Contract/Bond_Midwest Excavating, Inc. for 2020 Asphalt Overlay Project OneCopyrighted
May 18, 2020
City of Dubuque Consent Items # 18.
ITEM TITLE: Improvement Contracts / Performance, Payment and
Maintenance Bonds
SUMMARY: Midwest Concrete, Inc. for the 2020 Asphalt Overlay Ramp
Project One
SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Approve
ATTACHMENTS:
Description
Contract/Bond - Midwest Concrete, Inc.
Type
Supporting Documentation
SECTION 00500
Page 1 of 6
PUBLIC IMPROVEMENT CONTRACT
SECTION 00500
2020 ASPHALT OVERLAY RAMP PROJECT ONE
THIS IMPROVEMENT CONTRACT (the Contract), made in triplicate, dated for references
purposes the 21 st day April 2020 between the City of Dubuque, Iowa, by its City Manager, through
authority conferred upon the City Manager by its City Council (City), and Midwest Concrete, Inc.
(Contractor).
For and in consideration of the mutual covenants herein contained, the parties hereto agree
as follows:
CONTRACTOR AGREES:
1. To furnish all material and equipment and to perform all labor necessary for the 2020 Asphalt
Overlay Ramp Project One.
2. CONTRACT DOCUMENTS
A. The Contract Documents consist of the following:
1. Project Title Page (Section 00100).
2. Project Directory Page (Section 00101).
3. This Public Improvement Contract (Section 00500).
4. Performance, Payment, and Maintenance Bond (Section 00600).
5. Out -of -State Contractor Bond (Section 00610).
6. The Iowa Statewide Urban Design And Specifications (SUDAS) 2020 Edition.
7. CITY OF DUBUQUE Supplemental Specifications 2020 Edition.
8. Other Standard and Supplementary Specifications as listed on the Title Page of the
Contract Document Manual.
9. Special Provisions included in the project Contract Document Manual.
10. Drawings -Sheet No. A.1 through No. D.4 (11 pages) or drawings consisting of
sheets bearing the following general title:
2020 Asphalt Overlay Ramp Project One
11. Any Addenda issued.
12. Insurance Provisions and Requirements (Section 00700).
13.Sales Tax Exemption Certificate (Section 00750).
14. Site Condition Information (Section 00775).
15. Construction Schedule and Agreed Cost of Delay (Section 00800).
16. Erosion Control Certificate (Section 00900).
17. Exhibits to this Contract
a. Contractor's Bid
b. Bidder Status Form (Section 00460).
SECTION 00500
Page 2of6
c. The following documentation that must be submitted by Contractor prior to Notice
of Award.
18.The following which may be delivered or issued on or after the Effective Date of the
Agreement:
a. Notice to Proceed (Section 00850).
b. Project Certification Page (Section 00102).
c. Change Orders (Not attached to this agreement).
There are no other Contract Documents. The Contract Documents may only be amended,
modified, or supplemented as provided in General Conditions.
3. All materials used by the Contractor in the Project must be of the quality required by the
Contract Documents and must be installed in accordance with the Contract Documents.
4. The Contractor must remove any materials rejected by the City as defective or improper, or
any of said work condemned as unsuitable or defective, and the same must be replaced or
redone to the satisfaction of the City at the sole cost and expense of the Contractor.
5. Five percent (5%) of the Contract price will be retained by the City for a period of thirty (30)
days after final completion and acceptance of the Project by the City Council to pay any claim
by any party that may be filed for Tabor and materials done and furnished in connection with
the performance of this Contract and for a longer period if such claims are not adjusted within
that thirty (30) day period, as provided in Iowa Code Chapter 573 or Iowa Code Chapter 26.
The City will also retain additional sums to protect itself against any claim that has been filed
against it for damages to persons or property arising through the prosecution of the work and
such sums will be held by the City until such claims have been settled, adjudicated or
otherwise disposed of.
6. The Contractor has read and understands the Contract Documents herein referred to and
agrees not to plead misunderstanding or deception related to estimates of quantity,
character, location or other conditions for the Project.
7 In addition to any warranty provided for in the specifications, the Contractor must also fix any
other defect in any part of the Project, even if the Project has been accepted and fully paid
for by the City. The Contractor's maintenance bond will be security for a period of two years
after the issuance of the Certificate of Substantial Completion.
