I have attached two estimates for repairs in the Port of Dubuque Ramp that occurred
when the water lines broke this past winter.
The first one is from Westphal Electric. This one is for the area where the sprinkler
pipes broke in the west bathroom areas. We have had this area evaluated by KJWW
Engineers and this estimate is a product of their plans and specifications to provide
sufficient heating in the area to prevent further damage. The large cost is partially due
to insufficient power in the area for the added heaters. The contract for Westphal is
$30,749.00 and I did receive a competitive bid from Paulson Electric for $32,580.00 for
the same project. I would like to have Westphal do the work as soon as possible.
The second issue is the drain pipes that froze in the ventilation towers that drain the roof
of these towers. These need to be replaced and also heat tapes installed in the pipes.
Again, the situation is such that insufficient power is in the area. So this project
included electrical and plumbing. I have gotten bids from Modern Piping and Paulson
Electric for a total of $32,835.00 on this repair project. This project has been reviewed
by engineers on board with Whitfield and Eddy, the law firm working on the litigation file
for the ramp.
We also have approximately $30,000 in cost for KJWW to engineer the repairs for these
projects.
These costs will be referred to the original CIP for the project and will reduce the
interest revenue that remains. This has been approved by Bill Noth in a meeting we
had with you and Barry Lindahl.
POD Ramp Repair Approval
March 24, 2010
Page 11
Would you please review and approve if you see appropriate so that I can get the work
underway. The attorneys in the litigation have been provided all of the estimates and
specifications in the project and are recommending getting the work completed.
I would be happy to answer any questions you may have on this matter.
Thanks.
cc: Dave Heiar, E.D. Director
(3/23/2010) Corey Firzlaff - Westphal Port Of Dubuque Ramp Heaters.doc __ — – Page 1
", �A , &CO lANY,lltC.
electrical construction
750 Cedar Cross Road, P.O. Box 1023, Dubuque, IA 52004 -'1023
Phone: 563 -583 -5749 Fax: 563- 588 -3202
March 1, 2010
Cory Firzlaff
Parking Department
Dubuque, IA. 52001
Re: Quote for installation of new electrical panel, and heaters at casino ramp.
Cory,
WESTPHAL & COMPANY INC. proposes the following quote.
Install electrical per plans and specs, for the sum of $30,749.00
This quote includes the following items.
• Supply and install (1) new 480v 100A I -Line breaker.
• Supply and install (1) new 480v 100A panelboard.
• Supply and install (19) branch circuit breakers.
• Supply and install (16) cabinet heaters.
• Supply and install (3) ceiling hung unit heaters.
• Supply all necessary material and labor for complete installation.
This quote does not include balancing of the heating system.
This quote is good for 30 days. All work is quoted to be done on regular straight
time hours. If you have any questions please feel free to contact me,
Regards,
WESTPHAL & COMPANY INC.
Thomas H Wirzbach
Shop Superintendent /Estimator
twirzbach @westphalec.com
03/10/2010 WED 9:47 FAX 862 2987 Madera Piping
MODERN PIPING INC.
....... .. . MECHANICAL CONTRACTORS .. .
City of Dubuque- parkiug division
Attn: Tim Horsefield
RE: Diamond Jo Parking Ramp
Roof Drain Leader Replacement
Exclude:
1. Overtime.
2. General Construction.
We propose to furnish necessary labor, material, equipment, and supervision for the above
referenced project as per our walk through and the following scope of work.
Include:
1. Furnish removal of existing broken piping in two towers.
2. Furnish and install new drain leaders up two towers (approx. 200' -3" piping.)
3. Furnish set up and tear down of scaffolding to access the piping.
4. Furnish electrical for heat tracing, (see attached electrical quote)
5. Equipment rental.
6. Furnish pipe insulation.
)):
7. Sales Tax.
8. Consumables.
Option 1: Cast Iron replacement amount: $21,280.00
Option 2: PVC replacement amount: $19,700.00
Thank You for the opportunity to quote this project.
If you have any questions please give me a caul.
Wendy II " ler
Modem Piping, Inc.
Project Manager
Phone: 563 -584 -0551
Fax: 563 -584 -0553
W b esl er(um o dernpiping. com
3/9/2010 1
March 9, 2010
Modern Quote # 10 -266
0001/002
03/10/2010 WED 9:47 FAX 862 2987 Modern Piping 002/002
March 9, 2010
• Wendy Besler
Modern Piping
10760 Diesel Dr.
Dubuque, IA 52001
This will consist of the following scope of work:
1) Install heat trace in 2 new roof drains
2) Install 2 controllers.
3) Install 2 GFC1, 30ma breakers
4) Install conduit and wire in the towers.
5) Pull new feeds in existing conduits to the panels.
Thank you for the opportunity to quote this project.
PAULSON ELECTRIC COMPANY OF DUBUQUE
leytt
Lennie Thielen
Project Manager
au1
ckdric
=maw
Paulson Electric Company
685 Century Drive
P.O. Box 1625
Dubuque, lA 62004
563 -588 -2373
563- 588 -1827 (fax)
RE: Parking Ramp Heat Tape
Wendy,
Paulson Electric has a cost of $11,555.00 for the work associated with installing the heat
tape system on 2 roof drains in the Bell Street parking ramp.
Quote is based on pulling additional wires for heat tapes in existing conduits. If for some
reason these conduits are not useable, there would be an additional cost to run new
conduit. One of the existing conduits feeding one of the towers is in need of repair before
the wire can be pulled. We reviewed the broken conduits with Corey Firzlaff with the
City of Dubuque when we looked at his project. Any questions, please call.