Utility Relocation Project_9th to 10th StreetsMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager DATE: March 10, 2010 MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Bob Green, Water Department Manager Mic ael C. Van Milligen Dubuque bfrd AN- AmdicaCity 2007 SUBJECT: Utility Relocation Project - 9th to 10th Street: Sanitary Sewer, 20 -Inch Transmission Watermain, and Fiber Optic Conduit Sealed bids were received for the Utility Relocation Project — 9 to 10 Street: Sanitary Sewer, 20 -Inch Transmission Watermain, and Fiber Optic Conduit. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, Top Grade Excavating, Inc., in the amount of $710,860.87, which is 2.10% under the estimate of probable cost. I concur with the recommendation and respectfully request Mayor and City Council approval. Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer Bob Green, Water Department Manager r; DATE: March 10, 2010 Dubuque Al- America City 2007 SUBJECT: Utility Relocation Project — 9 to 10 Street: Sanitary Sewer, 20 -Inch Transmission Watermain, and Fiber Optic Conduit INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the Utility Relocation Project — 9 to 10 Street: Sanitary Sewer, 20 -Inch Transmission Watermain, and Fiber Optic Conduit. BACKGROUND The project involves the replacement and relocation of the following utilities: 8 -inch sanitary sewer; 20 -inch transmission watermain; network fiber; and traffic fiber that are currently located within the alley between Central Avenue and Iowa Street that runs from 9 to 10 Street. These utilities will be replaced and relocated to 9 and 10 Streets and to the west side of the Central Avenue. On February 15, 2010, the City Council authorized initiation of the public bidding process and set a public hearing for March 1, 2010 to consider approval of the plans and specifications, form of contract and estimated cost. At the March 1, 2010 public hearing, through the adoption of a resolution, the City Council approved the plans, specifications, form of contract, and estimated cost for the Utility Relocation Project — 9 to 10 Street project. DISCUSSION Multiple addendums were issued during the bidding process to clarify the elements of the project and to add value to the project. Changes to the scope of the project include adding water and sanitary sewer service for the parking facility, adding additional fiber conduit on Iowa Street, and increasing the pavement protection /replacement standards for 9 1 0 th and Central Avenue. Based on these changes, the revised project cost estimate is $936,672.40 up from $821,422.50. Because the construction contractor must wait until the bid is awarded before ordering materials, the City pre- ordered and purchased the 20 -inch diameter water main materials. This ensures that material delivery will not delay completion of the utility relocation project. BID RESULTS Sealed bids were received on March 9, 2010. Top Grade Iowa, submitted the low bid in the amount of $710,860.87. the