Iowa Economic Development Authority- HUD National Disaster Resiliency Infrastructure Grant Update #13-NDRI-011 Copyrighted
January 21, 2020
City of Dubuque Consent Items # 12.
ITEM TITLE: lowa Economic DevelopmentAuthority- HUD National
Disaster Resiliency Infrastructure Grant Update
SUM MARY: City Manager recommending authorization for the Mayor to
sign a letter to the lowa Economic DevelopmentAuthority
outlining the budget status and possible amendment to
Contract#13-NDRI-011 associated with the Bee Branch
Watershed Flood Mitigation Project.
SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Approve
ATTACHMENTS:
Description Type
HUD National Disaster Resiliency Infrastructure Grant City Manager Memo
13-NDRI-011-MVM Memo
Staff Memo Staff Memo
Letterto IEDA Supporting Documentation
Attachment Supporting Documentation
Dubuque
THE CITY OF �
uI�AaMca cih
DuB E � �
I � � I
Maste iece on the Mississi i Zoo�•zoiz•zois
YP pp zoi�*zoi9
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Bee Branch Watershed Flood Mitigation Project, HUD National Disaster
Resilience Grant, Infrastructure Contract #13-NDRI-011, Letter to lowa
Economic Development Authority on the Budget Status and a Possible
Contract Amendment
DATE: January 15, 2020
Civil Engineer Deron Muehring requests City Council authorization for the Mayor to sign
a letter to the lowa Economic Development Authority outlining the budget status and
possible amendment to Contract #13-NDRI-011. Pursuant to the contract, the City is to
receive $23.3 million in HUD CDBG National Disaster Resilience Grant funding
specifically for infrastructure improvements associated with the Bee Branch Watershed
Flood Mitigation Project.
The lowa Economic Development Authority has requested that all grant sub-recipients,
such as the City of Dubuque, provide a letter outlining the budget status and the need
for any additional amendments to the funding contract. The main reason for the request
is to help the lowa Economic Development Authority determine if each grant sub-
recipient is on schedule to spend the money within the allotted timeframe. If the lowa
Economic Development Authority determines that a sub-recipient will not be able to
spend the funding by September 30, 2021, they may reallocate the funding to another
sub-recipient for their use. The letter outlines that the City is in a position to spend more
than the currently allotted funding and requests a possible amendment if additional
funding is available.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
v
Mic ael C. Van Milligen
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Teri Goodmann, Assistant City Manager
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Deron Muehring, Civil Engineer
2
Dubuque
THE CITY OF �
AII�America Cily
DuB E ,�,��� � ,
MaStC lECC 011 t�22 MiSS1S52 l zoo��zoiz�zois
rP Pp zoi�*zai9
TO: Michael C. Van Milligen, City Manager
FROM: Deron Muehring, Civil Engineer �n.
DATE: January 13, 2020
RE: Bee Branch Watershed Flood Mitigation Project, HUD National Disaster
Resilience Grant, Infrastructure Contract #13-NDRI-011, Letter to lowa
Economic Development Authority on the Budget Status and a Possible
Contract Amendment
INTRODUCTION
The purpose of this memorandum is to seek authorization to send a letter to the lowa
Economic Development Authority (IEDA) at their request outlining the budget status and
possible amendment to Contract#13-NDRI-011. Per Contract#13-NDRI-011, the City is
to receive $23.3 million in HUD CDBG National Disaster Resilience Grant funding
specifically for infrastructure improvements associated with the Bee Branch Watershed
Flood Mitigation Project.
BACKGROUND
Since 1999 there have been six Presidential Disaster Declarations due to the property
damage caused by flash flooding in the Bee Branch Watershed. While the Bee Branch
Watershed comprises just over 20% of the entire city by area, more than 50% of
Dubuque's population either lives or works in the watershed.
The sixth disaster (DR-4018) occurred in July of 2011 when a storm event stalled over
Northeast lowa and dropped more than 14 inches of rain in less than 12 hours on parts
of the city. The aftermath was devastating with the Bee Branch watershed hit hardest.
The city's storm drains were unable to handle the water, and substantial flash flooding
occurred, damaging elements of the drainage system, tearing up roads, and flooding
homes and businesses. The reports included 32 sewer back-ups, 259 requests for
basement pumping, and 47 sanitary/storm sewer maintenance requests.
