Tenth and Central Parking Ramp_Fire Headquarters Expansion ProjectTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 1 0th & Central Parking Ramp (Pending US Department of Commerce Economic Development Administration Funding) (CIP #7302179) Fire Headquarters Expansion Project (Funded Totally by General Obligation Bonds) (CIP #7302266) DATE: April 14, 2010 72 a el MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Tim Horsfield, Parking System Supervisor C. Mic Van Milligen Dubuque kerd 1111-A edcaCity � ► 2007 The City Council previously approved the site and design firm for the construction of a 477 -space parking ramp and the addition of three truck bays for the current fire headquarters. The parking ramp design has been reviewed and approved by the City Council, the Historic Preservation Commission and the State Historic Preservation Office. Parking System Supervisor Tim Horsfield recommends that the City Council now approve the plans, specifications, form of contract and the estimated cost of $9,882,136 for the 10 & Central Parking Ramp Project and $580,720 for the Fire Headquarters Expansion Project. I concur with the recommendation and respectfully request Mayor and City Council approval. Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Tim Horsfield, Parking System Supervisor DATE: April 9, 2010 Dubuque kritd AII- AmedcaClty 1111 ! 2007 SUBJECT: 10 & Central Parking Ramp (Pending US Department of Commerce Economic Development Administration Funding) (CIP # 7302179) INTRODUCTION The enclosed resolution is in reference to the public hearing on the 10 & Central Parking Ramp and Fire Headquarters Expansion Project. BACKGROUND Fire Headquarters Expansion Project (Funded Totally by General Obligation Bonds) (CIP # 7302266) The City Council has previously approved the site and design firm for the construction of a 477 -space parking ramp and the addition of three truck bays for the current fire headquarters. The design team for the project consists of Desman Associates, Straka /Johnson Architects and Buesing Associates. In order to achieve the desired number of vehicular spaces, it was determined the ramp would be seven stories /levels in height (82 feet at the top of the spandrel). Since the parking ramp will exceed the maximum 75 -foot height requirement of the C-4 Downtown Commercial District, it is exempted from the bulk of the regulations of the Unified Development Code in Article 3 -16 Public Buildings and Uses since it is a public structure. If this ramp was not a public structure, a height variance would need to be received from the Zoning Board of Adjustment. City Attorney Barry Lindahl has advised against seeking a variance due to the exemption provided for the parking ramp in UDC Article 3 -16. The parking ramp design has been reviewed and approved by the City Council, the Historic Preservation Commission and the State Historic Preservation Office. Since the building will be located in an area that is not adjacent to residential, and because it will be similar in height to other downtown structures (Dubuque County Courthouse, American Trust, Roshek Brothers' Building, Fischer Building, Hotel Julien, etc.), Planning Services Staff feels that exempting the property from the height requirement will not be detrimental to the surrounding property. DISCUSSION The 10 & Central Parking Ramp and Fire Headquarters Expansion Project will include the following: 10 & Central Parking Ramp (Partially Funded by U.S. Department of Commerce, Economic Development Administration — Approval Pending) The 10 & Central Parking Ramp will be a 7- level, 2 -bay wide cast -in- place, post - tensioned concrete parking facility partially clad with an architectural precast concrete fagade and containing 477 parking spaces. The parking facility will be considered an open structure, in conformance with International Building Code, and clad with a combination of thin brick -faced architectural precast concrete and solid color precast panels to emulate a buff limestone facade containing sufficient openings to provide natural ventilation of all parking areas. Two stair towers will be clad with an aluminum curtain wall on two sides and each tower will have one elevator. The towers will be constructed on the northeast and southwest corners of the facility. Vehicle entrances and exits will