Award of Millwork District Parking Lot #1 ProjectCopyrighted March 16, 2020 City of Dubuque Action Items # 2. ITEM TITLE: Award of Millwork District Parking Lot#1 Project SUMMARY: City Manager recommending award of the Millwork District Parking Lot #1 Project construction contract to the low bidder Eastern Iowa Excavating & Concrete, LLC. SUGGESTED DISPOSITION: RESOLUTION Awarding public improvement project for the Millwork District Parking Lot #1 Project Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type Millwork District Parking Lot 1-MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Bid Tab Supporting Documentation Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Millwork District Parking Lot 1 Award Public Improvement Construction Contract CIP 3602250 DATE: March 6, 2020 Dubuque bitil All-A.aia City 111111 2007.2012.2013 2017*2019 Sealed bids were received for the Millwork District Parking Lot 1 Project. City Engineer Gus Psihoyos recommends award of the construction contract to the low bidder, Eastern Iowa Excavating & Concrete, LLC, in the amount of $468,830.12, which is 18.75% below the estimate of probable cost. I concur with the recommendation and respectfully request Mayor and City Council approval. /-. Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the .Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Millwork District Parking Lot 1 Award Public Improvement Construction Contract CIP 3602250 DATE: March 6, 2020 Dubuque Maria r7.11:124.14. 11111, 2007.2012.2013 2017*2019 INTRODUCTION The purpose of this memorandum is to provide the City Council with information related to the recommendation to award the public improvement construction contract for the Millwork District Parking Lot 1 Project. BACKGROUND In 2010, Gronen Properties, Wilmac Property Co and Warehouse Trust provided a letter to the City requesting public development of 470 off-street parking spaces to assist with attraction of commercial and residential tenants in the newly developed district. The 12th & Elm St surface parking lot will bring the total number of City -owned parking spaces in the Historic Millwork District to 580 spaces. It should also be noted the Development Agreement with Dupaco Voices, LLC and the City of Dubuque states "City shall develop an additional City surface parking lot at 12th and Elm Street on the east side of Elm Street, on or before December 31, 2020." DISCUSSION The FY20 budget includes $375,460 carried from FY19 budget to continue the development of public parking within the Historic Millwork District. The FY21 budget requests funding in the amount of $589,000 for Millwork District Parking Improvements. The project consists of the construction of a 71 stall concrete parking lot. The parking lot construction will also include storm sewer, lighting, surveillance cameras, fiber optics, conduit and landscaping. Also, included in this project is the landscaping and surveillance cameras for the parking lot the City built in 2018 east of the True fitness as part of the City's commitment to parking in the Millwork District. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process Publish Notice to Bidders, Advertise for Bids Publish Public Hearing Notice on Plans & Specifications Public Hearing on Plans & Specifications Receipt of Bid Proposals (Bid -Letting) Award Construction Contract Project Completion Date February 17, 2020 February 21, 2020 February 21, 2020 March 2, 2020 March 5, 2020 March 16, 2020 October 30, 2020 BID RESULTS Sealed bids were received on the project by the City Clerk on March 5, 2020. Eastern Iowa Excavating & Concrete, LLC, of Cascade, IA submitted the low bid in the amount of $468,830.12. This amount is 18.75% below the estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Name Total Bid Eastern Iowa Excavating & Concrete, LLC $468,830.12 Drew Cook & Sons Excavating Co. Inc. $476,832.79 Midwest Concrete, Inc. $488,836.11 MDE, LLC dba McDermott Excavating $502,857.60 Portzen Construction, Inc. $537,068.05 Horsfield Construction, Inc. $599,427.75 Tschiggfrie Excavating Co. $613,752.25 RECOMMENDATION I recommend that the public improvement construction contract for the Millwork District Parking Lot 1 Project be awarded to Eastern Iowa Excavating & Concrete, LLC of Cascade, IA, in the amount of $468,830.12. BUDGET IMPACT The estimate of probable cost for the Millwork District Parking Lot 1 Project is as follows: Description Estimate Award Construction Contract $574,740.00 $468,830.12 Contingency $57,474.00 57,474.00 Design / Contract Admin / Construction Engineering $94,832.00 94,832.00 Total Project Cost $ 727,046.00 $621,136.12 The project funding summary is as follows: CIP Funding Source Amount 3602250 FY 20 Millwork District Parking Improvements $375,460.00 3602250 Requested FY 21 Millwork District Parking Improvements Available Project Funding $245,676.12 $621,136.12 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the public improvement construction contract for the Millwork District Parking Lot 1 Project to Eastern Iowa Excavating & Concrete, LLC, of Cascade, IA, in the amount of $468,830.12. cc: Jon Dienst, Civil Engineer II Todd Irwin, Engineering Tech John Klostermann, Public Works Director Renee Tyler, Transit Manager RESOLUTION NO. 92-20 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE MILLWORK DISTRICT PARKING LOT #1 PROJECT Whereas, sealed proposals have been submitted by contractors for the Millwork District Parking Lot #1 project, (the Project) pursuant to Resolution No. 54-20 and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 19th day of February 2020. Whereas, said sealed proposals were opened and read on the 5th day of March 2020 and it has been determined that Eastern Iowa Excavating & Concrete, LLC of Cascade, Iowa, submitted low bid in the amount of $468,830.12, and is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA THAT: A Public Improvement Contract for the Project is hereby awarded Eastern Iowa Excavating & Concrete, LLC and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, adopted and approved this 16th day of March 2020. D. Buol, Mayor Attest: Kev)n S Firnstahl, CMC, City Clerk Masterpiece an the Mississippi LINE NO. Project Name: REFERENCE NUMBER City of Dubuque, Iowa Bid Tabulation Millwork District - Parking Lot 1 BID ITEM DESCRIPTION Division 2010 - Earthwork, Subgrade, and Subbase 1 2010-108-D-1 Topsoil, On -site 2 2010-108-D-3 Topsoil, Off -site 3 2010-108-E-0 Excavation, Class 13 4 2010-108-1-0 Subbase, Special Backlll - Gradation 30 5 2010-108-L-0 Compaction Testing Division 3010 - Trench Excavation and Backgll 6 3010-108-A-0 Bedding Material, 1" Commercial Clean Stone 7 3010-108-D-0 Replacement of Unsuitable Backfil Material Gradation 30 8 3010-108-F-0 Trench Compaction Testing 9 3010-108-1-0 Trenching, 26 Inch Depth Division 4020 - Storm Sewers 10 4020-108-A-1 Storm Sewer Gravity Main, Trenched, 15" RCP 11 4020-108-D-0 Removal of Storm Sewer Division 6010 - Structures for Sanitary and Storm Sewers 12 6010-108-A-0 Manhole Type, PC, 48" SW-401 13 6010-108-B-0 Intake Type, CIP, SW-501 14 6010-108-H-0 Remove intake Division 7010 - Portland Cement Concrete Pavement 15 7010-108-A-0 Pavement, PCC, 7" (Thickness) 16 7010-108-E-0 Curb and Gutter, 30' (Width), 8" (Thickness) Division 7030 - Sidewalks, Shared Use Paths, and Driveways 17 7030-108-C-0 Shared Use Path, PCC, 5" (Thickness) 18 7030-108-G-0 Detectable Miming Division 7040 - Pavement Rehabilitation 19 7040-108-A-0 Full Depth Patches HMA 20 7040-108-H-0 Pavement - Removal 21 7040-108-1-0 Curb and Gutter - Removal Division 6010 -Traffic Signals & Lighting 22 8010-108-C-0 Hantlhde, PC, Round, HH 24-24 23 8010-108-C-0 Hantlhde, Composite, HH 11-18 24 8010-108-E-0 Fiber Vault, Composite, Cone, FVR 36-48 25 8010-108-G-0 Connections, Ezlsting Handholes and Vaults 26 8010-108-H-0 Conduit, PVC, 2" 27 8010-108-J-0 Viking and Cable - Power 28 8010-108-J-0 Wiring and Cable -Tracer 29 8010-108-J-0 W idng and Cable - Category 6E 30 8010-108-J-0 Wiring and Cable- Fiber Optics, 12 Strand 31 8010-108-K-0 Footings and Foundations, Street Light, PC, 2' Dia. x 5' 32 8010-108-K-0 Footings and Foundations, Street Light, PC, 2' Dia. x T 33 8010-108-K-0 Footings and Foundations, Multi -Use Cabinet, PC 34 8010-108-L-0 Bonding and Grounding 35 8010-108-M-0 Cabinets and Pedestals, Multi -Use Cabinet 36 8010-108-N-0 Street Light, Type DM 37 8010-108-N-0 Camera Pole, Painted, 12' 38 8010-108-P-0 Relocate, Edsting Light Pole and PC Base 39 8010-108-P-0 Relocate, Edsting Handhole or Vault 40 8010-108-R-0 Cameros, Traffic & Surveillance, Fixed 41 8010-108-R-0 Cameros, Traffic & Surveillance, 180 Deg !DOT Division 2527 - Pavement Marking 42 IDOT 2527.04-A-0 Parking Space Markings (Yellow) 43 IDOT 2527.04-A-0 WCSW: Wheelchair Symbol (White) 44 8020-108-G-0 Painted Symbols and Legends