In January 2016, the State was awarded $95.7 million in HUD National Disaster
Resiliency Competition grant funds to help lowa recover from the 2011 floods. Per the
award, the City of Dubuque is to receive $23.3 million for storm water infrastructure
improvements associated with the Bee Branch Watershed Flood Mitigation Project. The
infrastructure improvements are as follows:
1. Bee Branch Railroad Culvert Infrastructure Improvements involving the installation
Page 1 of 5
of culverts to pass stormwater through Canadian Pacific Railway (CPR) property at
506 Garfield Avenue — from the upper Bee Branch Creek to the lower Bee Branch
Creek;
2 22"a Street/Kaufmann Ave Storm Sewer Improvements involving the installation of a
large diameter storm sewer from 22nd & Elm up Kaufmann Avenue to the
Kaufmann & Kane intersection. The work includes inlets and local sewer
connections to the storm sewer and the complete reconstruction of the street and
other underground utilities along street right-of-way corridor; and
3. 17th StreetM/. Locust Street Storm Sewer Improvements involving the installation
of a 96-inch diameter pipe from the lower Bee Branch Creek through the CPR
tracks to 17th Street and continuing to the west along 17th Street and west along
W. Locust Street towards Angella St. The work includes inlets and local sewer
connections and the complete reconstruction of the street and other underground
utilities along street right-of-way corridor.
In October of 2016, the City Council adopted Resolution 362-16, authorizing the
execution of a funding contract with the lowa Economic Development Authority (IEDA)
as a requirement for the City's receipt of$23,309,600.00 in CDBG Disaster Recovery —
National Disaster Resiliency funds for the Bee Branch infrastructure improvements.
In September of 2017 the City Council authorized an amendment to the contract with
IEDA. The changes were deemed necessary based on IEDA's visit with the U. S.
Department of Housing and Urban Development (HUD) regarding the agreements
between IEDA and sub-recipients such as the City of Dubuque. HUD asked that specific
clauses and agreement terms be incorporated into the agreement between IEDA and
the City of Dubuque. The amendment also changed the overall grant amount to reflect
the actual amount of eligible, pre-award administrative costs versus the estimated costs
reflected in the original contract. It did not change the amount the City is to receive for
designing and constructing the actual infrastructure improvements.
DISCUSSION
As outlined in the funding contract between the City and IEDA, the City is to expend the
Community Development Block Grant Program Disaster Recovery — National Disaster
Resiliency (CDBG-NDR) funding by September 30, 2021 . With less than twenty months
left, IEDA has requested that all grant sub-recipients, such as the City of Dubuque,
provide a letter outlining the budget status and the need for any additional amendments
to the funding contract. The main reason for the request is to help IEDA determine if
each grant sub-recipient is on schedule to spend the money within the allotted
timeframe. If IEDA determines that a sub-recipient will not be able to spend the funding
by September 30, 2021 , they may reallocate the funding to another sub-recipient for
their use. The letter outlines that the City is in a position to spend more than the
currently allotted funding and requests a possible amendment if additional funding is
available.
Page 2 of 5
There are three activities provided for in the City's HUD CDBG NDR funding contract
with the IEDA. under which the City is to receive $23.3 million in CDBG Disaster
Recovery — National Disaster Resiliency funds for the infrastructure improvements. The
budget status of each is as follows:
Activity NDR Budget Expended to Remaining
Date Funds
172-01 [Watershed Planning] $35,753.00 $35,753.00 $0.00
181-01 [Administration] $157,500.00 $88,125.00 $69,375.00
69-01 [Watershed Improvements] $23,100,000.00 $14,076,935.00 $9,023,065.00
TOTALS $23,293,253.00 $14,200,813.00 $9,092,440.00
In addition to the amount expended to date, the City has awarded contracts and
committed to HUD-funded expenditures totaling $9,023,065.00 such that the entire
$23,100,000 budgeted for watershed improvements will be expended by September 30,
2021 . Moreover, the City has awarded contracts and committed to non-HUD funded
expenditures totaling $13,491 ,934.96 such that the entire $21 ,600,000 in direct leverage
(local match) for watershed improvements will be expended by September 30, 2021 .
Therefore, the $44,700,000 outlined in the State's application for Bee Branch watershed
infrastructure improvements will be expended by September 30, 2021 . The
improvements to be completed are as follows:
Pro�ect Work to Be Com leted'
Bee Branch Railroad Culvert Im rovements Culverts from Garfield Avenue throu h railroad ro ert
Bee Branch (22ntl)/Kaufmann Ave Storm Sewer 22�a Street from Elm Street to N. Main Street
Im rovements
Bee Branch (17'")/W. Locust Storm Sewer 17'" Street from Pine Street to Heeb Street
Im rovements
*To be completed by September 31, 2021.
The State is also interested in identifying those sub recipients that could expend
additional HUD CDBG NDR funding prior to December 31 , 2021 . The letter outlines that
the City is in such a position.
At the time of the State's application, the Bee Branch infrastructure improvements were
estimated to cost $50,055,373. The actual award was scaled back (scaled/scoping
alternative 2) which, along with the City's direct leverage, provided the aforementioned
$44,700,000 for the improvements. This left a $5 million funding gap. This gap
increased due to actual project costs exceeding the original estimates.