be on Iowa Street on the southwest corner and onto Central Avenue on the east side of the site. Fire Headquarters Expansion (Totally Funded by General Obligation Bonds) The fire headquarters expansion will include the construction of a three -bay wide fire station equipment expansion structure on the west side of the existing adjacent Fire Department Headquarters. Site work includes demolition of the existing parking lot and construction of new site work and landscaping per drawing and specifications. The contractor shall be responsible for protection of the adjacent existing fire station headquarters, existing east/west running utilities just south of the proposed parking deck and newly - installed utilities, curb and gutter that will be in place along 9th Street, 10 Street, and Central Avenue including the southeast corner of the fire headquarters expansion. RECOMMENDATION recommend that the City Council approve the plans, specifications, form of contract and the estimated cost for the 10 & Central Parking Ramp and Fire Headquarters Expansion Project. BUDGET IMPACT (10 & Central Parking Ramp Project) The estimate of probable cost for the 10 & Central Parking Ramp Project is as follows: Construction Contract Contingency Construction Engineering & Inspection Miscellaneous Expenses (Fiber Relocation, Revenue Testing, Traffic Study, Emergency Siren Relocation) Alternate Bids Funding Total The project funding summary is as follows: CIP No. 7302179 Fund Description 10 /Central Parking Ramp(General Obligation Bonds) U.S. Dept. of Commerce Economic Development Admin. Total Project Funding An application for partial funding was submitted to the U.S. Department of Commerce, Economic Development Administration. City staff has been in discussions and negotiations for EDA assistance for nearly 18 months. Over that timeframe, the location and size of the proposed parking ramp has been modified. The original application requested $7 million from EDA. Due to changes in how the Denver EDA allocates public works funding within our region, the EDA could only commit to a $1.5 million grant. City staff has submitted the additional information requested by the EDA, and a verbal agreement has been received. The City of Dubuque also sold general obligation bonds in the amount of $9.2 million to fully fund the cost of the project. BUDGET IMPACT (Fire Headquarters Expansion) Control Equip, Construction Contract Contingency -10% Construction Engineering & Inspection Total Project Cost Estimate $7,865,511.00 786,551.00 480,845.00 486,335.00 262,894.00 $9,882,136.00 The estimate of probable cost for the Fire Headquarters Expansion is as follows: Fund Amount $8,382,136.00 1,500,000.00 $9,882,136.00 Estimate $466,964.00 46,696.00 67,060.00 $580,720.00 The project funding summary is as follows: CIP No. Fund Description 7302266 Fire Headquarters Expansion(General Obligation Bonds) Total Project Funding BIDDING ALTERNATES There are four bidding alternates for consideration: — Alternate # 1 — Paint Ceilings and Beams of Structure - — Alternate # 2 — Add Canopy Around Structure - — Alternate # 3 — Add Lighting to Canopy Structure - — Alternate # 4 — Snowmelt System for Sidewalks /Driveways * *City Provided Alternate — Closed Circuit Security Camera System ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and the estimated cost for the 10 & Central Parking Ramp and Fire Headquarters Expansion Project. cc: David Heiar, Economic Development Director Dan Brown, Fire Chief Steve Sampson Brown, Project Manager Gus Psihoyos, City Engineer Jenny Larson, Budget Director Fund Amount $580,720.00 $580,720.00 $ 107,903.00 $ 426,334.00 $ 130,106.00 $ 135,988.00 $ 226, 000.00 RESOLUTION NO. 118-10 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 10 & CENTRAL PARKING RAMP AND FIRE HEADQUARTERS EXPANSION PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the 10 & Central Parking Ramp and Fire Headquarters Expansion Project, in the estimated amount of $9,882.136.00 (partially funded by the U.S. Department of Commerce Economic Development Administration based on grant approval) for the 10 & Central Parking Ramp and the estimated amount of $580,720.00 (completely funded by General Obligation Bonds) for the Fire Headquarters Expansion roject, are hereby approved. Passed, approved and adopted the 19th day of i�.', 