Division 9010 - Seeding 45 9010-108-B-0 Hydraulic- Seeding, Fertilizing, and Mulching, Type 1 46 9010-108-D-0 Watering Division 9030 - Plant Material and Planting 47 9030-108-A-0 Landscaping Complete, Lot 1 48 9030-108-A-0 Landscaping Complete, Lot 2 49 9040-108-A-2 50 9040-108-A-3 51 9040-108-N-1 52 9040-108-N-3 53 9040-108-0-2 54 9040-108-T-1 55 9040-108-T-2 Division 9040 - Erosion and Sediment Control Bid Date 5-Mar-20 Engineer's Estimate PLAN QUANTRY UNR ESTIMATED UNIT PRICE TOTAL PRICE Eastern Iowa Excavating & Concrete, LLC BID UNR PRICE TOTAL PRICE Drew Cook & Sons Excavating Inc. BID UNR PRICE TOTAL PRICE Midwest Concrete Inc. BID UNR PRICE TOTAL PRICE McDermott Excavating BID UNR PRICE TOTAL PRICE Portxen Construction Inc. BID UNR PRICE TOTAL PRICE Horsfleld Construction, Inc. BID UNR PRICE TOTAL PRICE Tschlggfde Excavating Co. BID UNR PRICE TOTAL PRICE 93 CY $ 9.40 $ 874.20 $ 13.85 $ 1,288.05 $ 15.00 $ 1,395.00 $ 10.00 $ 930.00 $ 10.00 $ 930.00 $ 14.00 $ 1,302.00 $ 30.00 $ 2,790.00 $ 19.00 $ 1,767.00 300 CY $ 65.00 $ 19,500.00 $ 32.50 $ 9,750.00 $ 35.00 $ 10,500.00 $ 33.00 $ 9,900.00 $ 60.00 $ 18,000.00 $ 45.00 $ 13,500.00 $ 40.00 $ 12,000.00 $ 25.00 $ 7,500.00 795 CY $ 8.80 $ 6,996.00 $ 17.25 $ 13,713.75 $ 12.00 $ 9,540.00 $ 13.50 $ 10,732.50 $ 5.00 $ 3,975.00 $ 19.00 $ 15,105.00 $ 30.00 $ 23,850.00 $ 20.00 $ 15,900.00 1300 TON $ 20.00 $ 26,000.00 $ 16.25 $ 21,125.00 $ 16.30 $ 21,190.00 $ 16.50 $ 21,450.00 $ 17.00 $ 22,100.00 $ 16.25 $ 21,125.00 $ 20.00 $ 26,000.00 $ 26.00 $ 33,800.00 1 LS $ 1,500.00 $ 1,500.00 $ 2,150.00 $ 2,150.00 $ 2,026.00 $ 2,026.00 $ 1,500.00 $ 1,500.00 $ 2,000.00 $ 2,000.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,800.00 $ 2,800.00 Sub Total $ 54,870.20 Sub Total $ 48,026.80 Sub Total $ 44,651.00 Sub Total $ 44,512.50 Sub Total $ 47,005.00 Sub Total $ 53,532.00 Sub Total $ 67,140.00 Sub Total $ 61,767.00 60 TON $ 20.00 $ 1,200.00 $ 20.85 $ 1,251.00 $ 25.00 $ 1,500.00 $ 23.06 $ 1,383.60 $ 20.00 $ 1,200.00 $ 28.00 $ 1,680.00 $ 20.00 $ 1,200.00 $ 29.00 $ 1,740.00 150 TON $ 24.00 $ 3,600.00 $ 22.85 $ 3,427.50 $ 22.00 E 3,300.00 $ 19.50 $ 2,925.00 $ 24.00 $ 3,600.00 $ 26.00 $ 3,900.00 $ 40.00 $ 6,000.00 $ 26.00 $ 3,900.00 1 LS $ 750.00 $ 750.00 $ 2,100.00 $ 2,100.00 $ 678.00 $ 678.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 2,500.00 $ 2,500.00 $ 2,000.00 $ 2,000.00 $ 1,700.00 $ 1,700.00 1095 LF $ 10.00 $ 10,950.00 $ 4.50 $ 4,927.50 $ 4.00 $ 4,380.00 $ 5.58 $ 6,110.10 $ 3.75 $ 4,106.25 $ 8.00 $ 8,760.00 $ 7.00 $ 7,665.00 $ 6.80 $ 7,446.00 Sub Total $ 16,500.00 Sub Total $ 11,706.00 Sub Total $ 9,858.00 Sub Total $ 11,918.70 Sub Total $ 10,406.25 Sub Total $ 16,840.00 Sub Total $ 16,865.00 Sub Total $ 14,786.00 211.1 LF $ 25.00 $ 5,277.50 $ 88.75 $ 18,735.13 $ 48.00 $ 10,132.80 $ 51.00 $ 10,766.10 $ 42.00 $ 8,866.20 $ 58.00 $ 12,243.80 $ 70.00 $ 14,777.00 $ 57.00 $ 12,032.70 10 LF $ 10.00 $ 100.00 $ 31.25 $ 312.50 $ 20.00 $ 200.00 $ 50.00 $ 500.00 $ 85.00 $ 