The original estimates for the improvements were prepared by a professional engineer
back in 2015. While the estimates included a 20°k contingency, the grant application did
not reflect higher project costs due to inflation. So, when the project improvements were
bid three to four years after the application, a shortfall could be expected. According to
Engineering News-Record (a technical publication that provides construction news,
analysis, commentary and data), the general cost of construction grew by 9.9°k from
2015 to 2018 (ENR, March 19/26, 2018). And the cost of materials required for the Bee
Page 3 of 5
Branch infrastructure improvements grew at even higher rates. For example, from 2015
to 2018 the cost of structural steel (materials required to constructed reinforced box
culverts) grew by more than 43°k (ENR). These higher than anticipated project costs
were realized when the City began bidding the work. The City bid the Bee Branch Creek
Railroad Culverts Project in early 2019. The low bid submitted was $27.9 million, $9.9
million (or 55°k) more than the $18.0 million estimate outlined in the HUD CDBG-NDR
grant application. While to a lesser extent, the bids for the other Bee Branch
infrastructure work have been similarly higher than anticipated. As a result, the project
limits have been necessarily truncated, leaving additional work for the future (see table
below).
Pro�ect Remainin Work'
Bee Branch Railroad Culvert NA
Infrastructure Im rovements
Bee Branch (22"')/Kaufmann Ave N. Main Street to Kane Street
Storm Sewer Im rovements
Bee Branch (17'")/W. Locust Storm Heeb Street to Rosedale Ave
Sewer Im rovements
'Work remaining after the current $23.1 million in HUD CDBG-NDR funding is exhausted.
With the improvements designed (and Section 106 clearance granted), the City is in a
position to move forward with bidding additional improvements without delay. If an
additional $22,680,000 were made available, the City would be able to expend the
funds on the improvements outlined above by September 30, 2021 . A breakdown is as
follows:
Pro�ect Additional Work Estimated Cost'
Bee Branch (22"')/Kaufmann Ave N. Main Street to Hempstead Street $9,530,000
Storm Sewer Im rovements
Bee Branch (17'")/W. Locust Storm Heeb Street to Kirkwood Street $13,150,000
Sewer Im rovements
TOTAL $22,680,000
'Based on 2020 estimates.
The City is also in a position to use any fraction of that amount as well. Attachment A
shows the incremental costs of improvements along both Kaufmann Avenue and on 17�n
St.M/. Locust Street.
Any additional funding will help reduce the floodwaters that rush down 17�h StreetM/.
Locust Street and down Kaufmann Avenue, preventing property damage and making
those impacted low-to-moderate income residents more resilient to flooding.
Based on the information provided, the City requests that the funding contract be
amended in order to allocate the City more funding if additional funds are available.
Page 4 of 5
BUDGET
In addition to the HUD CDBG National Disaster Resilience Grant funding, per the
Contract, the City has committed to $21 ,600,000 for the improvements as local, Direct
Leverage. This is being done through a State Revolving Fund (SRF) loan specifically for
the Bee Branch Railroad Culvert Improvements, state sales tax increment through the
State Flood Mitigation Program, and local stormwater management utility fees.
No additional City funding would be required if more HUD CDBG-NDR funding was
made available to the City through a funding contract amendment.
REQUESTED ACTION
I respectfully request authorization for the Mayor to sign a letter to the lowa Economic