2010. Attest: eanne F. Schneider, CMC, City Clerk Roy D. Buol, Mayor NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT 10th & CENTRAL PARKING RAMP (PARTIALLY FUNDED BY THE U.S.' DEPARTMENT OF COMMERCE, ECONOMIC DEVELOPMENT ADMINISTRATION AWARD BASED ON GRANT APPROVAL) AND FIRE HEADQUARTERS EXPANSION PROJECT Time and Place for Fling Sealed Propos- als Sealed bids for the work comprising e4 improvement as stet below must be filed fore 11:00 A.M. Cent Time on May 4, 2010 the Office of the y Clerk, City Hall - F Floor, 50 West 13t Street, Dubuque, Iowa. U.S. Department Time and Place Commerce, Econo Sealed Proposals Development Admir Will be Opened and tration based on gr Considered approval and theref is subject to the fed al laws and regulati associated with . tl� program. Federal Prevailii • Wage Rate 00, 3 This project will ! I Gi partially funded wi federal funds from t Sealed proposals will be opened and bids tabulated at 11:00 AM Central Time on May 4, 2010, at City Hall - Con- ference Room A, 50 West 13th Street, Du- buque, IA 52001, for consideration by the City Council at its meeting on May 17, 2010. The City of Dubu- que, Iowa, reserves the right to reject any and all bids. Time for Com- mencement and Completion of Work Work on each im- provement shell - be commenced within 10 days after the Notice to Proceed has been is- sued and shall be fully completed by March 18, 2011. purchased with Feder Bid' Security funding. fol • Each bidder shall ac- this contract! muukt be Dbq Spring Special company' its bid with a American -made to th Chimney or Gutter bid security as security maxintqrri extent Masi Cleaning & Repair, that the successful bid- ble, in accordance wit starts at $65. Call Norm der. wilJ enter- aiiii ea as Public -taw, 103 - 563 -543 -8391, 588 -2277 contract for the „work Sections' .606 1. . (a) bid upon'and'wilt fur - (b): nish aftenthe,avQa'rd. of. '' "Ad r ist o contract' 4,4 ai , co ° tp`arate + ` hr - ' ; - b surety bond' cc ' .rru t d'o th ble to the " governirtfen ”' "pose orrrH o tal entity,for the faith- the construction doc ful performance of the • ments. The cost f contract, in an amount each project —the Fi equal to one hundred, Headquarters,' Additi percent of the amount and the Parking Ram of the contract: The bid Project - - MUST be se security shall be in the - , arated. and ,easily di amount of ten percent • tinguishabie - (le 'to d (10 %) of the arnoiint, of _ dg the contract •,and shall ,` how be in the form of , tita cashier's check o ter- t'o inc tified.check drawn"on%, e, state;,chaytefed d,�; ude both "pr - opayrs�rig�l'eh" entity may provide for to the City Treasur, a bidder's bond with City of Dubuque, draw corporate' surety satis on a bank in Iowa 'or, factory to the govern- bank chartered and mental entity, The bid the laws of the Unite bond shall contain no States,. in the amou conditions eXcepted often percent (10 %) o provided : in:zthis ;sec- the bids, submitted tion. ,, .. security that - the bi Corttfaer, ' . PR OW ' der, will ' , , enterinato ments, ; ,,'M contract - C,gpte the b,Idai, gg, work a 1; itt g docamei i % 6"' lidrf vvi 0 pe tained,at Tri Sta'teBlue curities, for the •faithful U.S. Department Commerce, Econo Development Admini! tration based on gra Reg. childcare has open - approval and therefo ings for all ages: 1st & is required to comp 2nd shifts & early am hrs. with all provisions Meals, activities. Refs. the Davis -Bacon Fede Tanzanite area. 5822511 al .Pievailing,lillage A and °related labor r� Caring & fun loving, quirements and regul reg. in -home daycare has bolts. FT & PT openings avail. Buy America Pro Meals incl. Ask for sion Jamie 563 -588 -1028 Equipment or pro ucts authorized to b Cleaning Services Child Care, In -Home Chimney Cleaning Automotive Services I 1 1 Residential Floor to Ceiling Windows too! Wlk/bi -wkly I Thorough carpet, air duct &dryer vent,cleaning. KANNDO.563- 556 -6,168 ns serving t r over 30 yeq .,o erally chartered.,.bank„ be,. accompanied by. or a certified share satisfactory Bid Bon draft drawl on a' t - e by the,Bi for all insurance coralI chartered' orr f e etal , ' an.