revised estimate of probable cost. A summary of the follows: Top Grade Excavating, Inc. Connolly Construction RECOMMENDATION I recommend that the contract be awarded to Top Grade Excavating, Inc. in the amount of $710,860.87. BUDGET IMPACT The revised estimate of probable costs for the Utility Relocation Project Street: Sanitary Sewer, 20 -Inch Transmission Watermain, and Fiber Optic follows: Revised Estimate Construction Contract $726,082.50 Water Main Materials* 46,305.40 Contingency 65,713.80 Construction Engineering & Inspection 98,570.70 Total Project Cost $936,672.40 *The large- diameter water main materials were purchased by the City directly from the supplier availability. The funding summary is as follows: CIP No. 7201066 3001615 3001266 3501608 7402261 Contractor Name Fund Description Sanitary Sewer Construction Funds General Storm Sewer Repairs Traffic Conduit & Foundations Fiber Optic Conduit & Structures Street Lighting Water Funds Total Project Funding Excavating, Inc. of Epworth, This amount is 2.10% under bid proposals received is as Total Bid $ 710,860.87 $1,046,361.30 — 9th to 10 Conduit is as Bid $710,860.87 46, 305.40 65,713.80 98,570.70 $921,450.77 to ensure its Fund Amount $286,993.41 18,886.58 72,309.25 80,404.50 46,168.94 416,688.09 $921,450.77 The sanitary sewer relocation will be funded with savings from the Asbury Plaza Area Wastewater Pumping Facilities Project in the amount of $307,350.80. ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the Utility Relocation Project — 9 to 10 Street: Sanitary Sewer, 20 -Inch Transmission Watermain, and Fiber Optic Conduit to Top Grade Excavating, Inc. in the amount of $710,860.87. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street Maintenance Supervisor Bob Green, Water Department Manager Deron Muehring, Civil Engineer II Todd Irwin, Engineering Technician AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE UTILITY RELOCATION PROJECT - 9 TO 10 STREET: SANITARY SEWER, 20 -INCH TRANSMISSION WATERMAIN, AND FIBER OPTIC CONDUIT Whereas, sealed proposals have been submitted by contractors for the Utility Relocation Project - 9 to 10 Street: Sanitary Sewer, 20 -Inch Transmission Watermain, and Fiber Optic Conduit (the Project) pursuant to Resolution No. 53 -10 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 19 day of February, 2010. Whereas, said sealed proposals were opened and read on the 9 day of March, 2010 and it has been determined that Top Grade Excavating, Inc., with a bid in the amount of $710,860.87, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Top Grade Excavating, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 15th day of March 2010. Attest: eanne F. Schneider, CMC, City Clerk RESOLUTION NO. 88 -10 Roy D. Buol, Mayor NO. DESCRIPTION QUANTITY Engineer's Estimate UNIT TOTAL PRICE PRICE Top Grade Excavating UNIT TOTAL PRICE PRICE Connolly Construction UNIT TOTAL PRICE PRICE UNIT PRICE TOTAL PRICE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 MISCELLANEOUS