8. The Contractor must fully complete the Project under this Contract on or before the date
indicated in the Construction Schedule and Agreed Cost of Delay Section of the Contract
Documents.
9. INDEMNIFICATION FROM THIRD PARTY CLAIMS. To the fullest extent permitted by law,
Contractor shall defend, indemnify and hold harmless City, its officers and employees, from
and against all claims, damages, losses and expenses claimed by third parties, but not
including any claims, damages, losses or expenses of the parties to this Contract, including
but not limited to attorneys' fees, arising out of or resulting from performance of this Contract,
provided that such claim, damages, loss or expense is attributable to bodily injury, sickness,
disease or death, or injury to or destruction of property, including loss of use resulting there
from, but only to the extent caused in whole or in part by negligent acts or omissions of
Contractor, or anyone directly or indirectly employed by Contractor or anyone for whose acts
Contractor may be liable, regardless of whether or not such claim, damage, loss or expense
is caused in part by a party indemnified hereunder.
SECTION 00500
Page 3 of 6
10. The Contractor hereby represents and guarantees that it has not, nor has any other person
for or in its behalf, directly or indirectly, entered into any arrangement or Contract with any
other Bidder, or with any public officer, whereby it has paid or is to pay any other Bidder or
public officer any sum of money or anything of value whatever in order to obtain this Contract;
and it has not, nor has another person for or in its behalf directly or indirectly, entered into
any Contractor arrangement with any other person, firm, corporation or association which
tends to or does lessen or destroy free competition in the award of this Contract and agrees
that in case it hereafter be established that such representations or guarantees, or any of
them are false, it will forfeit and pay not less than ten percent (10%) of the Contract price but
in no event Tess than $2,000.00 (Two Thousand Dollars) to the City.
11. The surety on the Bond furnished for this Contract must, in addition to all other provisions,
be obligated to the extent provided for by Iowa Code 573.6 relating to this Contract, which
provisions apply to said Bond.
12. The Contractor agrees, and its Bond is surety therefore, that after the Certificate of
Substantial Completion has been issued by the City, it will keep and maintain the Project in
good repair for a period of two (2) years.
13. The Project must be constructed in strict accordance with the requirements of the laws of the
State of Iowa, and the United States, and ordinances of the City of Dubuque, and in
accordance with the Contract Documents.
A. All applicable standards, orders, or regulations issued pursuant to the Clean Air Act of
1970 (42 U. S. C. 1958 (H) et. seq.) and the Federal Water Pollution Act (33 U. S. C.
1368 et. seq.) as amended, Executive Order 11738, and Environmental Protection
Agency regulations (40 CFR, Part 15). Contractor must comply with Section 103 and
107 of the Contract Work Hours and Safety Standards Act (40 USC 327-330) and
Department of Labor Regulations (29 CFR, Part 5).
B. The City of Dubuque in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat.
252, 42 U.S.C. 2000d-2000d-4 and Title 49, Code of Federal Regulations, Department
of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in
Federally assisted programs of the Department of Transportation issued pursuant to
such Act, hereby notifies all bidders that it will affirmatively insure that in any contract
entered into pursuant to this advertisement, minority business enterprises will be
afforded full opportunity to submit bids in response to this invitation and will not be
discriminated against on the grounds of race, color, national origin, sex, age, or disability
in consideration for an award.
14.
SECTION 00500
Page 4 of 6
CONSENT DECREE
RELATING TO THE PROJECT
THIS CONTRACTOR IS PERFORMING WORK FOR THE CITY OF DUBUQUE RELATED TO
THE WATER & RESOURCE RECOVERY CENTER OR THE SANITARY SEWER
COLLECTION SYSTEM. THEREFORE, THE CONSENT DECREE AND THIS SECTION ARE
APPLICABLE.
71 CITY ` CONTRACTOR
THIS CONTRACTOR IS NOT PERFORMING WORK FOR THE CITY OF DUBUQUE
RELATED TO THE WATER & RESOURCE RECOVERY CENTER OR THE SANITARY
SEWER COLLECTION SYSTEM. THEREFORE THE CONSENT DECREE AND THIS
SECTION ARE NOT APPLICABLE.