•acceptabr'e Au an trust making:the best of • chartered credit'union, ;ety; -on a tash;ier'S., ke,tneverhappened,guaq or the. govern,p ental certdid'ed' checlepayabl - W. of Arterial Business Assistance STATE OF IOWA {SS: DUBUQUE COUNTY I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: April 7 & 9, 2010, and for which the charge is $169.14. Subscribed to before me, a Notary Public in and for Dubuque County, Iowa, this 9Z day of CERTIFICATION OF PUBLICATION SLi �..� ,20 `d . Notary Public in and for Dubuque County, Iowa. MARY K. WESTERMEYER r Commi ssion Number 154885 Cbmm, Exp. 2011 (PA c .IALi:Y' " NDED D8D'p -M .OF CO A ,l 13ii ON AW ,:ft , ON GRA rAAP OVAL) AN D FIRE HEADQUARTERS EXPANSION PROJECT Time and Place for Fling Sealed Propos- als Sealed bids for the Time and Place Sealed proposals Will. be Opened and Considered Sealed proposals will be opened and bids tabulated at 11:00 AM Central Time on May 4, 2010, at Clty Hall - Con- ference Room A, 50 West 13th Street, Du- buque, IA 52001, for consideration by the City Council at its meeting on May 17, 2010. The City of Dubu - que, Iowa, reserves the right to reject any and all bids. Time for Com- mencement and Completion of Work Work on each Im- provement shall - be commenced within 10 ' days after the Notice to Proceed has been is- sued and shall be fully completed by March 18, 2011. • Bid Security Each bidder shall ac- company Its bld with a bid security as security that the successful bid - der will enter :.Into a ' contract for the work bid upon and Will fur- nish after the award of contract' a, corporate surety bond;- accepta- ble to the governmen- tal entity, for the faith- ful performance of the contract, In an amount equal to one hundred percent of the amount of the contract. The bid security.shall be In the amount of ten percent (10 %) of the amount of the contract and shall be In the form of 'a cashier's check or cer- tified check drawn on a state - chartered or fed erally chartered bank, or a certified share draft drawn onA state - chartered er federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satis- factory to the govern- ' mental entity. The bid bond shall contain no conditions excepted as J provided' In this sec tion. . - Contract ` D ocu- ments . Coles of the bidding documents may be•ob- tained at Tri -State Blue Print & Framing Com- pany.. (a.1§0 . known as Teof3b graphics "), . 696 Central Avenue; Dubu- que, IA 52001. (Voice: (563) 556- 3030).: A plan deposit gi, $ 5 ,00. per set of , aadgh;; ments arid' s eciflca - tions • or. ,receipt of, an AGC, AMC, AMEC,'. BI' or NEW oard i$ re, quired. Deposits wIll be refunded' U ' on return of the bidding docu- ments and specifica- tions In good condition within ten (10) days af- ter bld opening. Coples of the Complete bid documents and specifi- cations are also availa- ble using a web brows- er at http: / /ll.desman. com /flles /lOthandcent raibiddocs.zip to down- load without charge. The "zip file must be saved prior to opening content. The complete set of bidding documents will also be available on the City of Dubuque's website ® Www.cityof dubuque.org in the Commerce, Economic Development Adminls- tration based on grant approval and therefore is subject to the feder- al laws and regulations associated with that program. Federal Prevailing Wage Rate This project will be partially funded with federal funds from the U.S, Department of Commerce, Economic Development Adminis- tration based on grant approval and therefore is required to comply with all provisions of the Davis -Bacon Feder- al Prevailing Wage Act and related labor re- quirements and regula- tions. Buy America Provi• sion Equipment or prod- ucts authorized to be purchased with federal funding awarded for this contract must be American -made to the maxinlum extent feasi- ble, in accordance with Public Law 103 -121, Sections 606 (a) and (b). Administration All bids must be sub- mitted on the Bid Pro- pose! Form bound in the construction docu- ments. The cost for each project- -the Fire Headquarters Addition and the Parking Ramp . Project - -MUST be sep- arated and easily dis- tinguishable due to dif- ferent funding sources; however, only one con - tract'will be awarded to "Include both proj- e4ts to a single con- tractor, Each bid shall be accompanied by a satisfactory Bid Bond executed by the Bidder and an acceptable sur- ety; or a cashier's or certified check payable to the Clty Treasurer, City of Dubuque, drawn on a bank in Iowa or a bank chartered under the laws of the United States,. in