Loading...
Acceptance of Grand River Center Decorative Concrete Replacement Project Copyrighted December 2, 2019 City of Dubuque Consent Items # 24. ITEM TITLE: Acceptance of Grand River Center Decorative Concrete Replacement Project SUMMARY: City Manager recommending acceptance of the public improvement construction contract for the Grand River Center— Decorative Concrete Repair Project, as completed by D&D Concrete, Inc. RESOLUTION Accepting the Grand River Center- Decorative Concrete Repair Project and Authorizing the Final Payment to the Contractor SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Adopt Resolution(s) ATTACHMENTS: Description Type Grand River Center Decorati� Concrete Repair City Manager Memo Project-MVM Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Cert Supporting Documentation Dubuque THE CITY OF � uI�AaMca cih DuB E � � I � � I Maste iece on the Mississi i Zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Grand River Center— Decorative Concrete Repair Project DATE: November 24, 2019 Assistant City Engineer Bob Schiesl is recommending acceptance of the public improvement construction contract for the Grand River Center— Decorative Concrete Repair Project, as completed by D&D Concrete, Inc., in the final contract amount of $74,705.13, which is a 3% decrease from the original contract amount of $77,048.00. I concur with the recommendation and respectfully request Mayor and City Council approval. � Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer Dubuque THE CITY OF � All-America City UB E ��o������,�� � � ��► Maste iece on the Mississi i 2°°'*2°12�z°13 �P pp zoi�*zoi9 TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer �,�� SUBJECT: Grand River Center - Decorative Concrete Repair Project CIP No. 3002710 DATE: November 22, 2019 INTRODUCTION The enclosed resolution provides for the acceptance of the public improvement construction contract for the Grand River Center - Decorative Concrete Repair Project. BACKGROUND The Grand River Center - Decorative Concrete Repair Project provided for the following improvements: • Removed and replaced the decorative concrete at the west front main entrance. • Removed and replaced the pedestrian walkway decorative concrete from the front Northwest parking lot to the front building entrance. • Removed and replaced sections of decorative concrete around the fountain area. • Removed and replaced a section of decorative concrete at the rear exterior patio under the River room that extends through the Riverwalk to the cascading stairs. • Miscellaneous spot repairs as needed. Work was completed prior to the lowa League of Cities Conference which was held in September 2019. DISCUSSION The Grand River Center - Decorative Concrete Repair Project was completed by D&D Concrete, Inc. of Dubuque, lowa, in the final contract amount of$74,705.13, which is a 3% decrease from the original contract amount of$77,048.00. RECOMMENDATION I recommend that the City Council accept the public improvements and authorize the payment of the contract amount of $74,705.13 to D&D Concrete, Inc. of Dubuque, lowa, for the Grand River Center - Decorative Concrete Repair Project. BUDGETIMPACT The cost for the Decorative Concrete Repair Project is as follows: Description Estimate Award Final Cost Construction $ 84,925.00 $ 77,048.00 $ 74,705.13 Contingency 5,000.00 5,000.00 Engineering Design and Construction 10,000.00 10,000.00 8,998.96 Total Construction Cost $ 99,925.00 $ 92,048.00 $ 83,704.09 The project funding summary is as follows: CIP Funding Source Amount 3002710 GRC - Exterior Decorative Concrete $ 83,704.09 Total Project Funding S 83.704.09 The City has $100,000 budgeted for the Grand River Center - Decorative Concrete Repair Project, CIP No. 3002710. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the public improvements and to authorize the final payment of the contract amount of $74,705.13 to D&D Concrete, Inc, for the Grand River Center - Decorative Concrete Repair Project. Prepared by: Bob Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director Marie Ware, Leisure Services Manager F:\PROJECTS\GRCC-Grand River Convention Center Repairs\2019- Decorative Concrete Repairs\Council and Staff Documents\Acceptance RESOLUTION NO. 416-19 ACCEPTING THE GRAND RIVER CENTER - DECORATIVE CONCRETE REPAIR PROJECT AND AUTHORIZING THE FINAL PAYMENT TO THE CONTRACTOR Whereas, the public improvement contract for the Grand River Center - Decorative Concrete Repair Project (the Project) has been completed by the Contractor, D&D Concrete, Inc. of Dubuque, IA (Contractor), and the City Engineer has examined the work and signed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and Whereas, the final contract amount for the Project is $74,705.13; and Whereas, the Contractor has previously been paid $70,969.87, leaving a retainage balance of $3,735.26; and Whereas, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Grand River Center - Exterior Decorative Concrete CIP appropriations for the contract amount of $74,705.13 less any retained percentage provided for therein as provided in Iowa Code. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $3,735.26 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 2nd day of December., 019. Roy D. , uol, Mayor Attest: Trish L. Gleason, MMC, Assistant City Clerk O CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE GRAND RIVER CENTER - DECORATIVE CONCRETE REPAIR PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Grand River Center Decorative Concrete Repair Project, and that the Project has been completed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $83,704.09. Dated this 22"d day of November 2019. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 22nd day of November 2019, Trish Gleason, CMC, Assistant City Clerk