The City has entered into a Consent Decree in the case of The United States of America, and the State
of Iowa v. The City of Dubuque, Iowa, Civil Action Number Case 2:11-cv-01011-EMJ, Civil Action
Number 2008V00041, DOJ Case Number 90-5-1-1-09339, United States District Court for the Northern
District of Iowa. The provisions of the Consent Decree apply to and are binding upon the City and its
officers, directors, employees, agents, servants, successors, assigns, and all persons, firms and
corporations under contract with the City to perform the obligations of the Consent Decree.
The City is required to provide a copy of the Consent Decree to any contractor or consultant retained to
perform work required by the Consent Decree.
A copy of the Consent Decree is included in the Contract Documents and can be viewed at
''nv,ko,‘/.&;^.fdub_,e.:(7,.,,Jccurren:Certer'Hor.-e;`'/e\r,3173. A hard copy is available upon
request at the City's Engineering Department Office.
The City must condition any contract to perform work required under the Consent Decree upon
performance of the work in conformity with the provisions of the Consent Decree.
The Consent Decree also provides that until five (5) years after the termination of the Consent Decree,
the City must retain, and must instruct its contractors and agents to preserve, all non -identical copies of
all documents, reports, data, records, or other information (including documents, records, or other
information in electronic form) in its or its contractors' or agents' possession or control, or that come into
its or its contractors' or agents' possession or control, and that relate in any manner to the City's
performance of its obligations under this Consent Decree, including any underlying research and
analytical data. This information -retention period, upon request by the United States or the State, the
City must provide copies of any documents, reports, analytical data, or other information required to be
maintained under the Consent Decree. At the conclusion of the information -retention period, the City
must notify the United States and the State at least ninety (90) Days prior to the destruction of any
documents, records, or other information subject to such requirements and, upon request by the United
States or the State, the City must deliver any such documents, records, or other information to the EPA
or IDNR.
SECTION 00500
Page 5 of 6
CERTIFICATION BY CONTRACTOR
The undersigned, on behalf of the Contractor, with full authority to act on behalf of the Contractor,
certifies to the City of Dubuque as follows:
1. I have received a copy of the Consent Decree in the case of The United States of
America, and the State of Iowa v. The City of Dubuque, Iowa, Civil Action Number
Case 2:11-cv-01011-EMJ, Civil Action Number 2008V00041, DOJ Case Number 90-
5-1-1-09339, United States District Court for the Northern District of Iowa.
2. All work performed will be in conformity with the provisions of the Consent Decree.
3. Ail documents reports, data, records, or other information (including documents,
records, or other information in electronic form) that relate in any manner to the
performance of obligations under the Consent Decree, including any underlying
research and analytical data, will be retained as required by the Consent Decree.
4. The Contractor agrees to defend, indemnify, and hold harmless the City, its officers,
agents, or employees from and against any claims, including penalties, costs and
fees as provided in the Consent Decree, relating to or arising out of the Contractor's
failure to comply with the Consent Decree.
CONTRACTOR:
By:
Contractor
Signature
Printed Name
T:tle
Date
SECTION 00500
Page 6 of 6
THE CITY AGREES:
15. Upon the completion of the Contract, and the acceptance of the Project by the City Council,
and subject to the requirements of law, the City agrees to pay the Contractor as full
compensation for the complete performance of this Contract, the amount determined for
the total work completed at the price(s) stated in the Contractor's Bid Proposal and less
any Agreed Cost of Delay provided for in the Contract Documents.
CONTRACT AMOUNT $108,305.36
CITY OF DUBUQUE, IOWA:
664
Departm
By:
Sign?ture
(/J_ s f y
Prin&3y
tme %�
l".l�ie )l Ce ✓
Ttle
o
Date
CONTRACTOR:
Contractor
By: l(�
Signa)Gre
( A A A 1 !: '3 c,& : *i,
Printed dame
Ttle
1-1- ?...Li.t,,o
Date
___= END OF SECTION 00500 ====
Bond No. 2435355
SECTION 00600
Page 1 of 4
PERFORMANCE, PAYMENT AND MAINTENANCE BOND
SECTION 00600
KNOW ALL BY THESE PRESENTS:
That we, Midwest Concrete, Inc., as Principal (hereinafter the "Contractor" or "Principal")
and West Bend Mutual Insurance Company , as Surety
are held and firmly bound unto the City of Dubuque, Iowa, as Obligee (hereinafter referred to as
"Owner"), and to all persons who may be injured by any breach of any of the conditions of this
Bond in the penal sum of One hundred eight thousand, three hundred five dollars and thirty-six
cents ($108,305.36), lawful money of the United States, for the payment of which sum, well and
truly to be made, we bind ourselves, our heirs, legal representatives and assigns, jointly or
severally, firmly by these presents.