Development Authority outlining the budget status and possible amendment to the
funding contract related to the City's receipt of HUD CDBG-NDR funds for infrastructure
improvements associated with the Bee Branch Watershed Flood Mitigation Project.
Attach.
Cc: Gus Psihoyos, City Engineer
Teri Goodmann, Assistant City Manager
Jenny Larson, Director of Finance and Budget
John Tharp, Project Coordinator
Mark Schneider, Grant Administrator-ECIA
Page 5 of 5
PROJECT OVERVIEW ATTAC H M E N T A
End of previous
� phase 331+88
�`��'/y PROJECT LIMIT
�'T VALERIA STREET
PROPOSED CENTERLINE ��`�� STATION-80+95.32 � �
� VALERIA STREET �
w `� �
w
� E P:81+36.43� � �, ��� 80+0 �
� N: 3662817.87 � � �
Z E: 5683092.40 �
_
� BP:80+00.00 �
, �
PROPOSED CENTERLINE U PROJECT LIMITS N: 3662692.89� p
CUSHING STREET E: 5683147.11 / ) �
CUSHING STREET a �,�� ` �X�� � 330+00
o STATION=50+65.00
o � PROPOSED CENTERLINE %�
M n' KAUFM NN AVENUE 61+46 � Y
�
w _� u
J 0
� � � "'I I I L�— O
r L
� U� � _� �_J u � , �
� u �_� � _ o
W , T— _ ____ __ �_ � ROJECT LIMITS " Sti,� o
z + + + 32p+ ,+pp + + + + + �1_ NO T MAIN STREET �',�,'�i,� z
J — I I � I � I ' � � I � I � I � I STATION=70+50.00 �Fj, �
= KAUFM NN AVENUE Q
� . ,_,_, __ PROPOSED CENTERLINE
Q : _ _ _ NORTH MAIN STREET o
� � �--� , j� � _ -, � � � �
� i f � �I �
► i I�
I 328+50 �
N
- $1.788 M �
317+75 N
$5.8805 M $5.389 M $4.897 M $4.431 M $4.0395 M $3.648 M $3.2565 M 325+75 `�
$6.372 M � �
$2.865 M ; o
PROPOSED CENTERLINE �
KLEINE STREET w
w
_
PROJECT LIMITS �i
PROPOSED 10"PCC(REINFORCED) 59+50—�� KLEINE STREET Q
wSTATION=59+82.27 N
� ��
�-- �
PROPOSED PCC DRIVEWAY z �I
NOTE: CONTRACTOR TO TAKE PHOTOS OF THESE SIGNIFICANT ITEMS
THAT WILL BE REMOVED AND REINSTALLED AT THE INDIVIDUAL w z
PROPERTIES BEFORE THEY ARE REMOVED,AND AFTER. SOME OF ,.Js �
THESE ITEMS WILL NOT BE DISTURBED. WHERE EXISTING Total engineering ��
PROPOSED PCC SIDEWALK/STEPS POTENTIALLY HISTORIC LIMESTONE RETAINING WALLS ARE PRESENT —
AND IN DISREPAIR, NEW LIMESTONE WALLS CAN BE CONSTRUCTED. aC1CI COC1StC'UCtI0C1 �
StrsetAddress Wistorically SignificantFeatures Station RTILT cost estimate w
W
3Qfi IS�ufmann Ave. Limestone curb 327+Q0 RT 12-9-19 �
�� 316 Kaufmann Ave. Limestane frant step 326+75 RT �
PROPOSED 7 PCC PAVEMENT(UN-REINFORCED)
348 Kaufmann Ave. Limestone front step 324+25 RT
374 Kaufmann Ave. S�one retaining wall;'Limestone curb 321+00 RT �
379 Kaufmann Ave. Limestane curb 321+QQ LT (n
387 IS�ufmann Ave. Limestpne curb 32Q+50 LT w
4Qa Kaufmann Ave. Stane retaining wall 319+75 RT z
PROPOSED HMA DRIVE 469 Kaufmann Av�. Stone retaining wall±Limestone curb 318+75 LT Q
417 Kaufmann Ave. Stone retaining wall?Concrete front stoop 318+5Q LT e�
425 Kaufmann Av�. S4one re�aining wall 317+75 LT �
446 Kaufmann Ave. Brick carport!Stone retaining wall 316+5Q RT (�
45Q Kaufmann Ave. Concrete steps 315+25 RT 0��� Q
PROPOSED HMA PAVEMENT(INCLUDES C&G) 514 Kaufmann Av�. Limes�one curb 3�o+oa RT �
�
0
M
O
�
PROPOSED GRANULAR SURFACING O 50� 100� 200� �
(DRIVEWAY) �
SCALE 1" = 100' FEET a
DESIGN TEAM: IIW/STRAND CITY OF DUBUQUE PROJECT NUMBER: 1X0006 KAUFMANN AVE: MAIN ST. TO KANE ST. Page 1 of 4 SHEET: A.09 REV. 2-13-19
LI . 1 1'I J.1 J
N: 3664162.81 ATTAC H M E N T A
E: 5680812.19 �9 NGo��� �,� PROJECT OVERVIEW
11 � ��NG��� �'��� NOTE: CONTRACTOR TO TAKE PHOTOS OF THESE SIGNIFICANT ITEMS
s4 v0 THAT WILL BE REMOVED AND REINSTALLED AT THE INDIVIDUAL
�� PROPOSED CENTERLINE �� PROPERTIES BEFORE THEY ARE REMOVED,AND AFTER. SOME OF
�� + KANE STREET �� EP:21+13.72 THESE ITEMS WILL NOT BE DISTURBED. WHERE EXISTING
1^�Np ♦ ��tv �N: 3663942.78 POTENTIALLY HISTORIC LIMESTONE RETAINING WALLS ARE PRESENT
� E: 5681091.24 AND IN DISREPAIR, NEW LIMESTONE WALLS CAN BE CONSTRUCTED.
