4,000.00
$ 8,000.00
$1,900.00
$ 3,800.00
$ 2,235.00
$ 4,470.00
$ -
$ 120.00
$ 4,440.00
$235.00
$ 8,695.00
$ 415.00
$ 15,355.00
$ -
$ 80.00
$ 560.00
$89.00
$ 623.00
$ 212.00
$ 1,484.00
$ -
$ 65.00
$ 910.00
$50.00
$ 700.00
$ 180.00
$ 2,520.00
$ -
$ 60.00
$ 1,500.00
$40.00
$ 1,000.00
$ 120.00
$ 3,000.00
$ -
$ 60.00
$ 480.00
$35.00
$ 280.00
$ 120.00
$ 960.00
$ -
$ 450.00
$ 18,000.00
$395.00
$ 15,800.00
$ 845.00
$ 33,800.00
$ -
$ 300.00
$ 900.00
$130.00
$ 390.00
$ 392.00
$ 1,176.00
$ -
$ 200.00
$ 600.00
$82.00
$ 246.00
$ 270.00
$ 810.00
$ -
$ 100.00
$ 200.00
$65.00
$ 130.00
$ 210.00
$ 420.00
$ -
$ 1,500.00
$ 1,500.00
$1,500.00
$ 1,500.00
$ 3,645.00
$ 3,645.00
$ -
$ 18.00
$ 216.00
$23.50
$ 282.00
$ 49.00
$ 588.00
$ -
$ 1,500.00
$ 1,500.00
$2,100.00
$ 2,100.00
$ 2,638.00
$ 2,638.00
$ -
Sub Total
$ -
$ 60.00
$ 224,256.00
$ -
$ 39,900.00
Sub Total
$57.00
$ 137,900.26
$ 37,905.00
Sub Total
$ 69.40
$ 259,964.25
$ 46,151.00
Sub Total
$ -
$ -
$ 45.00
$ 36,000.00
$54.00
$ 43,200.00
$ 65.90
$ 52,720.00
$ -
$ 15.00
$ 8,250.00
$22.00
$ 12,100.00
$ 25.95
$ 14,272.50
$ -
$ 85.00
$ 48,875.00
$68.50
$ 39,387.50
$ 80.55
$ 46,316.25
$ -
$ 375.00
$ 7,125.00
$200.00
$ 3,800.00
$ 536.00
$ 10,184.00
$ -
$ 5.50
$ 3,217.50
$5.50
$ 3,217.50
$ 5.90
$ 3,451.50
$ -
$ 5.00
$ 10,125.00
$4.50
$ 9,112.50
$ 5.30
$ 10,732.50
$ -
$ 5.50
$ 440.00
$6.00
$ 480.00
$ 5.90
$ 472.00
$ -
$ 150.00
$ 300.00
$350.00
$ 700.00
$ 355.00
$ 710.00
$ -
Sub Total
$ 154,232.50
Sub Total
$ 149,902.50
Sub Total
$ 185,009.75
Sub Total
$ -
NO.
DESCRIPTION
QUANTITY
Engineer's Estimate
UNIT TOTAL
PRICE PRICE
Top Grade Excavating
UNIT TOTAL
PRICE PRICE
Connolly Construction
UNIT TOTAL
PRICE PRICE
UNIT
PRICE
TOTAL
PRICE
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
FIBER OPTIC CONDUIT & STRUCTURES
Fiber Vault, Square
Fiber Vault, 48" Round
24" Handhole x 3' Deep with Quad Plex
Connect to Existing Fiber Vault
Conduit, Rigid PVC, 4" With 4 -1" Conduits
Trenching for Conduit
Horizontal Boring for Conduit
STREET LIGHTS
Install street light pole foundation (8' -8 ")
Install street light pole foundation (6-8")
Install 30' street light pole
Connect to Existing Structure (IEHH)
Conduit, Rigid PVC, 2"
TRAFFIC CONDUIT & FOUNDATIONS
Traffic Signal Control Cabinet Foundation
Precast Rectangular Handhole w/ R6689 Lid Stating "TRAFFIC SIGNALS"
24" Round Handhole
Countdown Pedestrian Signal Head, pole mount (inc. Install)
Conduit, Rigid PVC, 2"
Conduit, Rigid PVC, 4"
Tesco Foundation
Fiber Hub Foundation
Install Street Light Foundation (12' -0")
4 EA
1 EA
1 EA
9 EA
1617 LF
1100 LF
987 LF
1 EA
5 EA
5 EA
10 EA
438 LF
3 EA
3 EA
16 EA
2 EA
2334 LF
556 LF
1 EA
1 EA
1 EA
$ 2,800.00
$ 11,200.00
$2,464.75
$ 9,859.00
$ 2,705.00
$ 10,820.00
$ -
$ 3,400.00
$ 3,400.00
$2,736.75
$ 2,736.75
$ 3,005.00
$ 3,005.00
$ -
$ 800.00
$ 800.00
$1 129.50
$ 1,129.50
$ 1,080.00
$ 1,080.00
$ -
$ 650.00
$ 5,850.00
$172.00
$ 1,548.00
$ 205.00
$ 1,845.00
$ -
$ 16.00
$ 25,872.00
$12.65
$ 20,455.05
$ 15.05
$ 24,335.85
$ -
$ 2.50
$ 2,750.00
$7.50
$ 8,250.00
$ 15.75
$ 17,325.00
$ -
$ 8.00
$ 7,896.00
$22.00
$ 21,714.00
$ 29.40
$ 29,017.80
$ -
Sub Total
$ 850.00
$ 57,768.00
$ 850.00
Sub Total