The conditions of the above obligations are such that whereas said Contractor entered into a
contract with the Owner, bearing date the 21 st day of April., 2020, (hereinafter the "Contract')
wherein said Contractor undertakes and agrees to construct the following project in accordance with
the Contract Documents, and to faithfully perform all the terms and requirements of said Contract
within the time therein specified, in a good and workmanlike manner, and in accordance with the
Contract Documents. The Contract Documents for the Asphalt Overlay Ramp Project One detail
the following described improvements:
Replacement of twenty-nine (29) access ramps at 12 intersections in conjunction with the
Public Works Asphalt Overlay program at the following locations:
la. Shady Lane and Northridge Drive, two single ramps.
lb. Northridge Court and Wildwood Drive, two single ramps
lc. Wildwood Drive and Wildwood Court, two single ramps
ld. Wildwood Court at bend, eliminate a non -compliant ramp
le. Wildwood Drive and Meadow Wood Drive, adding two single ramps
2a. Strauss Street and Buena Vista Street, two double ramps and two single ramps
2b. Strauss Street and Windsor Avenue, two single ramps
2c. Lawther Street and Windsor Avenue, two single ramps
2d. Lawther Street and Buena Vista Street, two single ramps
2e. Lawther Street Alley between Buena Vista Street and Hedley Street, two single ramps
and new alley approach.
2f. Lawther Street and Hedley Street, two single ramps and a double ramp. Adding
crossing on North side of Lawther Street at address 811.
2g. Lawther Street and Sheridan Street, two single ramps.
It is expresslyunderstood and agreed by the Contractor and Surety in this Bond that the following
provisions are a part of this Bond and are binding upon said Contractor and Surety, to -wit:
1. PERFORMANCE: The Contractor shall well and faithfully observe, perform, fulfill, and
abide by each and every covenant, condition, and part of said Contract and Contract
Documents, by reference made a part hereof, for the project, and shall indemnify and save
SECTION 00600
Page 2 of 4
harmless the Owner from all outlay and expense incurred by the Owner by reason of the
Contractor's default of failure to perform as required, The Contractor shall also be
responsible for the default or failure to perform as required under the Contract and Contract
Documents by all its subcontractors, suppliers, agents, or employees furnishing materials
or providing labor in the performance of the Contract.
2, PAYMENT: The Contractor and the Surety on this Bond hereby agreed to pay all just
claims submitted by persons, firms, subcontractors, and corporations furnishing materials
for or performing labor in the performance of the Contract on account of which this Bond is
given, including but not limited to claims for all amounts due for labor, materials, lubricants,
oil, gasoline, repairs on machinery, equipment, and tools, consumed or used by the
Contractor or any subcontractor, wherein the same are not satisfied out of the portion of the
contract price the Owner is required to retain until completion of the improvement, but the
Contractor and Surety shall not be liable to said persons, firms, or corporations unless the
claims of said claimants against said portion of the contract price shall have been
established as provided by law. The Contractor and Surety hereby bind themselves to the
obligations and conditions set forth in Chapter 573 of the Iowa Code, which by this
reference is made a part hereof as though fully set out herein.
3. MAINTENANCE: The Contractor and the Surety on this Bond hereby agree, at their own
expense:
A. To remedy any and all defects that may develop in or result from work to be
performed under the Contract Documents within the period of two (2) year(s) from the
date of acceptance of the work under the Contract, by reason of defects in
workmanship, equipment installed, or materials used in construction of said work;
B. To keep all work in continuous good repair; and
C. To pay the Owner's reasonable costs of monitoring and inspection to assure that any
defects are remedied, and to repay the Owner all outlay and expense incurred as a
result of Contractor's and Surety's failure to remedy any defect as required by this
section.
