Loading...
Lower Bee Branch Security Network Project_Hearing Copyrighted December 2, 2019 City of Dubuque Public Hearings # 1. ITEM TITLE: Lower Bee Branch Security Network Project SUMMARY: Proof of Publication on notice of public hearing to consider approval of the plans, specifications, form of contract and estimated cost for the Lower Bee Branch Security Network Project and the City Manager recommending approval. RESOLUTION Approval of Plans, Specifications, Form of Contract, and Estimated Cost for The Lower Bee Branch Security Network Project SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Adopt Resolution(s) ATTACHMENTS: Description Type Lower Bee Branch Security Network Project-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY OF � uI�AaMca cih DuB E � � I � � I Maste iece on the Mississi i Zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Lower Bee Branch Security Network Project CIP #3401654, PROJECT #4X0007 DATE: November 24, 2019 City Engineer Gus Psihoyos recommends City Council approval of the plans, specifications, form of contract and estimated cost of $350,271.08 for the Lower Bee Branch Security Network Project. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE CITY OF � s" A���Il�eeis�ei� DUB E i r � I � � �e�o��zc�u•za�3 Mc�sterpiece on tlae Mississippi 2017*2019 TO: Michael C. Van Milligen, City Manag ---•�'� , FROM: Gus Psihoyos, City Engineer � � - SUBJECT: Lower Bee Branch Security Network Project CIP# 3401654, PROJECT# 4X0007 DATE: November 22, 2019 INTRODUCTION The enclosed resolution is in reference to the public hearing for the Lower Bee Branch Security Network Project. BACKGROUND In June of 2010, the City Council awarded the construction contract for the Lower Bee Branch Creek Restoration Project in the amount of$10,836,588.85. Because the bid was more than 25% over the engineer's estimate of probable cost, the construction of ancillary improvements such as the floating islands and the security camera network for the trail system were delayed. ln November of 2013 the City Council passed Resolution 335-13 adopting the 2013 �rainage �asin Master Plan A�endment. The 2013 Amendmer�t did not replace the 2001 Drainage Basin Master Plan. Instead, it built upon its foundation. The amended Drainage Basin Master Plan outlined several improvements throughout the Bee Branch watershed to mitigate the effects of future flooding and disasters. Collectively, the improvements form the basis of the Bee Branch Watershed Flood Mitigation Project outlined in Table 1 below. Table 1. Twelve phases of the Bee Branch Watershed Flood Mitigation Project Phase Description Status 1 Carter Road Detention Basin Complete 2 West 32"d Street Detention Basin Complete 3 Historic Millwork District Complete 4 Lower Bee Branch Creek Restoration Complete* 5 Flood Mitigation Gate Replacement Under Design 6 Impervious Surface Reduction (Green Alleys) Under Construction 7 Upper Bee Branch Creek Restoration Complete g 22"d Street Storm Sewer Improvements Under Construction 9 Flood Mitigation Maintenance Facility Site Cleanup 10 North End Storm Sewer Improvements 11 Water Plant Flood Protection * The floating island and security camera network improvements for the Lower Bee Branch Creek Restoration Project were delayed pending funding. In December of 2013, the lowa Flood Mitigation Bo�rd voted to approve the City's use of $98,494,178 in state sales tax increment funding for fhe Bee Branch Watershed Flood Mitigation Project. DISCUSSION Plans and specifications for the Lower Bee Branch Security Network Project (Project) have been developed and are ready for bidding. The Project improvements consist of the construction of approximately 10,000 feet of fiber-optic conduit and micro-duct with 5,600 feet of fiber-optic cable and 5,300 feet of electric conduit along the Lower Bee Branch Creek. Two new network cabinets will be installed and integrated into the City-wide network. A total of 21 cameras will be installed for security. It also includes the installation of a new irrigation controller, back flow preventer, and 130 linear feet of 2-inch copper water service. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process November 18, 2019 Publish Notice to Bidders, Advertise for Bids November 19, 2019 Publish Public Hearing Notice on Plans & Specs November 22, 2019 Public Hearing on Plans & Specifications December 2, 2019 Receipt of Bids (Bid Letting) December 19, 2019 Award Construction Contract January 6, 2020 Final Project Completion Date June 12, 2020 RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and estimated cost for the Lower Bee Branch Security Network Project. BUDGETIMPACT The estimate of probable costs for the Lower Bee Branch Security Network Project is as follows: Construction $303,265.00 Contingency (5%) 15,163.25 Engineering 31,842.83 Total Project Cost $350,271.08 The funding summary is as follows: CIP No. Fund Description Fund Amount 3401654 Bee Branch Creek Restoration Pro�ect $360,000.00 Sales Tax Increment Bond Proceeds $360,000.00 ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and estimated cost for the Lower Bee Branch Security Network Project through the adoption of the attached resolution. F'reparer� by D�ron Muehrinc� cc: Crenna �rumwell, C;ity Attorn�y Jenny Larson, Budc��t Direcfior Dave Ness, Civil Enc,�,incer Deran Muehring, Civil �nc�ine�r RESOLUTION NO. 422-19 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMAT- ED COST FOR THE LOWER BEE BRANCH SECURITY NETWORK PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Lower Bee Branch Security Network Project, in the estimated amount $303,265.00, are hereby approved. Passed, adopted, and approved this the 2nd day of December 201 Attest: Trish L. Gleason, MMC, Assistant City Clerk ,9 Roy D. Buol, Mayor STATE OF IOWA {SS: DUBUQUE COUNTY CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald, a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: November 22, 2019, and for which the charge is $34.72 Subscribed to before me, a Notary Public in and for Dubuque County, Iowa, this 01 day of flyrrj,j p in and for ubu ue , 20 I R. Notary Pu • ; q County, Iowa. jANE,'r K. PAP Commission Number 199659 My COMM. Exp. DEC 11, 2019 CITY OF DUBUQUE; IOWA OFFICIAL NOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE LOWER BEE BRANCH SECURITY NETWORK PROJECT NOTICE IS HEREBY GIVEN: The City Coun- cil of the City of Dubuque, hold" a public, hearingwill ori the proposedIowa plans, specifications, form of contract, and estimat- ed cost for the Lower Bee Branch Sec urity Network Project, in ac- cordance with the pro- visions of Chapter 26, Code of Iowa. at 6:00 p.m. on the 2nd day of December 2019, in the Historic Federal Build- ing Council Chambers (second floor), 350 West 6th ` Street, Dubuque, Iowa. Said proposed plans, speci- fications, form of con- tract, and estimated cost are now on file in the office of the City Clerk. The scope of the Project is as follows: Lower Bee Branch Se- curity Network Project CIP# 3401654, PROJECT# 4X0007 This project consists of the construction of approximately 10,000 feet of fiber-optic con- duit and micro -duct', with 5,600 feet of fiber- optic cable iberoptic-'cable and 5,300 feet of electric conduit along the Lower Bee Branch Creek. Two new network cabinets will be installed and inte- grated into the City- wide network.`" A total ,l of 21 cameras will be installed for security. A new irrigation con- troller, back flow pre- venters, and 130 linear feet of 2 -inch copper water service will be constructed. Copies of supporting documents for the pub- lic hearings are on file in the City Clerk's Of- fice, City Hall, 50 W. 13th <St„ Dubuque, Iowa, and may be viewed during normal working hours. Written comments re- garding the above pub- lic hearings may be,1 submitted to the City Clerk's Office, 50 W. 13th St., Dubuque, IA 52001, on or. before said time " of ';public aring. At said time and place of public hearings all interested' citizens and parties will be given an oppor- tunity to be heard for --', or against said propos- al. Individuals with limit- ed English proficiency, I vision, hearingor speech impairments requiring special assistance should contact the City. Clerk's Office at (563) 1 5$9-: 4100, TDD/TTY "? 690-6678, - ctyclerk@ci- (563) tyofdubuque.org as soon as feasible. Deaf or hard -of -hearing indi- viduals can use Relay Iowa by dialing 711 or (800) 735-2942. Published by order of the City Council given on the 18th day of November 2019. Kevin S. Firnstahl, CMC, City Clerk It 11/22