850.00 $ 28.00 $ 280.00 $ 50.00 $ 500.00 $ 32.00 $ 320.00 Sub Total $ 5,377.50 Sub Total $ 19,047.63 Sub Total $ 10,332.80 Sub Total $ 11,266.10 Sub Total $ 9,716.20 Sub Total $ 12,523.80 Sub Total $ 15,277.00 Sub Total $ 12,352.70 20.68 VF $ 350.00 $ 7,238.00 $ 195.00 $ 4,032.60 $ 527.00 $ 10,898.36 $ 520.00 $ 10,753.60 $ 335.00 $ 6,927.80 $ 450.00 $ 9,306.00 $ 500.00 $ 10,340.00 $ 490.00 $ 10,133.20 21.83 VF $ 450.00 $ 9,823.50 $ 493.00 $ 10,762.19 $ 670.00 $ 14,626.10 $ 675.00 $ 14,735.25 $ 550.00 $ 12,006.50 $ 600.00 $ 13,098.00 $ 550.00 $ 12,006.50 $ 770.00 $ 16,809.10 1 EA $ 500.00 $ 500.00 $ 650.00 $ 650.00 $ 1,430.00 $ 1,430.00 $ 750.00 $ 750.00 $ 500.00 $ 500.00 $ 700.00 $ 700.00 $ 1,000.00 $ 1,000.00 $ 680.00 $ 680.00 Sub Total $ 17,561.50 Sub Total $ 15,444.79 Sub Total $ 26,954.46 Sub Total $ 26,238.85 Sub Total $ 19,434.30 Sub Total $ 23,104.00 Sub Total $ 23,346.50 Sub Total $ 27,622.30 2934 SY $ 55.00 $ 161,370.00 $ 38.25 $ 112,225.50 $ 43.50 $ 127,629.00 $ 41.00 $ 120,294.00 $ 50.50 $ 148,167.00 $ 48.25 $ 141,565.50 $ 55.00 $ 161,370.00 $ 55.00 $ 161,370.00 217 LF $ 35.00 $ 7,595.00 $ 24.50 $ 5,316.50 $ 22.00 $ 4,774.00 $ 25.00 $ 5,425.00 $ 25.50 $ 5,533.50 $ 31.00 $ 6,727.00 $ 35.00 $ 7,595.00 $ 31.00 $ 6,727.00 Sub Total $ 168,965.00 Sub Total $ 117,542.00 Sub Total $ 132,403.00 Sub Total $ 125,719.00 Sub Total $ 153,700.50 Sub Total $ 148,292.50 Sub Total $ 168,965.00 Sub Total $ 168,097.00 119 SY $ 45.00 $ 5,355.00 $ 33.75 $ 4,016.25 $ 46.00 $ 5,474.00 $ 48.00 $ 5,712.00 $ 51.00 $ 6,069.00 $ 54.00 $ 6,426.00 $ 60.00 $ 7,140.00 $ 46.00 $ 5,474.00 24 SF $ 40.00 $ 960.00 $ 40.25 $ 966.00 $ 36.00 $ 864.00 $ 40.00 $ 960.00 $ 28.00 $ 672.00 $ 40.00 $ 960.00 $ 50.00 $ 1,200.00 $ 66.00 $ 1,584.00 Sub Total $ 6,315.00 Sub Total # $ 4,982.25 Sub Total # $ 6,338.00 Sub Total # $ 6,672.00 Sub Total # $ 6,741.00 Sub Total # $ 7,386.00 Sub Total $ 8,340.00 Sub Total $ 7,058.00 96 SY $ 65.00 $ 6,240.00 $ 74.00 $ 7,104.00 $ 51.00 $ 4,896.00 $ 61.20 $ 5,875.20 $ 65.00 $ 6,240.00 $ 66.00 $ 6,336.00 $ 75.00 $ 7,200.00 $ 50.00 $ 4,800.00 96 SY $ 15.00 $ 1,440.00 $ 15.50 $ 1,488.00 $ 11.50 $ 1,104.00 $ 15.00 $ 1,440.00 $ 20.00 $ 1,920.00 $ 16.00 $ 1,536.00 $ 25.00 $ 2,400.00 $ 20.00 $ 1,920.00 217 LF $ 8.00 $ 1,736.00 $ 3.65 $ 792.05 $ 17.00 $ 3,689.00 $ 12.00 $ 2,604.00 $ 6.00 $ 1,302.00 $ 7.00 $ 1,519.00 $ 5.00 $ 1,085.00 $ 9.40 $ 2,039.80 Sub Total $ 9,416.00 Sub Total $ 9,384.05 Sub Total $ 9,689.00 Sub Total $ 9,919.20 Sub Total $ 9,462.00 Sub Total $ 9,391.00 Sub Total $ 10,685.00 Sub Total $ 8,759.80 5 EA $ 800.00 $ 4,000.00 $ 910.00 $ 4,550.00 $ 701.00 $ 3,505.00 $ 1,800.00 $ 9,000.00 $ 1,200.00 $ 6,000.00 $ 1,825.00 $ 9,125.00 $ 2,000.00 $ 10,000.00 $ 1,600.00 $ 8,000.00 10 EA $ 500.00 $ 5,000.00 $ 390.00 $ 3,900.00 $ 321.00 $ 3,210.00 $ 1,350.00 $ 13,500.00 $ 855.00 $ 8,550.00 $ 550.00 $ 5,500.00 $ 750.00 $ 7,500.00 $ 900.00 $ 9,000.00 1 EA $ 2,100.00 $ 2,100.00 $ 2,750.00 $ 2,750.00 $ 2,420.00 $ 