$2,398.00
$ 65,692.30
$ 2,398.00
Sub Total
$ 1,885.00
$ 87,428.65
$ 1,885.00
Sub Total
$ -
$ -
$ 600.00
$ 3,000.00
$1,965.00
$ 9,825.00
$ 1,705.00
$ 8,525.00
$ -
$ 3,500.00
$ 17,500.00
$2,538.00
$ 12,690.00
$ 3,105.00
$ 15,525.00
$ -
$ 650.00
$ 6,500.00
$172.00
$ 1,720.00
$ 205.00
$ 2,050.00
$ -
$ 5.00
$ 2,190.00
$8.20
$ 3,591.60
$ 9.55
$ 4,182.90
$ -
Sub Total
$ 1,800.00
$ 30,040.00
$ 5,400.00
Sub Total
$2,125.00
$ 30,224.60
$ 6,375.00
Sub Total
$ 1,835.00
$ 32,167.90
$ 5,505.00
Sub Total
$ -
$ -
$ 1,400.00
$ 4,200.00
$1,650.00
$ 4,950.00
$ 1 892.00
$ 5,676.00
$ -
$ 600.00
$ 9,600.00
$1,300.00
$ 20,800.00
$ 1,445.00
$ 23,120.00
$ -
$ 800.00
$ 1,600.00
$1,958.50
$ 3,917.00
$ 2,275.00
$ 4,550.00
$ -
$ 5.00
$ 11,670.00
$4.85
$ 11,319.90
$ 5.70
$ 13,303.80
$ -
$ 8.00
$ 4,448.00
$9.45
$ 5,254.20
$ 11.05
$ 6,143.80
$ -
$ 800.00
$ 800.00
$1,673.00
$ 1,673.00
$ 1,605.00
$ 1,605.00
$ -
$ 1,200.00
$ 1,200.00
$2,073.00
$ 2,073.00
$ 1,630.00
$ 1,630.00
$ -
$ 1,200.00
$ 1,200.00
$3,403.50
$ 3,403.50
$ 1,895.00
$ 1,895.00
$ -
Sub Total
Total Est.
$ 40,118.00
$ 726,082.50
Sub Total
Total Bid
$ 59,765.60
$ 710,860.87
Sub Total
Total Bid
$ 63,428.60
$ 1,046,361.30
Sub Total
Total Bid
$ -
$ -
- 2.10%
44.11%
- 100.00%
% Over / Under ( -)
March 9, 2010
Gus Psihoyos
City of Dubuque
50 West 13 Street
Dubuque, IA 52001
Re: City of Dubuque
Utility Relocation Project 9th To 10th Street
Sanitary Sewer, 20 -Inch Transmission Watermain, & Fiber Optic Conduit
Award Recommendation
IIW Project No.: 09211 -02
Dear Gus:
In accordance with City instructions, bids for the above referenced project were opened and
read at 10 :00 a.m. on March 9, 2010. Two (2) bids were received for this project. A
tabulation of the bids is enclosed.
After reviewing the bids, it was determined the low bid was submitted by Top Grade
Excavating, Inc. of Epworth, Iowa, in the amount of $710,860.87.
Top Grade Excavating, inc. has the experience, workforce and equipment to properly
complete this contract. We recommend award of the Utility Relocation Project to Top
Grade Excavating, Inc. in the amount of $710,860.87.
The engineer's estimate for this project was $726,082.50. The low bid of $710,860.87 is
$15,221.63 or 2% below the engineer's estimate.
Sincerely,
IIW ENGINEERS & SURVEYORS, P.C.
Gary Sejkora, P.E.
Enclosure
Copy: Bob Green, Water Dept. Manager w /enclosure
Top Grade w /enclosure
I I W E n g i n e e r s & Surveyors, P . C .
Dubuque, IA Hazel Green, WI
INTEGRITY. EXPERTISE. SOLUTIONS.
Dennis F. Waugh, PE/SE
Charles A. Cate, PE
Gary D. Sejkora, PE
Michael A. Jansen, PE/SE
Ronald A. Balmer. PE/SE
John M. Tranmer, PLS
Timothy J. Trancl, PE
John F. Wandsnider, PE
Julie P. Ncebcl, PE
James P. Kaunc, PE
Thomas J. Oster, PLS
Wray A. Childers, PLS
Geoffry T. Blundin, PE
Mark C. Jobgen, PE
Lauren N. Ray, PE/SE
Bradley J. Mootz, PE/SE
Cody T. Austin, PE
Marc D. Ruden, PE
Civil Engineering
Structural Engineering
Environmental Engineering
Municipal Engineering
Transportation Engineering
Architectural Engineering
Land Surveying
Construction Services
4155 Pennsylvania Avenue
Dubuque, Iowa 52002 -2628
563 -556 -2464
563-556-7811 fax
www.iiwengr_com