��� ' � � ����
� \� O L Street Rddress Wistorically Significant Features Station RTfLT
�,C�� 3Qfi IS�ufmann Ave. Limestpne curb 327+Q0 RT
� � a�'� PROPOSED CENTERLINE 316 Kaufmann Ave. Limestane frant step 326+75 RT
r300+00 � /� GREENFIELD STREET 348 Kaufmann Ave. Limestone front step 324+25 RT
Ii + a �,` � � 374 ISaufmann Ave. S�one retaining wall;'Limestone curb 321+00 RT
I �, � ' 379 IEaufmann Ave. Limestane curb 321+6Q LT
O,�k�Q 1� � �� 3 � 387 IS�ufmann Ave. Limestpne curb 32Q+50 LT
3 ��� � +� 4Qa Kaufmann Aae. S�one retaining wall 319+75 RT
� �` � ��� 409 Kaufmann Av�. S4one re�aining wall;Limes�one curb 318+75 LT
� � ` 417 Kaufmann Ave. Stane retaining wall?ConcreFe front stoop 318+5Q LT
`�
I �/...\ 425 Kaufmann Av�. Stone re�aining wall 317+75 LT
�4I 446 Kaufmann Ave. Brick carport'Stone retaining wall 316+5Q RT
X!`� 45a Kaufmann Ave. Con�rete steps 315+25 RT
BP: 10+00.00 BP:20+00.00� �..� 514 Kaufmann Aw�. Limes�one curb 31 Q+Oo RT
N: 3663983.85 N: 3663883.61 l
E: 5680820.57 E: 5680994.13 �� `.� z
w
����\ A o
PROPOSED CENTERLINE \� �,�✓ p
KAUFMANN AVENUE � �� �
��� �� � 0
,� ; x i / z
'�Q ��L � �� Q
� c � � �i EP:30+76.03 �
�� i� � �'�� N: 3663462.13 0
x
�Q' � �E: 5681366.15 �
�
rn
/ `9 JPv/ PROPOSED CENTERLINE o
� N
"��' `'��' VALERIA STREET �
' N
` X �
�
� ` PROPOSED CENTERLINE p
� � �` ��
KAUFMANN AVENUE w
PROPOSED 10"PCC(REINFORCED) /� �" 311+75 D =
� � $8.846 M �_� � � ��
���. I�� Q
BP:30+00.00� � , � I � � � N
PROPOSED PCC DRIVEWAY N: 3663428.22 � '''c,�, . I_� �_J �i __ �+ + U Z ��
E: 5681298.10 � ��,�, +'_ + � � � i m w
309+75 �� �
-- — �
$9.53 M �
— . � �, � D zi
PROPOSED PCC SIDEWALK/STEPS � �,� � � � � �
EP:41+68.78� � �
N: 3663253.29 •� � o �
E: 5681419.41 00+�'�' o �
w
PROPOSED 7 PCC PAVEMENT(UN-REINFORCED)
8.063 M
$7.6715M $7.280 M . 5 �
PROPOSED CENTERLINE � �
HEMPSTEAD STREET w I 312+75 u~j
PROPOSED HMA DRIVE � $8.4545 M �
��t�
z
BP:40+00.00 � Q �
N: 3663091.70� � �
PROPOSED HMA PAVEMENT(INCLUDES C&G) E: 5681370.67 a C�
w Total engineering O,g��. �
= and construction 1� Q
cost estimate �
,
M
PROPOSED GRANULAR SURFACING �2_g_�g �
�
(DRIVEWAY) �
0 50' 100' 200' %
SCALE 1" = 100' FEET a
DESIGN TEAM: IIW/STRAND CITY OF DUBUQUE PROJECT NUMBER: 1X0006 KAUFMANN AVE: MAIN ST. TO KANE ST. Page 2 of 4 SHEET: A.08 REV. 2-13-19
�3+35 ATTAC H M E N T A
5+50 6+50 10+00 11+00 12+00 F
7+50 $1 .52M $970,000 � >
$4.31 M $3.88M $3.45M '�i $2.40M $1 .94M
"9� � � BP:500+00.00 W �
z z �S N: 661330.62 =
Q w �2 � E: 6&1252.97 o F
Z
BP:800+00.00 � � S� PI:700+8 .43 � W
N: 3661028.08 p � � $ �N: 36610 6.15 �
E: 5683677.34 0 o E: 5683 .63 EP 501+Sp.00 Total Project Cost including
0 0 �o��oo N: 661193.41 construction, desi n en ineerin
x y� EP:801+00.00 o PI:9+33.30 E: 684313.59 9 9 g�
N: 3660934.59 m N: 366098425� Pes+s�, io+o � and construction engineering (typ.)
E: 5683717.71 E: 5683832.83 N: 36610 9.28 0
`E: 56838 1.74 �1+50 + E: 5684385.54 1g+20
801+00 1 � � N �
���5,,
3+00 4+00 / 'b 5+00 6+00 7+00 9+00 10 0 11 00 12 00 13+00 14+00 15+00 16+00 17+00 18+00
- �� - I � I- - �--f- � -r•••--•� - �•••..-f
W 17 H ST. ' { � soo+o - I + � E 17TH ST.