Contractor's and Surety's Contract herein made extends to defects in workmanship or
materials not discovered or known to the Owner at the time such work was accepted.
4. GENERAL: Every Surety on this Bond shall be deemed and held bound, any contract to the
contrary notwithstanding, to the following provisions:
A. To consent without notice to any extension of time authorized in approved change
orders to the Contractor in which to perform the Contract;
B. To consent without notice to any change in the Contract or Contract Documents,
authorized in approved change orders which thereby increases the total contract price
and the penal sum of this Bond, provided that all such changes do not, in the
SECTION 00600
Page 3 of 4
aggregate, involve an increase of more than twenty percent (20%) of the total contract
price, and that this Bond shall then be released as to such excess increase;
C. To consent without notice that this Bond shall remain in full force and effect until the
Contract is completed, whether completed within the specified contract period, within
an extension thereof, or within a period of time after the contract period has elapsed
and the liquidated damage penalty is being charged against the Contractor.
The Contractor and every Surety on the Bond shall be deemed and held bound, any contract to the
contrary notwithstanding, to the following provisions:
D. That no provision of this Bond or of any other contract shall be valid that limits to less
than five (5) years after the acceptance of the work under the Contract the right to sue
on this Bond,
E. That as used herein, the phrase "all outlay and expense" is not to be limited in any
way, but shall include the actual and reasonable costs and expenses incurred by the
Owner including interest, benefits, and overhead where applicable. Accordingly, "all
outlay and expense" would include but not be limited to all contract or employee
expense, all equipment usage or rental, materials, testing, outside experts, attomey's
fees (including overhead expenses of the Owner's staff attorneys), and all costs and
expenses of litigation as they are incurred by the Owner. It is intended the Contractor
and Surety will defend and indemnify the Owner on all claims made against the
Owner on account of Contractor's failure to perform as required in the Contract and
Contract Documents, that all agreements and promises set forth in the Contract and
Contract Documents, in approved change orders, and in this Bond will be fulfilled, and
that the Owner will be fully indemnified so that it will be put into the position it would
have been in had the Contract been performed in the first instance as required.
In the event the Owner incurs any "outlay and expense" in defending itself against any claim as to
which the Contractor or Surety should have provided the defense, or in the enforcement of the
promises given by the Contractor in the Contract, Contract Documents, or approved change
orders, or in the enforcement of the promises given by the Contractor and Surety in this Bond, the
Contractor and Surety agree that they will make the Owner whole for all such outlay and expense,
provided that the Surety's obligation under this Bond shall not exceed one hundred twenty-five
percent (125%) of the penal sum of this Bond.
In the event that any actions or proceedings are initiated regarding this Bond, the parties agree that
the venue thereof shall be Dubuque County, State of Iowa. If legal action is required by the Owner
to enforce the provisions of this Bond or to collect the monetary obligation incurring to the benefit of
the Owner, the Contractor and the Surety agree, jointly, and severally, to pay the Owner all outlay
and expense incurred therefor by the Owner. All rights, powers, and remedies of the Owner
hereunder shall be cumulative and not alternative and shall be in addition to all rights, powers, and
remedies given to the Owner, by law. The Owner may proceed against surety for any amount
guaranteed hereunder whether action is brought against the Contractor or whether Contractor is
joined in any such action(s) or not.
SECTION 00600
Page 4 of 4
NOW THEREFORE, the condition of this obligation is such that if said Principal shall faithfully
perform all the promises of the Principal, as set forth and provided in the Contract, in the Contract
Documents, and in this Bond, then this obligation shall be null and void, otherwise it shall remain in
full force and effect.
When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first as
defined in this Bond, the Contract, or the Contract Documents; second, if not defined in the Bond,
Contract, or Contract Documents, it shall be interpreted or construed as defined in applicable
provisions of the Iowa Code; third, if not defined in the Iowa Code, it shall be interpreted or
construed according to its generally accepted meaning in the construction industry; and fourth, if it
has no generally accepted meaning in the construction industry, it shall be interpreted or construed
according to its common or customary usage.