Mobilization Traffic and Safety Control Phase I - Inc. Daily Inspection Traffic and Safety Control Phase II - Inc. Daily Inspection Pavement Markings EROSION AND SEDIMENTATION CONTROL 12" Fitter Sock at Inlets Pavement Surface Clean Up During Construction DEMOLITION Traffic Sign, Remove, Salvage & Replace Way Finding Sign, Remove, Salvage & Replace Remove Existing Street Light & Base, or Ped. Pole and Base Full Depth Pavement Sawing Remove Existing PCC Curb & Gutter Remove Existing PCC Pavement (9 ") Remove Existing ACC Pavement (3.5 ") Remove and Salvage Brick Pavers Remove Existing Composit Pavement (3" ACC over 7" PCC) Remove Existing Drive Apron Remove Existing Sidewalk Remove Existing Storm Intake Remove Existing Storm Sewer Pipe Remove Existing Sanitary Sewer Manhole Abandon Existing Sanitary Sewer Pipe (8 ") Remove Existing Water Main Pipe (20 ") EXCAVATION & STONE Trench Stabilization Stone, Inc. Over Excavation Backfrll, Limestone 3" Crushed Stone Base Modified Subbase Graded Stone Base 1 1 1 1 15 8 6 2 6 970 300 725 1150 6255 870 90 825 4 60 3 4 310 200 5100 1500 500 60 LS LS LS LS EA EA EA EA EA LF LF SY SY SF SY SY SY EA LF EA CY LF Ton Ton Ton Ton Ton $ 15,500.00 $ 15,500.00 $34,700.00 $ 34,700.00 $ 81,000.00 $ 81,000.00 $ - $ 12,800.00 $ 12,800.00 $15,025.00 $ 15,025.00 $ 20,500.00 $ 20 500.00 $ - $ 1,750.00 $ 1,750.00 $15,025.00 $ 15,025.00 $ 20 500.00 $ 20 500.00 $ - $ 2,500.00 $ 2,500.00 $1,200.00 $ 1,200.00 $ 1,430.00 $ 1,430.00 $ - Sub Total $ 80.00 $ 32,550.00 $ 1,200.00 Sub Total $70.00 $ 65,950.00 $ 1,050.00 Sub Total $ 240.00 $ 123,430.00 $ 3,600.00 Sub Total $ - $ - $ 300.00 $ 2,400.00 $200.00 $ 1,600.00 $ 1,784.00 $ 14,272.00 $ - Sub Total $ 250.00 $ 3,600.00 $ 1,500.00 Sub Total $150.00 $ 2,650.00 $ 900.00 Sub Total $ 501.00 $ 17,872.00 $ 3 006.00 Sub Total $ - $ - $ 350.00 $ 700.00 $300.00 $ 600.00 $ 2,200.00 $ 4,400.00 $ - $ 300.00 $ 1,800.00 $750.00 $ 4,500.00 $ 957.00 $ 5 742.00 $ - $ 3.50 $ 3,395.00 $2.25 $ 2,182.50 $ 2.85 $ 2,764.50 $ - $ 2.00 $ 600.00 $1.00 $ 300.00 $ 6.65 $ 1,995.00 $ - $ 8.00 $ 5,800.00 $4.97 $ 3,603.25 $ 5.80 $ 4 205.00 $ - $ 6.00 $ 6,900.00 $2.50 $ 2,875.00 $ 10.70 $ 12,305.00 $ - $ 5.00 $ 31,275.00 $0.85 $ 5,316.75 $ 3.15 $ 19 703.25 $ - $ 10.00 $ 8,700.00 $5.50 $ 4,785.00 $ 17.10 $ 14,877.00 $ - $ 10.00 $ 900.00 $2.50 $ 225.00 $ 6.40 $ 576.00 $ - $ 8.00 $ 6,600.00 $1.50 $ 1,237.50 $ 5.80 $ 4 785.00 $ - $ 275.00 $ 1,100.00 $250.00 $ 1,000.00 $ 480.00 $ 1,920.00 $ - $ 5.00 $ 300.00 $2.50 $ 150.00 $ 26.80 $ 1 608.00 $ - $ 250.00 J 750.00 $350.00 $ 1,050.00 $ 560.00 $ 1,680.00 $ - $ 125.00 $ 500.00 $95.00 $ 380.00 $ 790.00 $ 3160.00 $ - $ 15.00 $ 4,650.00 $11.61 $ 3,599.10 $ 59.35 $ 18,398.50 $ - Sub Total $ 75,470.00 Sub Total $6.50 $ 32,704.10 $ 1,300.00 Sub Total $ 16.30 $ 101,125.25 $ 3,260.00 Sub Total $ - $ - $ 14.00 $ 2,800.00 $ 6.00 $ 30,600.00 $2.50 $ 12,750.00 $ 5.58 $ 28,458.00 $ - $ 10.75 $ 16,125.00 $14.17 $ 21,255.00 $ 16.35 $ 24 525.00 $ - $ 10.75 $ 5,375.00 $14.17 $ 7,085.00 $ 17.20 $ 8,600.00 $ - $ 12.00 $ 720.00 $14.17 $ 850.20 $ 16.35 $ 981.00 $ - Sub Total $ 55,620.00 Sub Total $ 43,240.20 Sub Total $ 65,824.00 Sub Total $ - Masterpiece on the Mississippi BID TABULATION FORM Project Name: Project Completion Date: Utility Relocation Project 9th to 10th Street; Sanitary Sewer, 20" Transmission Water Main, and Fiber Optic Conduit 23 -Apr -10 NO. DESCRIPTION QUANTITY Engineer's Estimate UNIT TOTAL PRICE PRICE Top Grade Excavating UNIT TOTAL PRICE PRICE Connolly Construction UNIT TOTAL PRICE PRICE UNIT PRICE TOTAL PRICE 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 STORM SEWER SEWER Storm Sewer Intake -101B Storm Sewer Pipe - 12" DIP Storm Sewer Pipe - 12" DIP Stub with temp cap Connect New DIP Pipe to Existing 12" Storm Sewer SANITARY SEWER Bypass Pumping Connect to Existing 8" Sanitary Sewer Connect to Existing 10" Sanitary Sewer 48" Diameter Manhole Base, Inc Bedding 48" Diameter Manhole Sidewall Construct OutsideDrop(8 ") Manhole Frame & Cover 8" DIP Inc. Bedding and Wrap class 51 10" DIP Inc. Bedding and Wrap class 51 4" DIP Inc. Bedding and Wrap (Lateral for Future Ramp) 6" DIP Inc. Bedding and Wrap (Lateral for Fire Station) 4° Clean -out on Run w/ frame and cover (CI) 6" Terminal Clean -out w/ frame and cover (CI) Sewer Service Connections w/ fittings and coupling or cap 4 95 1 4 1 4 1 4 53 1 4 492 120 30 153 1 1 2 Ea LF EA EA LS EA EA EA VF LS LS LF LF LF LF EA EA EA $ 1,500.00 $ 6,000.00 $2,180.00 $ 8,720.00 $3,075.00 $ 12,300.00 $ - $ 35.00 $ 3,325.00 $41.68 $ 3,959.60 $62.60 $ 5,947.00 $ - $ 100.00 $ 100.00 $432.00 $ 432.00 $357.00 $ 357.00 $ - $ 150.00 $ 600.00 $495.00 $ 1980.00 $315.00 $ 1,260.00 $ - Sub Total $ 1,200.00 $ 10,025.00 $ 1,200.00 Sub Total $675.00 $ 15,091.60 $ 675.00 Sub Total $16,420.00 $ 19,864.00 $ 16,420.00 Sub Total $ - $ - $ 125.00 $ 500.00 $845.00 $ 3,380.00 $ 428.00 $ 1,712.00 $ - $ 150.00 $ 150.00 $855.00 $ 855.00 $ 435.00 $ 435.00 $ - $ 900.00 $ 3,600.00 $1,275.00 $ 5,100.00 $ 525.00 $ 2,100.00 $ - $ 95.00 $ 5,035.00 $125.00 $ 6,625.00 $ 102.00 $ 5,406.00 $ - $ 1,150.00 $ 1,150.00 $1,183.00 $ 1,183.00 $ 1230.00 $ 1,230.00 $ - $ 325.00 $ 1,300.00 $290.00 $ 1,160.00 $ 1,005.00 $ 4,020.00 $ - $ 36.00 $ 17,712.00 $117.26 $ 57,691.92 $ 66.50 $ 32,718.00 $ - $ 42.00 $ 5,040.00 $121.16 $ 14,539.20 $ 67.10 $ 8,052.00 $ - $ 30.00 $ 900.00 $81.09 $ 2,432.70 $ 74.65 $ 2,239.50 $ - $ 32.00 $ 4,896.00 $76.13 $ 11,647.89 $ 74.80 $ 11,444.40 $ - $ 320.00 $ 320.00 $1,025.00 $ 1,025.00 $ 1,295.00 $ 1,295.00 $ - $ 200.00 $ 200.00 $1,025.00 $ 1,025.00 $ 1,385.00 $ 1,385.00 $ - $ 200.00 $ 400.00 $200.00 $ 400.00 $ 895.00 $ 1,790.00 $ - Sub Total $ 42,403.00 Sub Total $ 107,739.71 Sub Total $ 90,246.90 Sub Total $ - • NO. DESCRIPTION QUANTITY Engineer's Estimate UNIT TOTAL PRICE PRICE Top Grade Excavating UNIT TOTAL PRICE PRICE Connolly Construction UNIT TOTAL PRICE PRICE UNIT PRICE TOTAL PRICE 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 WATER MAIN Boring Setup(Under Central Ave.) 20" Bored Steel Casing(0.312" Wall) Casing