� EP: 18+p0.13
� z��5 �'2\ � 30+00 BP:10+00.00 BP:600 0.00 20+00 BP:20+00.00 � N: 3861339.78
� ,y g+00 � I N: 3661057.11 N: 36611 4.40 I N: 3661181.04 � E: 5684645.26
Bp:2+75.00 b BP:30+00. o E: 56&4001.33 E: 58841 .48 E: 5684285.24
PI:701+49.44 + o o PI:16+00.10
N: 3660723.52 k N: 3660933. $ N: 3680987.59 0 �+ � ? N: 3661251.03
E: 5683228.36 E: 5883715. + E: 5683875.45 � � � � N E: 5684443.93
ro
EP:31+00. � ��
d� EP:702+50.00
N: 3660&42.0 } N EP:10+g3. 0 u�i
E: 5683755. J N: 3660875.40 � N: 3660971.33 �
EP:21+34.40 p�+3q
� E: 5683915.64 F E: 5684038.77 � N: 3661057.86
73+09 Q �
�0 Z EP:601+5p.00 � E: 5684339.00 }
/ � Q N: 3860987.04 � w
GcP � E: 5684215.76 Q �
EP:73+09.13 / �' � Q
N: 3680694.32� s�. o
E: 5683543.05 '
LEGEND
❑ q��HMAALLEYS
❑ 7��HMA
� 8��PCC PAVEMENT(REINFORCED)
� 8��PCC PAVEMENT(UNREINFORCED)
❑ 7��PCC
❑ 6��PCC DRIVEWAY
0 50' 100' 200'
SCALE 1" = 100' FEET ❑ SIDEWALK
DESIGN TEAM: IIW/WHKS/STRAND CITY OF DUBUQUE PROJECT NUMBER: 1X0005 17TH/LOCUST- HEEB TO KIRKWOOD Page 3 of 4 SHEET: A.05 REV.
K:\8501.00- HUD RESILIENCI'�CAD\KIRKWOOD\WHKS\SHEETS\8501 A2 SHEETS PHASE 2.DWG 12/2/2019 2:41 PM TFREESE
EP:402+00.00 ATTAC H M E N T A
N: 3661377.81 F
NOR E: 5682053.02 0 �
N w
52+00 � � 57+50 58+50 59+50 60+50 61 +50
0 50' 100' $13.15M 62+50
SCALE 1" = 100' FEET $10.77M $10.34M $9.90M $9.47M $8.99M $8.54M
sP:aoo+oo.00 0
� N: 3661177.62 �+ + PC:63+28.54
603+00 E: 5682050.74� � 400+00 N: 61151.36
501+50 E: 82681.74�
\
o '
5p+00 51+00 53+00 54+00 55+00 56+00 58+00 59+00 60+00 61+00 62+00 63+00 �
- I � I- - +--H �- � - - - I � I- �\°
52 0o LOCU T ST.
�� BS
,A° � � ".�
BP:50+00.00 .�`�� � o � 57+ 0
N: 3661206.60 '� �EP:501+50.00 PT:64+90.31
E: 5681354.35 �EP:603+00.00 N: 3661183.94 N: 3661106.40 �
N: 366119120 E: 5681898.84 E: 5682835.49
��"`� E: 5681724.49 301+30
� 301+00
o BP:300+00.00
� o N: 3660958.39 �
,` � '° F BP:500+00.00 E: 568283429
�j � N: 368103423
�Q BP:600+00.00 W E: 5681889.57
�O N: 3661020.73 U 300+00
�\�� E: 5681477.63 w
a
1
64+3p eP:zoo+oo.00 �ev���
N: 366095328 Q' �
$7.40M E: 5683174.09� o���`� LEGEND
PC:900+gq.59 � C�� EP:201+00.00
0 50' 100' 200' �
SCALE 1�� = 100' FEET ���� E: 5683173.69� I E: 5683265.71 ❑ 4 HMAALLEYS
s`C�' "� �O �
y„_ `l� 200+00 ❑
�,�b 1 � 901+00 7"HMA
BP:900+00.00 pT:901+17.42
N: 3661031.77 N: 3660922.63 ,�
� E: 5683139.93 �\ �E: 5683171.84 y" � ❑ 8"PCC PAVEMENT(REINFORCED)
�� / 73+09
�4 65+OO�c66+00 67+00 68+00 70+00 71+00 72+00 73+00
� �� � + �- +� - -� + t I- t� � ❑ 8"PCC PAVEMENT(UNREINFORCED)
LOCUST ST. �
� b
� PT:64+9 .31 301+30 EP:901+27.89
N: 366110 40 EP:301+30.00 � 69+00 � \ ❑ 7"PCC
301+00 N: 3660913.58
N: 3661059.54 EP:73+09.13
E: 568283549 _ EP:101+00.00
E: 5683166.57
E: 5682975.95 N: 3660694.32
N: 3660908.39
BP:3 0+00.00 901+28 E: 5683175.48 �� Z+75 E: 5683543.05
� 101+00 � ❑ 6"PCC DRIVEWAY
N: 36 0958.39 100+OO�i
E: 58 283429 BP:2+75.00
F BP: 100+00.00� �• �. - �N: 3660723.52
300+00 � N: 3660841.25 �J g E: 5683228.36 ❑
� E: 5683101.37 � �.r SIDEWALK
W U ��
Z
Q
DESIGN TEAM: IIW/WHKS/STRAND CITY OF DUBUQUE PROJECT NUMBER: 1X0005 17TH/LOCUST- HEEB TO KIRKWOOD Page 4 of 4 SHEET: A.04 REV.