2,420.00 $ 4,650.00 $ 4,650.00 $ 2,910.00 $ 2,910.00 $ 3,500.00 $ 3,500.00 $ 3,500.00 $ 3,500.00 $ 2,800.00 $ 2,800.00 2 EA $ 200.00 $ 400.00 $ 275.00 $ 550.00 $ 81.00 $ 162.00 $ 1,325.00 $ 2,650.00 $ 275.00 $ 550.00 $ 300.00 $ 600.00 $ 250.00 $ 500.00 $ 280.00 $ 560.00 2,130 LF $ 3.50 $ 7,455.00 $ 3.85 $ 8,200.50 $ 1.88 $ 4,004.40 $ 1.73 $ 3,684.90 $ 1.78 $ 3,791.40 $ 2.60 $ 5,538.00 $ 4.00 $ 8,520.00 $ 11.00 $ 23,430.00 3,225 LF $ 3.50 $ 11,287.50 $ 0.65 $ 2,096.25 $ 0.75 $ 2,418.75 $ 0.62 $ 1,999.50 $ 0.65 $ 2,096.25 $ 1.10 $ 3,547.50 $ 1.25 $ 4,031.25 $ 0.85 $ 2,741.25 1,000 LF $ 0.75 $ 750.00 $ 0.42 $ 420.00 $ 0.40 $ 400.00 $ 0.41 $ 410.00 $ 0.50 $ 500.00 $ 1.40 $ 1,400.00 $ 1.50 $ 1,500.00 $ 0.73 $ 730.00 2,971 LF $ 3.00 $ 8,913.00 $ 2.85 $ 8,467.35 $ 2.76 $ 8,199.96 $ 2.66 $ 7,902.86 $ 2.70 $ 8,021.70 $ 2.75 $ 8,170.25 $ 3.00 $ 8,913.00 $ 3.20 $ 9,507.20 400 LF $ 13.00 $ 5,200.00 $ 8.00 $ 3,200.00 $ 7.82 $ 3,128.00 $ 7.69 $ 3,076.00 $ 7.85 $ 3,140.00 $ 8.00 $ 3,200.00 $ 8.00 $ 3,200.00 $ 9.30 $ 3,720.00 1 EA $ 750.00 $ 750.00 $ 1,425.00 $ 1,425.00 $ 908.42 $ 908.42 $ 1,600.00 $ 1,600.00 $ 1,100.00 $ 1,100.00 $ 1,200.00 $ 1,200.00 $ 1,500.00 $ 1,500.00 $ 2,000.00 $ 2,000.00 10 EA $ 1,000.00 $ 10,000.00 $ 1,350.00 $ 13,500.00 $ 942.00 $ 9,420.00 $ 1,600.00 $ 16,000.00 $ 1,300.00 $ 13,000.00 $ 1,325.00 $ 13,250.00 $ 1,500.00 $ 15,000.00 $ 2,300.00 $ 23,000.00 1 EA $ 2,500.00 $ 2,500.00 $ 2,750.00 $ 2,750.00 $ 450.00 $ 450.00 $ 2,600.00 $ 2,600.00 $ 900.00 $ 900.00 $ 3,200.00 $ 3,200.00 $ 3,000.00 $ 3,000.00 $ 2,400.00 $ 2,400.00 1 EA $ 1,800.00 $ 1,800.00 $ 810.00 $ 810.00 $ 801.00 $ 801.00 $ 800.00 $ 800.00 $ 800.00 $ 800.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 830.00 $ 830.00 1 EA $ 3,500.00 $ 3,500.00 $ 750.00 $ 750.00 $ 732.00 $ 732.00 $ 702.00 $ 702.00 $ 725.00 $ 725.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 2,300.00 $ 2,300.00 10 EA $ 6,500.00 $ 65,000.00 $ 5,500.00 $ 55,000.00 $ 5,354.00 $ 53,540.00 $ 5,375.00 $ 53,750.00 $ 5,500.00 $ 55,000.00 $ 5,600.00 $ 56,000.00 $ 6,000.00 $ 60,000.00 $ 6,500.00 $ 65,000.00 1 EA $ 2,200.00 $ 2,200.00 $ 1,650.00 $ 1,650.00 $ 1,632.00 $ 1,632.00 $ 1,600.00 $ 1,600.00 $ 1,610.00 $ 1,610.00 $ 1,500.00 $ 1,500.00 $ 1,750.00 $ 1,750.00 $ 2,100.00 $ 2,100.00 1 EA $ 2,700.00 $ 2,700.00 $ 985.00 $ 985.00 $ 470.00 $ 470.00 $ 2,290.00 $ 2,290.00 $ 500.00 $ 500.00 $ 1,500.00 $ 1,500.00 $ 2,000.00 $ 2,000.00 $ 2,200.00 $ 2,200.00 1 EA $ 400.00 $ 400.00 $ 285.00 $ 285.00 $ 391.00 $ 391.00 $ 1,475.00 $ 1,475.00 $ 1,000.00 $ 1,000.00 $ 900.00 $ 900.00 $ 1,000.00 $ 1,000.00 $ 1,600.00 $ 1,600.00 6 EA $ 2,500.00 $ 15,000.00 $ 2,075.00 $ 12,450.00 $ 2,055.00 $ 12,330.00 $ 2,025.00 $ 12,150.00 $ 2,053.00 $ 12,318.00 $ 2,100.00 $ 12,600.00 $ 2,000.00 $ 12,000.00 $ 2,400.00 $ 14,400.00 11 EA $ 2,700.00 $ 29,700.00 $ 2,100.00 $ 23,100.00 $ 2,092.00 $ 23,012.00 $ 2,075.00 $ 22,825.00 $ 2,100.00 $ 23,100.00 $ 2,200.00 $ 24,200.00 $ 2,000.00 $ 22,000.00 $ 