Spacers Ductile Iron Pipe(20 ") class 51 (20" DIP furnished by City) Ductile Iron Pipe(12') class 52 Ductile Iron Pipe(6 ") class 52 Ductile Iron Pipe(8 ") class 52 Ductile Iron Pipe(4 ") class 52 Valve(20 ") w/Box & Cover (valves furnished by City) Valve(12") w/Box & Cover Valve(8 ") w /Box & Cover Valve(6 ") w /Box & Cover Valve(4 ") w /Box & Cover Hydrant(6 ") 6" DIP Hydrant Lead Fittings Connect To Existing 4 ", 6" and 8" Water Main 20" Connection w/ Standard Coupling 20" Connection w/ Transition Coupling 20" Mega Lug Retainer Gland or Field Lok MJ 12" Mega Lug Retainer Gland or Field Lok MJ 8" Mega Lug Retainer Gland or Field Lok MJ 6" Mega Lug Retainer Gland or Field Lok MJ 4" Mega Lug Retainer Gland or Field Lok MJ 20" Field Lok 350 Gasket or Sure Stop 350 Gasket 12" Field Lok 350 Gasket or Sure Stop 350 Gasket 8" Field Lok 350 Gasket or Sure Stop 350 Gasket 6" Field Lok 350 Gasket or Sure Stop 350 Gasket Temporary Flushing Assembly Copper Tube (2") Type K Parking Ramp Water Service PAVEMENT PC Concrete Pavement, (9 ") w/ Int Curb, Class "C" Doweled PC Concrete Pavement, (8 ") , Class "C" Doweled PC Concrete Curb & Gutter (30 ") HMA 3000k Surface and Binder Course, W (PG 64-28) Fixture Adjustment PC Concrete Driveway, 6 ", Construct PC Concrete Sidewalk, 4 ", Construct PC Concrete Sidewalk, 6 ", Construct PC Concrete Access Ramp, Detectable 1 45 6 730 75 70 60 115 7 1 3 6 1 3 35 5900 6 1 2 37 7 14 25 8 40 3 3 2 1 12 1 665 800 550 575 19 585 2025 80 2 EA LF EA LF LF LF LF LF EA EA EA EA EA EA LF LBS EA EA EA EA EA EA EA EA EA EA EA EA LS LF LS SY SY LF Ton BA SF SF SF EA $ 1,000.00 $ 1,000.00 $ 9,000.00 $ 300.00 $2,100.00 $ 2,100.00 $ 4,864.00 $ 4,864.00 $ - $ 200.00 $125.00 $ 5,625.00 $ 152.00 $ 6,840.00 $ - $ 50.00 $145.00 $ 870.00 $ 245.00 $ 1,470.00 $ - $ 65.00 $ 47,450.00 $41.75 $ 30,477.50 $ 130.00 $ 94,900.00 $ - $ 80.00 $ 6,000.00 $63.85 $ 4,788.75 $ 89.00 $ 6,675.00 $ - $ 50.00 $ 3500.00 $51.60 $ 3,612.00 $ 75.25 $ 5,267.50 $ - $ 65.00 $ 3,900.00 $55.20 $ 3,312.00 $ 78.65 $ 4 719.00 $ - $ 50.00 $ 5,750.00 $52.70 $ 6,060.50 $ 73.20 $ 8,418.00 $ - $ 5,000.00 $ 35,000.00 $763.00 $ 5,341.00 $ 1,065.00 $ 7,455.00 $ - $ 1,500.00 $ 1,500.00 $1,638.00 $ 1,638.00 $ 1,980.00 $ 1,980.00 $ - $ 1,000.00 $ 3,000.00 $899.67 $ 2,699.01 $ 1,210.00 $ 3,630.00 $ - $ 850.00 $ 5,100.00 $638.00 $ 3,828.00 $ 890.00 $ 5,340.00 $ - $ 700.00 $ 700.00 $633.00 $ 633.00 $ 800.00 $ 800.00 $ - $ 3,000.00 $ 9,000.00 $2,036.00 $ 6,108.00 $ 2,110.00 $ 6,330.00 $ - $ 50.00 $ 1,750.00 $40.90 $ 1,431.50 $ 44.85 $ 1,569.75 $ - $ 7.00 $ 41,300.00 $3.30 $ 19,470.00 $ 4.10 $ 24,190.00 $ - $ 1,200.00 $ 7,200.00 $410.00 $ 2,460.00 $ 623.00 $ 3,738.00 $ - $ 4,000.00 $ 4,000.00 $1,900.00 $ 1,900.00 $ 912.00 $ 912.00 $ - $ 4,000.00 $ 8,000.00 $1,900.00 $ 3,800.00 $ 2,235.00 $ 4,470.00 $ - $ 120.00 $ 4,440.00 $235.00 $ 8,695.00 $ 415.00 $ 15,355.00 $ - $ 80.00 $ 560.00 $89.00 $ 623.00 $ 212.00 $ 1,484.00 $ - $ 65.00 $ 910.00 $50.00 $ 700.00 $ 180.00 $ 2,520.00 $ - $ 60.00 $ 