K:\8501.00- HUD RESILIENCI'�CAD\KIRKWOOD\WHKS\SHEETS\8501 A2 SHEETS PHASE 2.DWG 12/2/2019 2:41 PM TFREESE
THE CITY OF
DUB
Dubuque
E NhAmerica=City
1 I1T
Masterpiece on the Mississippi
2007.2012.2013
2017*2019
Ann Schmid
Disaster Recovery Team Leader
Iowa Economic Development Authority
RE: Contract #13-NDRI-011
Office of the Mayor
City Hall
50 West 13`h Street
Dubuque, IA 52001-4864
www.cityofdubuque.org
January 21, 2020
Dear Ms. Schmid,
Per your request, the City of Dubuque has reviewed the budget for our open National
Disaster Resiliency Grant (NDR). The following table shows the current budget by
activity as of December 31, 2019.
Total Budget by Activity:
Activity
NDR Budget
Expended to Date
Remaining Funds
172-01 [Watershed Planning]
$35,753.00
$35,753.00
$0.00
181-01 [Administration]
$157,500.00
$88,125.00
$69,375.00
69-01 [Watershed Improvements]
$23,100,000.00
$14,076,935.00
$9,023,065.00
Per IEDA's request, we are providing information on the proposed use of remaining
NDR funds, based on categories defined by IEDA:
A. Committed/Contracted - Not Yet Drawn
$9,023,065.00
(This is the amount of NDR eligible funds remaining on any open construction or consulting
contracts that you are committed to spending but have not drawn down yet)
B. Estimate of Planned Not Yet Contracted
$22,680,000.00
(This is the estimated amount of eligible NDR funds needed to complete projects with owner
commitment, where some project delivery such as engineering, inspection, environmental
review, etc. has been incurred but the project has not yet been contracted)
C. Estimate for Conceptual Projects
$0.00
(This is the amount of funding you think you could expend on projects that have not yet
received owner commitment, inspection and/or engineering, but might move forward to
completion prior to Sept. 2021)
We are also providing an accounting of the direct leverage to be expended by the City
on the watershed infrastructure improvements. As of December 31, 2019, the City has
open construction and/or consulting contracts totaling $13,491,934.96 in non -HUD NDR
Service People Integrity Responsibility Innovation Teamwork
funding that the City is committed to spending but has not been expended or drawn
down yet. See table below.
Budget Explanation:
Planned Expenditures
As indicated, the City has awarded contracts and committed to HUD -funded
expenditures totaling $9,023,065.00 such that the entire $23,100,000 budgeted for
watershed improvements will be expended by September 30, 2021. Moreover, the City
has awarded contracts and committed to non -HUD funded expenditures totaling
$13,491,934.96 such that the entire $21,600,000 in direct leverage for watershed
improvements will be expended by September 30, 2021. Therefore, the $44,700,000
outlined in the State's application for Bee Branch watershed infrastructure
improvements will be expended by September 30, 2021. The improvements to be
completed are as follows:
Project
Direct Leverage
Budget
Expended to
Date
Remaining
Funds
69-01 [Watershed Improvements]
$21,600,000.00
$11,301,392.75
$10,298,607.25
Budget Explanation:
Planned Expenditures
As indicated, the City has awarded contracts and committed to HUD -funded
expenditures totaling $9,023,065.00 such that the entire $23,100,000 budgeted for
watershed improvements will be expended by September 30, 2021. Moreover, the City
has awarded contracts and committed to non -HUD funded expenditures totaling
$13,491,934.96 such that the entire $21,600,000 in direct leverage for watershed
improvements will be expended by September 30, 2021. Therefore, the $44,700,000
outlined in the State's application for Bee Branch watershed infrastructure
improvements will be expended by September 30, 2021. The improvements to be
completed are as follows:
Project
Work to Be Completed*
Bee Branch Railroad Culvert Infrastructure
Improvements
Culverts from Garfield Avenue through
railroad property
Bee Branch (22nd)/Kaufmann Ave Storm Sewer
Improvements
Elm Street to N. Main Street
Bee Branch (17th)/W. Locust Storm Sewer
Improvements
Pine Street to Heeb Street
o be completed by September 31, 2021.
Possible Additional Expenditures
The improvements outlined for the Bee Branch watershed in the State's HUD NDR
application were described as three undertakings: The Bee Branch Railroad Culvert
Infrastructure Improvement Project, the Bee Branch Kaufmann Avenue Storm Sewer
Improvements Project, and the Bee Branch West Locust Storm Sewer Improvements
Project. At the time of the State's application, the improvements were estimated to cost
$50,055,373. The actual award was scaled back (scaled/scoping alternative 2) which,
along with the City's direct leverage, provided the aforementioned $44,700,000 for the
improvements. This left a $5 million funding gap. This gap has increased due to actual
project costs exceeding the original estimates.
