Acceptance of Van Buren Street Energy Dissipator Project Copyrighted
December 16, 2019
City of Dubuque Consent Items # 20.
ITEM TITLE: Acceptance of Van Buren Street Energy Dissipator Project
SUMMARY: City Manager recommending acceptance of the public
improvement construction contract for the Van Buren Street
Energy Dissipator Project, as completed by Drew Cook&
Sons Excavating Company, Inc.
RESOLUTION Accepting the Van Buren Street Energy
Dissipator Project and Authorizing the final payment to the
contractor
SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Adopt
Resolution(s)
ATTACHMENTS:
Description Type
Van Buren Street Energy Dissipator Project-MVM City Manager Memo
Memo
Staff Memo Staff Memo
Resolution Resolutions
Engineer's Cert Supporting Documentation
Dubuque
THE CITY OF �
uI�AaMca cih
DuB E � �
I � � I
Maste iece on the Mississi i Zoo�•zoiz•zois
YP pp zoi�*zoi9
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Van Buren Street Energy Dissipator Project
DATE: December 11, 2019
City Engineer Gus Psihoyos is recommending acceptance of the public improvement
construction contract for the Van Buren Street Energy Dissipator Project, as completed
by Drew Cook & Sons Excavating Company, Inc., in the final contract amount of
$94,960.07, which is a 10.5% increase from the original contract amount of $85,681.50.
The increase in cost was due to additional rock excavation, backfill, tree removal, and
sidewalk replacement.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
�
Mic ael C. Van Milligen
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Teri Goodmann, Assistant City Manager
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Dubuque
THE CITY OF �
D---�� All•America Ciry
UF E 'I �� j '
� �
MGZSteY leCC' �ri tlie Mississi I z���•Zo�.z•zoi3
p �'P zo�.�*Zoi9
TO: Michael C. Van Milligen, City Manager,._�--_,
c.. ��. �
FROM: Gus Psihoyos, City Engineer _„.��� ::�>> "~`
DATE: December 9, 2019
RE: Van Buren Street Energy Dissipator Project
INTRODUCTION
The enclosed resolution provides for the acceptance of the public improvement
construction contract for the Van Buren Street Energy Dissipator Project.
BACKGROUND
This Van Buren Street Energy Dissipator Project involved improvements to the outlet of
the 72" diameter storm sewer south of Van Buren Street near Hickson Avenue. The
existing storm outlets into a natural drainage ditch which has become unstable. The
improvements will protect both the storm sewer and adjacent private property from
deteriorating and undermining.
DISCUSSION
The Van Buren Street Energy Dissipator Project was completed by Drew Cook & Sons
Excavating Company, Inc. of Dubuque, IA in the final contract $94,960.07. Which is
10.5% increase from the original contract amount of$85,681.50. The increase in cost was
due to additional rock excavation, backfill, tree removal, and sidewalk replacement.
RECOMMENDATION
I recommend that the City Council accept the public improvements and authorize the
payment of the contract amount of $94,960.07 to Drew Cook & Sons Excavating
Company, Inc. of Dubuque, IA, for the Van Buren Street Energy Dissipator Project.
BUDGETIMPACT
The cost for the Van Buren Street Energy Dissipator Project is summarized below:
Description Cost Estimate Award Final
Construction $81,780.00 $85,681.50 $94,960.07
Contingency 8,178.00 8,178.00 0.00
Engineering, Construction 13,493.70 13,493.70 $16,578.07
Administration & Inspection
Total Construction Cost $103,451.70 $107,353.20 $111,538.14
Th� funding is as follc�ws:
CIP No. Fund Description Fund
Amount
7202723 Van Bur�nn Storm (Jullet $111 ,538.14
ACTION TO BE TAKEN
The City Council is requ�sted to adopt the att�ched resolution to acc�;pt the public
imprnvPmPnts and to authorize the fin�l pay�i�Pnt of tl�e contract amount c�f $94,960.07 to
Drew Cook & Sons Exc�v�ting Company, Inc. for the Van Buren Street Energy Dissipator
Pr�ject.
c;c: Jot�n KlostPrmar�n, Public Works Director
D�ron MuPhring, C;ivif Erigin�er II
I
I
1
�
2
RESOLUTION NO. 436-19
ACCEPTING THE VAN BUREN STREET ENERGY DISSIPATOR PROJECT AND
AUTHORIZING THE FINAL PAYMENT TO THE CONTRACTOR
WHEREAS, the public improvement contract for the Van Buren Street Energy
Dissipator Project (the Project) has been completed by the Contractor, Drew Cook &
Sons Excavating Company, Inc. of Dubuque, IA (Contractor), and the City Engineer has
examined the work and signed a certificate stating that the Project has been completed
according to the terms of the Public Improvement Contract and that the City Engineer
recommends that the Project be accepted; and
WHEREAS, the final contract amount for the Project is $94,690.07; and
WHEREAS, the Contractor has previously been paid $89,955.56, leaving a retainage
balance of $4,734.51; and
WHEREAS, the City Council finds that the recommendation of the City Engineer
should be accepted.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA THAT:
Section 1. The recommendation of the City Engineer is approved, and the Project is
hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from the
Van Buren Storm Outlet CIP appropriations for the contract amount of $94,690.07 Tess
any retained percentage provided for therein as provided in Iowa Code.
Section 3. The Finance Director is hereby directed to pay to the Contractor the
balance of the retainage of $4,734.51 as provided in Iowa Code chapter 573, and to pay
such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa
Code chapter 26.13.
Passed, approved and adopted this 16th day of December 2019.
Attest:
Kevan S. Firnsta I, CIM/IC City Clerk
0
Roy`. Buol, Mayor
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE VAN �UREN
STREET ENERGY DISSIPATOR PROJECT
The unciersignec� City Engineer ofi the City �f Dub�aque, lowa, hereby certifies that
he has insp�;cted the Van �uren Street EnE,rgy Dissipafic�r Project, and thafi the Proj�ct
has been complPt�d in com�li�nce with the terms of the Puk�lic Improvement Cc�ntract,
��nd that the fic�t�l cost �f the completPd work is $111,538.14.
D�ted this � day of December 2�19.
:,
�_� ;
� � <\r .L�--
Gus Psihoyos, City Engineer
Filed in th� offic� of the City Clerk on tfie � day of DecPmber 201�.
' - - -�����
. � ,� .>t''
vin S. Firnst�iil, C C, City Clerk