2,400.00 $ 26,400.00 Sub Total $ 178,655.50 Sub Total # $ 146,839.10 Sub Total # $ 131,134.53 Sub Total # $ 162,665.26 Sub Total # $ 145,612.35 Sub Total # $ 157,930.75 Sub Total $ 168,914.25 Sub Total $ 202,718.45 58 EA $ 75.00 $ 4,350.00 $ 23.50 $ 1,363.00 $ 22.00 $ 1,276.00 $ 22.75 $ 1,319.50 $ 25.00 $ 1,450.00 $ 25.00 $ 1,450.00 $ 30.00 $ 1,740.00 $ 45.00 $ 2,610.00 4 EA $ 300.00 $ 1,200.00 $ 325.00 $ 1,300.00 $ 300.00 $ 1,200.00 $ 310.00 $ 1,240.00 $ 330.00 $ 1,320.00 $ 300.00 $ 1,200.00 $ 150.00 $ 600.00 $ 45.00 $ 180.00 2 EA $ 150.00 $ 300.00 $ 27.00 $ 54.00 $ 25.00 $ 50.00 $ 26.00 $ 52.00 $ 30.00 $ 60.00 $ 350.00 $ 700.00 $ 150.00 $ 300.00 $ 170.00 $ 340.00 Sub Total $ 5,850.00 Sub Total # $ 2,717.00 Sub Total # $ 2,526.00 Sub Total # $ 2,611.50 Sub Total # $ 2,830.00 Sub Total # $ 3,350.00 Sub Total $ 2,640.00 Sub Total $ 3,130.00 0.5 AC $ 2,500.00 $ 1,250.00 $ 13,500.00 $ 6,750.00 $ 12,000.00 $ 5 MGAL $ 110.00 $ 550.00 $ 500.00 $ 2,500.00 $ 145.00 $ Sub Total $ 1,800.00 Sub Total # $ 9,250.00 Sub Total # $ 1 LS $ 30,000.00 $ 30,000.00 $ 11,500.00 $ 11,500.00 $ 10,787.00 1 LS $ 25,000.00 $ 25,000.00 $ 12,500.00 $ 12,500.00 $ 11,498.00 Sub Total $ 55,000.00 Sub Total # $ 24,000.00 Sub Total # $ 6,000.00 $ 12,360.00 $ 6,180.00 $ 12,660.00 $ 6,330.00 $ 13,200.00 $ 6,600.00 $ 15,000.00 $ 7,500.00 $ 13,400.00 $ 6,700.00 725.00 $ 145.00 $ 725.00 $ 155.00 $ 775.00 $ 160.00 $ 800.00 $ 150.00 $ 750.00 $ 160.00 $ 800.00 6,725.00 Sub Total # $ 6,905.00 Sub Total # $ 7,105.00 Sub Total # $ 7,400.00 Sub Total $ 8,250.00 Sub Total $ 7,500.00 10,787.00 11,498.00 22,285.00 $ 11,111.00 $ 11,845.00 Sub Total # $ 11,111.00 $ 11,350.00 $ 11,350.00 $ 12,000.00 $ 12,000.00 $ 13,000.00 $ 13,000.00 $ 12,000.00 $ 12,000.00 11,845.00 $ 12,100.00 $ 12,100.00 $ 13,000.00 $ 13,000.00 $ 14,000.00 $ 14,000.00 $ 12,800.00 $ 12,800.00 22,956.00 Sub Total # $ 23,450.00 Sub Total # $ 25,000.00 Sub Total $ 27,000.00 Sub Total $ 24,800.00 Stormwater Pollution Prevention Plan (SWPPP)Management 1 LS $ 500.00 $ 500.00 $ 950.00 $ 950.00 $ 650.00 $ 650.00 $ 1,500.00 $ 1,500.00 $ 600.00 $ 600.00 $ 2,000.00 $ 2,000.00 $ 2,500.00 $ 2,500.00 $ 4,500.00 $ 4,500.00 Stomwater Pollution Prevention Plan (SW PPP) Qualifying Rainfall Event Inspecl 5 EA $ 150.00 $ 750.00 $ 50.00 $ 250.00 $ 150.00 $ 750.00 $ 150.00 $ 750.00 $ 150.00 $ 750.00 $ 100.00 $ 500.00 $ 500.00 $ 2,500.00 $ 270.00 $ 1,350.00 SIB Fence or Silt Fence Ditch Check, Installation 935 LF $ 3.00 $ 2,805.00 $ 2.25 $ 2,103.75 $ 3.00 $ 2,805.00 $ 3.00 $ 2,805.00 $ 2.00 $ 1,870.00 $ 3.00 $ 2,805.00 $ 6.00 $ 5,610.00 $ 3.90 $ 3,646.50 Silt Fence or Silt Fence Ditch Check, Removal of Device 935 LF $ 1.00 $ 935.00 $ 1.25 $ 1,168.75 $ 1.00 $ 935.00 $ 2.00 $ 1,870.00 $ 1.00 $ 935.00 $ 1.00 $ 935.00 $ 3.00 $ 2,805.00 $ 1.10 $ 1,028.50 Stabilized Construction Entrance by Ton 30 TON $ 30.00 $ 900.00 $ 35.50 $ 1,065.00 $ 20.00 $ 600.00 $ 35.00 $ 1,050.00 $ 20.00 $ 600.00 $ 35.00 $ 1,050.00 $ 25.00 $ 