Recording the Award of the 2019 Madison St. Retaining Wall Reconstruction Emergency Repair Project Copyrighted November4, 2019 City of Dubuque Consent Items # 12. ITEM TITLE: Recording the Award of the 2019 Madison St. Retaining Wall Reconstruction Emergency Repair Project SUMMARY: City Manager recommending that the award of the Madison Street Retaining Wall Emergency Repairs Project to Drew Cook& Sons Excavating Co., I nc. be officially recorded in the minutes of the City Council. SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Make Matterof Record ATTACHMENTS: Description Type Madison Street Retaining Wall Emergency Repairs City Manager Memo Project-MVM Memo Staff Memo Staff Memo Dubuque THE CITY OF � uI�AaMca cih DuB E � � I � � I Maste iece on the Mississi i Zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Madison Street Retaining Wall Emergency Repairs Project DATE: October 28, 2019 Through the competitive quotation process for public improvements, the Madison Street Retaining Wall Emergency Repairs Project was awarded on October 18, 2019, to Drew Cook & Sons Excavating Co., Inc., in the amount of $70,022.20, which is 28.4% below the estimate of probable cost. City Engineer Gus Psihoyos recommends that the award for the Madison Street Retaining Wall Emergency Repairs Project be officially recorded in the minutes of the City Council. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE CITY OF � All-A�eria ciry DUB E ' _. .� . � i� � � 2007�20.t2•2013 ' Masterpiece o�z flie Mississippi zol�*zoi9 TO: Michael C. Van Milligen, City Manager,.�.._......._.,� FROM: Gus Psihoyos, City Engineer ��� �-�� DATE: October 25, 2019 RE: Madison Street Retaining Wall Emergency Repairs Project INTRODUCTION The purpose of this memorandum is to award the construction contract for the Madison Street Retaining Wall Emergency Repairs Project. DISCUSSION The existing stone retaining wall at 1849 Madison Street has failed. This wall supports the sidewalk, street and gas utility on Madison Street. WHKS of East Dubuque, IL prepared the structural design of the wall with the City engineering staff assisting with the plan development. The project includes the reconstruction of the 45' long by 8-foot-high wall with a modular concrete wall (Redi-rock) similar to the wall that was replaced on another section of Madison Street in 2010. This type of wall is aesthetically pleasing and is much lower in cost to install than native limestone. BID RESULTS Sealed informal bids were received on October 18, 2019, for the Madison Street Retaining Wall Emergency Repairs Project. Drew Cook & Sons Excavating Company, Inc. of Dubuque, IA submitted the low bid in the amount of $70,022.20, which is 28.4% below the estimate of probable cost. A summary of the bid proposals received are as follows: Contractor Base Bid Drew Cook & Sons Excavating, Co. Inc. $70,022.20 McDermott Excavating $107,077.30 Tschiggfrie Excavating $121,506.00 RECOMMENDATION Thraugh the cr�mpetifiive quatation �rocess for pubiic improvements, this �,roject was awarded on October 18, 2019 to Drew Cook & Sons Excavating Company, Inc. of Dubuque, IA, in the contract amount of$70,022.20. BUDGET IMPACT The estimate of probable cost for the Madison Street Retaining Wall Emergency Repairs Project is summarized below: Description Estimate Award Construction $ 97,835.00 $ 70,022.20 Contingency 9,784.00 9,784.00 Engineering, Construction Administration & Inspection 16,143.00 16,143.00 Total Construction Cost $ 123,762.00 $96,149.20 The funding is as follows: CIP No. Fund Description Fund Amount 3001029 Stone Retainin Walls $ 96,149.20 ACTION TO BE TAKEN In accordance with the competitive quotation requirements of lowa Code, Section 26.14, it is necessary that the award for the Madison Street Retaining Wall Emergency Repairs Project be officially recorded in the minutes of the City Council. Prepared by: Kerry Bradley, Eng. Dept. cc: Bob Schiesl, Asst. City Engineer Adam Decker, Engineering Tech 2