Loading...
Cedar Street Force Main Air Vacuum Release Valve Replacement Project_AwardCity of Dubuque ITEM TITLE: SUMMARY: SUGGESTED DISPOSITION: Copyrighted April 6, 2020 Action Items # 1. Award Cedar Street Force Main Air Vacuum Release Valve Replacement Project City Manager recommending award of the Cedar Street Force Main Air Vacuum Release Valve Replacement Project public improvement construction contract to the low bidder Tschiggfrie Excavating Co. RESOLUTION Awarding public improvement contract for the Cedar Street Force Main Air Vacuum Release Valve Replacement Project Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Cedar Street Force Main Air Vacuum Release Replacement Project-MVM Memo Staff Memo Resolution Type City Manager Memo Staff Memo Resolutions Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager Dubuque bitil All-A.aia City 111111 2007.2012.2013 2017*2019 SUBJECT: Cedar Street Force Main Air Vacuum Release Valve Replacement Project Award Construction Contract CIP #710-2606 DATE: March 31, 2020 Sealed bids were received for the Cedar Street Force Main Air Vacuum Release Valve Replacement Project. Project Manager Steve Sampson Brown recommends award of the public improvement construction contract to the low bidder, Tschiggfrie Excavating Co., in the amount of $132,955, which is 1.6% below the estimate of probable cost of $135,000. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Steve Sampson Brown, Project Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C Van Milligen - City Manager FROM: Steve Sampson Brown — Project Manager DATE: March 27, 2020 RE: Dubuque Alberta City WYI't1NAL� Ilk 11.1, I I I I I 2007+2012*2013 2017*2019 Cedar Street Force Main Air Vacuum Release Valve Replacement Project Award Construction Contract CIP #: 710-2606 INTRODUCTION The purpose of this memorandum is to provide the City Council with information related to the recommendation to award the public improvement construction contract for the Cedar Street Force Main Air Vacuum Release Valve Replacement Project. BACKGROUND In general, a force main system is comprised of lift stations and pressurized sanitary sewer pipes known as force mains. Each component of the sanitary sewer utility lift station and force main system requires periodic evaluation and improvements so that they remain in reliable condition and can fulfill their vital role in conveying the City's wastewater to the treatment plant. Approximately 80% of wastewater that flows to the Water & Resource Recovery Center (W&RRC) for treatment arrives via the City's Cedar Street and Terminal Street lift stations through a 30" and then 42" force main pipe network. The existing 42" force main which runs between the Terminal Street Lift Station and the W&RRC was constructed in 1977 and is made of prestressed concrete cylinder pipe. The Cedar/Terminal force main system is beginning to show signs of wear and there is a need to evaluate and plan for system improvements. DISCUSSION In June of 2019 the City Council authorized the release of a Request for Proposals (RFP) related to selecting a vendor to conduct a remote, internal pipe inspection of the 42" force main. After a vendor was selected, city staff and the project's consulting engineer from Strand Associates, Inc. worked with the pipe inspection vendor to determine the best insertion location for the inspection tool and the project schedule. The existing valve vault at the intersection of 14th Street and Sycamore Street was the selected location for inserting the tool. In order to make this location ready to receive the pipe inspection tool, several modifications to the concrete value vault and force main piping are required. This project will make the needed modifications which include replacement of air release/vacuum valve on the Cedar Street force main. Replacement will consist of demolition and modifications to the existing valve vault structure, Page 1 of 3 excavation and placement of a new structure top slab with improved access doors, and various ductile iron pipe work including new air/vacuum valves, pipe restoration, and other minor items. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process Publish Notice to Bidders, Advertise for Bids Publish Public Hearing Notice on Plans & Specifications Public Hearing on Plans & Specifications Receipt of Bid Proposals (Bid -Letting) Award Construction Contract Final Project Completion Date March 2, 2020 March 4, 2020 March 6, 2020 March 16, 2020 March 19, 2020 April 6, 2020 May 7, 2020 BID RESULTS Two bid proposals were received on the project by the City Clerk on March 19, 2020 and opened live via YouTube. Tschiggfrie Excavating Company, of Dubuque, IA submitted the low bid in the amount of $132,955.00. This amount is 1.6% below the estimate of probable cost of $135,000. A summary of the bid proposals received is as follows: Contractor Name Total Bid Tschiggfrie Excavating Company $132,955.00 MDE, LLC dba McDermott Excavating $198,835.00 RECOMMENDATION I recommend that the public improvement construction contract for the Cedar Street Force Main Air Vacuum Release Valve Replacement Project be awarded to Tschiggfrie Excavating Co. of Dubuque, IA, in the amount of $132,955.00. BUDGET IMPACT The estimate of probable cost for this project is summarized as follows: Description Estimate Award Construction Contract — Base Bid $135,000.00 $132,955.00 Contingency (10%) $13,500.00 $13,500.00 Contract Admin $4,500.00 $4,500.00 Total Project Cost $152,550.00 $150,955.00 Page 2 of 3 The funding summary for the Cedar Street Force Main Air Vacuum Release Valve Replacement Project is as follows: CIP Funding Source Amount 710-2606 Cedar and Terminal Street Force Mains and Lift Station Assessment and Improvements Project $644,580.00 Total Available Project Funding $644,580.00 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the public improvement construction contract for the Cedar Street Force Main Air Vacuum Release Valve Replacement Project to Tschiggfrie Excavating, Company of Dubuque, IA, in the amount of $132,955.00. Attachments SSB/ssb cc: Gus Psihoyos — City Engineer John Klostermann — Public Works Director Willie O'Brien — W&RRC Manager Deron Muehring - Civil Engineer Todd Irwin — Engineering Technician F:\PROJECTS\Sanitary\Cedar-Terminal Lift Stations and FMs Assessment\Internal Pipe Inspection\City Council Documentation\1_Initiate\Cedar St FM Air Vacuum Release Valve Replacement Award Memo 02.27.2020.docx Page 3 of 3 RESOLUTION NO. 116-20 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE CEDAR STREET FORCE MAIN AIR VACUUM RELEASE VALVE REPLACEMENT PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Whereas, sealed proposals have been submitted by contractors for Cedar Street Force Main Air Vacuum Release Valve Replacement Project, (the Project) pursuant to Resolution No. 76-20 and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 3rd day of March 2020. Whereas, said sealed proposals were opened and read on the 19th day of March 2020 and it has been determined that Tschiggfrie Excavating Company of Dubuque, Iowa, submitted low bid in the amount of $132,955.00, and is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded Tschiggfrie Excavating Company and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, adopted and approved this 6th day of April 2020. Roy D. Buol, Mayor Attest: Kevi . Firnstahl, MC, ity Clerk