1,500.00 $40.00 $ 1,000.00 $ 120.00 $ 3,000.00 $ - $ 60.00 $ 480.00 $35.00 $ 280.00 $ 120.00 $ 960.00 $ - $ 450.00 $ 18,000.00 $395.00 $ 15,800.00 $ 845.00 $ 33,800.00 $ - $ 300.00 $ 900.00 $130.00 $ 390.00 $ 392.00 $ 1,176.00 $ - $ 200.00 $ 600.00 $82.00 $ 246.00 $ 270.00 $ 810.00 $ - $ 100.00 $ 200.00 $65.00 $ 130.00 $ 210.00 $ 420.00 $ - $ 1,500.00 $ 1,500.00 $1,500.00 $ 1,500.00 $ 3,645.00 $ 3,645.00 $ - $ 18.00 $ 216.00 $23.50 $ 282.00 $ 49.00 $ 588.00 $ - $ 1,500.00 $ 1,500.00 $2,100.00 $ 2,100.00 $ 2,638.00 $ 2,638.00 $ - Sub Total $ - $ 60.00 $ 224,256.00 $ - $ 39,900.00 Sub Total $57.00 $ 137,900.26 $ 37,905.00 Sub Total $ 69.40 $ 259,964.25 $ 46,151.00 Sub Total $ - $ - $ 45.00 $ 36,000.00 $54.00 $ 43,200.00 $ 65.90 $ 52,720.00 $ - $ 15.00 $ 8,250.00 $22.00 $ 12,100.00 $ 25.95 $ 14,272.50 $ - $ 85.00 $ 48,875.00 $68.50 $ 39,387.50 $ 80.55 $ 46,316.25 $ - $ 375.00 $ 7,125.00 $200.00 $ 3,800.00 $ 536.00 $ 10,184.00 $ - $ 5.50 $ 3,217.50 $5.50 $ 3,217.50 $ 5.90 $ 3,451.50 $ - $ 5.00 $ 10,125.00 $4.50 $ 9,112.50 $ 5.30 $ 10,732.50 $ - $ 5.50 $ 440.00 $6.00 $ 480.00 $ 5.90 $ 472.00 $ - $ 150.00 $ 300.00 $350.00 $ 700.00 $ 355.00 $ 710.00 $ - Sub Total $ 154,232.50 Sub Total $ 149,902.50 Sub Total $ 185,009.75 Sub Total $ - NO. DESCRIPTION QUANTITY Engineer's Estimate UNIT TOTAL PRICE PRICE Top Grade Excavating UNIT TOTAL PRICE PRICE Connolly Construction UNIT TOTAL PRICE PRICE UNIT PRICE TOTAL PRICE 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 FIBER OPTIC CONDUIT & STRUCTURES Fiber Vault, Square Fiber Vault, 48" Round 24" Handhole x 3' Deep with Quad Plex Connect to Existing Fiber Vault Conduit, Rigid PVC, 4" With 4 -1" Conduits Trenching for Conduit Horizontal Boring for Conduit STREET LIGHTS Install street light pole foundation (8' -8 ") Install street light pole foundation (6-8") Install 30' street light pole Connect to Existing Structure (IEHH) Conduit, Rigid PVC, 2" TRAFFIC CONDUIT & FOUNDATIONS Traffic Signal Control Cabinet Foundation Precast Rectangular Handhole w/ R6689 Lid Stating "TRAFFIC SIGNALS" 24" Round Handhole Countdown Pedestrian Signal Head, pole mount (inc. Install) Conduit, Rigid PVC, 2" Conduit, Rigid PVC, 4" Tesco Foundation Fiber Hub Foundation Install Street Light Foundation (12' -0") 4 EA 1 EA 1 EA 9 EA 1617 LF 1100 LF 987 LF 1 EA 5 EA 5 EA 10 EA 438 LF 3 EA 3 EA 16 EA 2 EA 2334 LF 556 LF 1 EA 1 EA 1 EA $ 2,800.00 $ 11,200.00 $2,464.75 $ 9,859.00 $ 2,705.00 $ 10,820.00 $ - $ 3,400.00 $ 3,400.00 $2,736.75 $ 2,736.75 $ 3,005.00 $ 3,005.00 $ - $ 800.00 $ 800.00 $1 129.50 $ 1,129.50 $ 1,080.00 $ 1,080.00 $ - $ 650.00 $ 5,850.00 $172.00 $ 1,548.00 $ 205.00 $ 1,845.00 $ - $ 16.00 $ 25,872.00 $12.65 $ 20,455.05 $ 15.05 $ 24,335.85 $ - $ 2.50 $ 2,750.00 $7.50 $ 8,250.00 $ 15.75 $ 17,325.00 $ - $ 8.00 $ 7,896.00 $22.00 $ 21,714.00 $ 29.40 $ 29,017.80 $ - Sub Total $ 850.00 $ 57,768.00 $ 850.00 Sub Total $2,398.00 $ 65,692.30 $ 2,398.00 Sub Total $ 1,885.00 $ 87,428.65 $ 1,885.00 Sub Total $ - $ - $ 600.00 $ 3,000.00 $1,965.00 $ 