the amount, of ten percent (10 %) of the bids, submitted as security that the bid- der will enter Into a contract for, doing the work and will give bond with proper se- curities for the faithful performance of the contract in the form at- tached to the construc- tion documents. The successful bidder (Contractor) will be re- quired to furnish a Per - formance Bond ,in an amount equal to one hundred percent (100 %). of the contract pprice; Said bond Is to ;be issued by a reapon- Bible ,surety company approved and accepta- ble to the City Council, and shall guarantee the faithful perform- ance of the contract and terms and condi- tions therein con- tained, and shall guar- antee the prompt pay- ment of all materials and labor and protect and save harmless the City of Dubuque, Iowa, from claims and dam- ages of any kind caused by the opera- tions of the Contractor. The successful bidder (Contractor) will also be required to furnish a Payment Bond in the amaunt 100% of the caused by the opera- tions or non - payment on behalf of the Con- tractor. The successful bidder (Contractor) will also be required to furnish a Maintenance Bond that will guarantee the ma- terial, workmanship and maintenance of the improvement(s) constructed for a mini- mum period of two (2) years from and after its acceptance of the work under the Con- tract by the City Coun- cil of the City of Dubu- que, Iowa, by reason of defects in workman- ship or materials used in construction of said work. Sales Tax The Contractor and approved subcontrac- tors will be provided a Sales Tax - Exemption Certificate to purchase, or withdraw from in- ventory, materials fur- nished under for this project. No bid submitted by any Contractor which contains a condition or qualification shall be recognized or accepted by the City Council and any letter or communi- cation accompanying the bid which contains a condition or qualifi- cation upon the bid which has the effect of qualifying or modifying any provision of the specifications in any manner will be reject- ed by the Clty Council as not responsive. All proposals must be made on blanks fur -, nished by the City En- gineer and each bidder will be required to state his prices for do- ing all the Items in each section on which he makes a bid and for all things necessary to make a complete Job. The Bidder's attention is directed to the City of Dubuque's Affirma- tive Action Program which Is included in the Contract Specifications and the provisions thereof and hereby made a part of the Contract Documents by reference and incorpo- rated therein. The Contractor, when requested by the City of Dubuque, • will fur- nish a statement of his financial and practical qualifications as pro- vided for in the General Requirements of the Specifications. The City Council re- serves the right to re- ject any and all bids or to waive any technical ties and irregularities. All bids will be public- ly opened and ready by the City Clerk at 11:00 AM Central Time on May 4, 2010, In Confer- ence Room A, City Hall - Lower Level located at 50 West 13th Street, Dubuque, IA 52001- 6949, for consideration by the City Council (Council) at its meeting on May 17, 2010. The City of Dubuque, Iowa, reserves the right to reject any and all blds. General Nature. of Public Improvement. 30th & CENTRAL PARKING RAMP (CIP 730-2179) (PARTIALLY FUNDED BY THE U.S. DEPART- In general, work un- der this contract for the 10th & Central Parking Ramp and Fire Headquarters Expan- sion Project will con- sist of furnishing of all labor, materials, com- ponents, equipment and tools necessary to complete all work for the construction of a 7- level, 2 -bay wide cast - in- place, post -ten- sioned concrete park- ing facility of 477 park- ing spaces. The parking facility, partially funded using U.S. Department of Commerce Economic Development Adminis- tration based on grant approval, will be con- sidered an open struc- ture with: a combina- tion of thin brick -faced architectural precast concrete; solid color precast panels to emu- late a buff limestone facade; and sufficient openings to provide natural ventilation of all parking areas. The ramp Is to be con- structed as an open parking structure In conformance with IBC 2006. The two stair towers constructed on the northeast and south- west corners of the fa- cility will be clad