The original estimates for the improvements were prepared by a professional engineer
back in 2015. While the estimates included a 20% contingency, the projects reflected in
the State's application for HUD funding did not reflect higher costs due to standard
inflation rates. So, when the project improvements were bid three to four years after the
application, a shortfall could be expected. According to Engineering News -Record (a
technical publication that provides construction news, analysis, commentary and data),
the general cost of construction grew by 9.9% from 2015 to 2018 (ENR, March 19/26,
2018). And the cost of materials required for the Bee Branch infrastructure
improvements grew at even higher rates. For example, from 2015 to 2018 the cost of
structural steel (materials required to constructed reinforced box culverts) grew by more
Service People Integrity Responsibility Innovation Teamwork
than 43% (ENR). These higher than anticipated project costs were realized when the
City began bidding the work. The City bid the Bee Branch Railroad Culvert
Infrastructure Improvement Project in early 2019. The low bid received came in at $27.9
million, $9.9 million (or 55%) more than the $18.0 million estimate outlined in the grant
application. To a lesser extent, the bids for the other Bee Branch infrastructure work
have been similarly higher than anticipated. As a result, the project limits have been
necessarily truncated, leaving additional work for the future (see table below).
Project
Remaining Work
Bee Branch Railroad Culvert
Infrastructure Improvements
NA
Bee Branch (22"tl)/Kaufmann
Ave Storm Sewer Improvements
N. Main Street to Kane Street
Bee Branch (17th)/W. Locust
Storm Sewer Improvements
Heeb Street to Rosedale Ave
As stated above, the City is in a position to bid and complete an additional $22,680,000
in improvements. This is based on the final design of the 17th Street/W. Locust Street
improvements and the 22nd Street/Kaufmann Avenue improvements. A breakdown is as
follows:
Project
Additional Work
Estimated Cost*
Bee Branch (22"d)/Kaufmann
Ave Storm Sewer Improvements
N. Main Street to Hempstead Street
$9,530,000
Bee Branch (17th)/VV. Locust
Storm Sewer Improvements
Heeb Street to Kirkwood Street
$13,150,000
TOTAL
$22,680,000
*Based on 2020 estimates.
With the improvements designed (and Section 106 clearance granted), the City is in a
position to move forward with bidding the improvements without delay. If an additional
$22,680,000 were made available, the City would be able to expend the funds on the
improvements outlined above by September 30, 2021. The City is also in a position to
use any fraction of that amount as well. Attachment A shows the incremental costs of
improvements along both Kaufmann Avenue and on 17th St./W. Locust Street. For
example, with an additional $1.52 million the City could
Additional funding will reduce the floodwaters that rush down both 17th Street/W. Locust
Street and down Kaufmann Avenue, preventing property damage and making those
impacted low -to -moderate income residents more resilient to flooding.
As a result of the above information, the City requests that if additional funds are
available, please adjust our budget by increasing NDR funds as deemed appropriate for
Bee Branch infrastructure improvements [69-01 (Watershed Improvements)].
Si - :Iy,
Ric W. Jones, Mayor Pro Tem
Service People Integrity Responsibility Innovation Teamwork
C.D.B.G. Funding - IowaGrants.gov
Single Audit Form
Recipient: Dubuque
Contract Number: 13-NDRI-011
Award Date:
End Date:
October 11, 2016
September 30, 2021
2 CFR Part 200 changed the threshold of required audits from entities awarded federal funds. If a unit of
local government or non-profit organization has expended $750,000 or more in federal funds from any
federal sources or programs during a fiscal year, that entity is required to have these funds audited in
accordance with the implementing regulations found in 2 CFR Part 200.
Entities that have not expended $750,000 in federal funds in a fiscal year are not required to have an audit
performed.
As part of the Single Audit Act requirements, IEDA is required to advise you of the Catalog of Federal
Domestic Assistance (CFDA) Number of the program through which the grantee received funding. The
CFDA number for the CDBG — National Disaster Resiliency program is 14.272
After reviewing the audit requirements described above, check one of the boxes below and have this form
signed by the appropriate official of your organization. The completed form, with the original signature,
MUST be returned to your Grant Administrator at:
East Central Intergovernmental Association
Attn: Mark Schneider
7600 Commerce Park
Dubuque, Iowa 52002
Your grant administrator will then upload an electronic copy of this signed form to the Audit Document
Component in lowaGrants.
NOTE TO GRANT ADMINISTRATOR: Please e-mail Khristy.Smith@iowaeda.com once the electronic
copy of the Single Audit Form has been uploaded into lowaGrants.
I certify that No is Audit Required e Audit is Required (will be available J a n 2021 )
For fiscal year 2020
4,„41
Signature
Mr. Roy Buol
July 9, 2020
Date
NOTE: IEDA must receive this form back within 30 days of receipt.