Failure to specify or particularize shall not exclude terms or provisions not mentioned and shall not
limit liability hereunder. The Contract and Contract Documents are hereby made a part of this
Bond,
Project No. 2501227-1
Witness our hands, in triplicate, this 21st day of April
SURETY COUNTERSIGNED BY: Ttle
FOR
Signature of Agent
Printed Name of Agent
Company Address
City, State, Zip Code
Company Telephone Number
PRINCIPAL:
Midwest Concrete Inc
Contractor
By: - G
Si ature Owner
Ryan Coates
Printed Name
Representative for Owner
SURETY:
, 2020.
West Bend Mutual Insurance Company
Surety Company
By: .�`�I }'`(1r4
Signature Attomey-in-Fact Officer
Kim Hess
Printed Name of Attomey-in-Fact Officer
Tricor
Company Name
600 Star Brewery Dr Ste 110
Company Address
Dubuque, IA 52001
City, State, Zip Code
563-556-5441
Company Telephone Number
A MUTUAL INSURANCE COMPANY'
THE SILVER LINING'
Bond No.
2435355
POWER OF ATTORNEY
Know all men by these Presents, That West Bend Mutual Insurance Company, a corporation having its principal office in the City of West
Bend, Wisconsin does make, constitute and appoint:
KIM HESS
lawful Attorney(s)-in-fact, to make, execute, seal and deliver for and on its behalf as surety and as its act and deed any and all bonds,
undertakings and contracts of suretyship, provided that no bond or undertaking or contract of suretyship executed under this authority
shall exceed in amount the sum of: Ten Million Dollars ($10,000,000)
This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted
by the Board of Directors of West Bend Mutual Insurance Company at a meeting duly called and held on the 21st day of December,
1999.
Appointment ofAttorney-In-Fact. The president or any vice president, or any other officer of West Bend Mutual Insurance
Company may appoint by written certificate Attorneys -In -Fact to act on behalf of the company in the execution of and attesting of
bonds and undertakings and other written obligatory instruments of like nature. The signature of any officer authorized hereby
and the corporate seal may be affixed by facsimile to any such power of attorney or to any certificate relating therefore and any
such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be valid and binding upon the
company, and any such power so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon
the company in the future with respect to any bond or undertaking or other writing obligatory in nature to which it is attached.
Any such appointment may be revoked, for cause, or without cause, by any said officer at any time.
In witness whereof, the West Bend Mutual Insurance Company has caused these presents to be signed by its president undersigned
and its corporate seal to be hereto duly attested by its secretary this 22nd day of September, 2017.
Attest 41A,iO 11L (' . '?4tiv,90-.1
Christopher C. Zl�xygart
Secretary
State of Wisconsin
County of Washington
On the 22nd day of September, 2017, before me personally came Kevin A. Steiner, to me known being by duly sworn, did depose and
say that he resides in the County of Washington, State of Wisconsin; that he is the President of West Bend Mutual Insurance Company,
the corporation described in and which executed the above instrument; that he knows the seal of the said corporation; that the seal
affixed to said instrument is such corporate seal; that is was so affixed by order of the board of directors of said corporation and that he
signed his name thereto by like order. ,,...... •
a.
Kevin A. Steiner
Chief Executive Officer/President
Nc)TAn j,..'
Fuollc;r:
�5.
, Or wtst.•`
Juli A nedum
Senior orporate Attorney
Notary Public, Washington Co., WI
My Commission is Permanent
The undersigned, duly elected to the office stated below, now the incumbent in West Bend Mutual Insurance Company, a Wisconsin
corporation authorized to make this certificate, Do Hereby Certify that the foregoing attached Power of Attorney remains in full force
effect and has not been revoked and that the Resolution of the Board of Directors, set forth in the Power of Attorney is now in force.
Signed and sealed at West Bend, Wisconsin this 21st day of April J 2020
.c �RPORATe F `' j, C)
SEAL
'IA co7F
Notice: Any questions concerning this Power of Attorney may be directed to the Bond Manager at NSI, a division of West Bend
Mutual Insurance Company.
Heather Dunn
Vice President — Chief Financial Officer
1900 S. 18th Ave. West Bend, WI 53095 I ph (262) 334-6430 I 1-800-236-5004 I fax (262) 338-5058 I www.thcsilvcrlining.com