9,825.00 $ 1,705.00 $ 8,525.00 $ - $ 3,500.00 $ 17,500.00 $2,538.00 $ 12,690.00 $ 3,105.00 $ 15,525.00 $ - $ 650.00 $ 6,500.00 $172.00 $ 1,720.00 $ 205.00 $ 2,050.00 $ - $ 5.00 $ 2,190.00 $8.20 $ 3,591.60 $ 9.55 $ 4,182.90 $ - Sub Total $ 1,800.00 $ 30,040.00 $ 5,400.00 Sub Total $2,125.00 $ 30,224.60 $ 6,375.00 Sub Total $ 1,835.00 $ 32,167.90 $ 5,505.00 Sub Total $ - $ - $ 1,400.00 $ 4,200.00 $1,650.00 $ 4,950.00 $ 1 892.00 $ 5,676.00 $ - $ 600.00 $ 9,600.00 $1,300.00 $ 20,800.00 $ 1,445.00 $ 23,120.00 $ - $ 800.00 $ 1,600.00 $1,958.50 $ 3,917.00 $ 2,275.00 $ 4,550.00 $ - $ 5.00 $ 11,670.00 $4.85 $ 11,319.90 $ 5.70 $ 13,303.80 $ - $ 8.00 $ 4,448.00 $9.45 $ 5,254.20 $ 11.05 $ 6,143.80 $ - $ 800.00 $ 800.00 $1,673.00 $ 1,673.00 $ 1,605.00 $ 1,605.00 $ - $ 1,200.00 $ 1,200.00 $2,073.00 $ 2,073.00 $ 1,630.00 $ 1,630.00 $ - $ 1,200.00 $ 1,200.00 $3,403.50 $ 3,403.50 $ 1,895.00 $ 1,895.00 $ - Sub Total Total Est. $ 40,118.00 $ 726,082.50 Sub Total Total Bid $ 59,765.60 $ 710,860.87 Sub Total Total Bid $ 63,428.60 $ 1,046,361.30 Sub Total Total Bid $ - $ - - 2.10% 44.11% - 100.00% % Over / Under ( -) March 9, 2010 Gus Psihoyos City of Dubuque 50 West 13 Street Dubuque, IA 52001 Re: City of Dubuque Utility Relocation Project 9th To 10th Street Sanitary Sewer, 20 -Inch Transmission Watermain, & Fiber Optic Conduit Award Recommendation IIW Project No.: 09211 -02 Dear Gus: In accordance with City instructions, bids for the above referenced project were opened and read at 10 :00 a.m. on March 9, 2010. Two (2) bids were received for this project. A tabulation of the bids is enclosed. After reviewing the bids, it was determined the low bid was submitted by Top Grade Excavating, Inc. of Epworth, Iowa, in the amount of $710,860.87. Top Grade Excavating, inc. has the experience, workforce and equipment to properly complete this contract. We recommend award of the Utility Relocation Project to Top Grade Excavating, Inc. in the amount of $710,860.87. The engineer's estimate for this project was $726,082.50. The low bid of $710,860.87 is $15,221.63 or 2% below the engineer's estimate. Sincerely, IIW ENGINEERS & SURVEYORS, P.C. Gary Sejkora, P.E. Enclosure Copy: Bob Green, Water Dept. Manager w /enclosure Top Grade w /enclosure I I W E n g i n e e r s & Surveyors, P . C . Dubuque, IA Hazel Green, WI INTEGRITY. EXPERTISE. SOLUTIONS. Dennis F. Waugh, PE/SE Charles A. Cate, PE Gary D. Sejkora, PE Michael A. Jansen, PE/SE Ronald A. Balmer. PE/SE John M. Tranmer, PLS Timothy J. Trancl, PE John F. Wandsnider, PE Julie P. Ncebcl, PE James P. Kaunc, PE Thomas J. Oster, PLS Wray A. Childers, PLS Geoffry T. Blundin, PE Mark C. Jobgen, PE Lauren N. Ray, PE/SE Bradley J. Mootz, PE/SE Cody T. Austin, PE Marc D. Ruden, PE Civil Engineering Structural Engineering Environmental Engineering Municipal Engineering Transportation Engineering Architectural Engineering Land Surveying Construction Services 4155 Pennsylvania Avenue Dubuque, Iowa 52002 -2628 563 -556 -2464 563-556-7811 fax www.iiwengr_com