750.00 $ 64.00 $ 1,920.00 Inlet Protection Device, Installation 2 EA $ 100.00 $ 200.00 $ 75.00 $ 150.00 $ 175.00 $ 350.00 $ 250.00 $ 500.00 $ 100.00 $ 200.00 $ 250.00 $ 500.00 $ 300.00 $ 600.00 $ 330.00 $ 660.00 Inlet Protection Device, Maintenance 2 EA $ 25.00 $ 50.00 $ 60.00 $ 120.00 $ 65.00 $ 130.00 $ 250.00 $ 500.00 $ 150.00 $ 300.00 $ 100.00 $ 200.00 $ 150.00 $ 300.00 $ 170.00 $ 340.00 Sub Total $ 6,140.00 Sub Total # $ 5,807.50 Sub Total # $ 6,220.00 Sub Total # $ 8,975.00 Sub Total # $ 5,255.00 Sub Total # $ 7,990.00 Sub Total $ 15,065.00 Sub Total $ 13,445.00 Division 9070 - Landscape Retaining Walls 56 9070-108-B-0 Limestone Retaining Wall Division 10 - Demolition of Building Structures 57 10010-108-A-0 Demolition Work Division 11,010 - Construction Survey 58 11010-108-A-0 Construction Survey Division 11,020 - Mobilization 264 SF $ 60.00 $ 15,840.00 $ 82.00 $ 21,648.00 $ 69.00 $ 18,216.00 $ 71.25 $ 18,810.00 $ 72.50 $ 19,140.00 $ 77.00 $ 20,328.00 $ 85.00 $ 22,440.00 $ 84.00 $ 22,176.00 Sub Total $ 15,840.00 Sub Total $ 21,648.00 Sub Total $ 18,216.00 Sub Total $ 18,810.00 Sub Total $ 19,140.00 Sub Total $ 20,328.00 Sub Total $ 22,440.00 Sub Total $ 22,176.00 1 LS $ 2,500.00 $ 2,500.00 $ 4,250.00 $ 4,250.00 $ 3,500.00 $ 3,500.00 $ 5,000.00 $ 5,000.00 $ 5,500.00 $ 5,500.00 $ 6,500.00 $ 6,500.00 $ 15,000.00 $ 15,000.00 $ 6,200.00 $ 6,200.00 Sub Total $ 2,500.00 Sub Total # $ 4,250.00 Sub Total # $ 3,500.00 Sub Total # $ 5,000.00 Sub Total # $ 5,500.00 Sub Total # $ 6,500.00 Sub Total $ 15,000.00 Sub Total $ 6,200.00 1 LS $ 6,500.00 $ 6,500.00 $ 9,500.00 $ 9,500.00 $ 8,900.00 $ 8,900.00 $ 9,167.00 $ 9,167.00 $ 9,500.00 $ 9,500.00 $ 10,000.00 $ 10,000.00 $ 9,000.00 $ 9,000.00 $ 9,900.00 $ 9,900.00 Sub Total $ 6,500.00 Sub Total # $ 9,500.00 Sub Total # $ 8,900.00 Sub Total # $ 9,167.00 Sub Total # $ 9,500.00 Sub Total # $ 10,000.00 Sub Total $ 9,000.00 Sub Total $ 9,900.00 59 11020-108-A-0 Mobilization 1 LS $ 25,000.00 $ 25,000.00 $ 18,000.00 $ 18,000.00 $ 36,600.00 $ 36,600.00 $ 15,000.00 $ 15,000.00 $ 27,500.00 $ 27,500.00 $ 26,000.00 $ 26,000.00 $ 20,000.00 $ 20,000.00 $ 22,600.00 $ 22,600.00 Sub Total $ 25,000.00 Sub Total # $ 18,000.00 Sub Total # $ 36,600.00 Sub Total # $ 15,000.00 Sub Total # $ 27,500.00 Sub Total # $ 26,000.00 Sub Total $ 20,000.00 Sub Total $ 22,600.00 Division 11,050 - Concrete Washout 60 11050-108-A-0 Concrete Washout 1 LS $ 750.00 $ 750.00 $ 685.00 $ 685.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 1,500.00 $ 1,500.00 $ 500.00 $ 500.00 $ 840.00 $ 840.00 Sub Total $ 750.00 Sub Total # $ 685.00 Sub Total # $ 500.00 Sub Total # $ 500.00 Sub Total # $ 500.00 Sub Total # $ 1,500.00 Sub Total $ 500.00 Sub Total $ 840.00 % Over / Under (-) Total Est. $ 577,040.70 Total Bid $ 468,830.12 Total Bid $ 476,832.79 Total Bid $ 488,836.11 Total Bid $ 502,857.60 Total Bid $ 537,068.05 Total Bid $ 599,427.75 Total Bid $ 613,752.25 -18.75% -17.37% -15.29% -12.86% -6.93% 3.88% 6.36%