With an aluminum curtain wall on two sides and each tower will have one elevator. Vehicle entrances and exits will be on Iowa Street on the southwest cor- ner and onto Central Avenue on the east side of the site. The project will also include the construc- tion of a three -bay wide fire station equip- ment expansion struc- ture on the west side of the existing Fire De- partment Headquar- ters. Site work includes demolition of the exist- ing parking lot, con- struction, and land- scaping. The contrac- tor shall be responsible for protection of the: adjacent existing fire station headquarters; newly - installed and ex- isting east/west utilit- ies south of the pro- posed parking deck; and, curb and gutter that will be in Installed along 9th Street, 10th Street, and Central Avenue (including the southeast corner of the Fire Department Head - quarter's expansion). Pre-Bid Construc- tion Conference. At- tendance by all pro- spective general con- tractor bidders is man- datory; however, the attendance of sub- contractor bidders is not , mandatory, but highly recommended. The Pre -Bid Construc- tion Conference is to be held at 10:30 A.M. Central Time on April 15th, 2010, at the Five Flags Civic Center - Majestic Room (Locust Street, entrance, sec- ond level) at 405 Main Street, Dubuque, Iowa 52001. Published by order of the City council of the City of Dubuque, Iowa, and dated this 5th of April, 2010. ERTIFICATION OF PUBLICA a Billing Clerk for Woodward Cot lisher of the Telegraph Herald,a n= City of Dubuque, County of Dubu• ttached notice was published in sai 9, 2010, and for which the charge ;fore me, a Notary Public in and fo day of zit IOWA {SS: COUNTY (...) 01. 4. 0 Notary Public in and FA' e MARY K. WESTER, Commission Number My Comm t x . r'gF3, NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT 10th & CENTRAL PARKING RAMP (PARTIALLY FUNDED BY THE U.S.' DEPARTMENT OF COMMERCE, ECONOMIC DEVELOPMENT ADMINISTRATION AWARD BASED ON GRANT APPROVAL) AND FIRE HEADQUARTERS EXPANSION PROJECT Time and Place for Filing Sealed Propos- als Sealed bids for the work comprising each Bids section and is improvement as stated viewable and down - below must be filed be- loadable at no charge. fore 11:00 A.M. Central Statement of Feder - Time on May 4, 2010, in al Participation the Office of the City This project will be Clerk, City Hall - First partially funded with Floor, 50 West 13th federal funds from the Street, Dubuque, Iowa. U.S. Department of Time and Place Commerce, Economic Sealed Proposals Development Adminis- Will be Opened and tration based on grant Considered approval and therefore Sealed proposals will is subject to the feder- be opened and bids al laws and regulations tabulated at 11:00 AM associated with . that Central Time on May 4, program. 2010, at City Hall - Con- Federal Prevailing ference Room A, 50 Wage Rate West 13th Street, Du- This project will be buque, IA 52001, for partially funded with consideration by the federal funds from the City Council at its U.S. Department of meeting on May 17, Commerce, Economic 2010. The City of Dubu- Development Adminis- que, Iowa, reserves the tration based on grant right to reject any and approval and therefore all bids. is required to comply Time for Com- with all provisions of mencement . the Davis - Bacon, Feder - Completion of Wrk at Pr:evailing"1Nage' At Work on each im- and "labor .re= provement shall - be quirementsand regula- commenced within 10 tions. days after the Notice to Buy America Provi- Proceed has been is- sion sued and shall b'e fully Equipment or prod - completed . by,, March ucts authorized to be 18,2011. purchased with federal Bid'Security funding.;award _ d..for Ea bidder shall, ac- this contract mdst be company' its 'bid with a American -made to the bid security as security maxin7um extent feasi- that the successful bid- ble, in accordance with der will rente•.ieto•,a Public Law 103 -121, contract..for .th,work Sections' 606. (a) and. bid upon and will fur nish aftenthe av and of , Ad unstrat o contract a `corp'ora'te+ h All bidswrru" b surety bond, acceepte- rmtted,onth T rd Pro` ble to thew govern`mei=" 'ping' - botincr in tal entity,, for the faith- the construction docu =' ful performance of the ments. The cost for contract, in an amount each project- -the Fire; 1 equal to one hundred • Headquarters Addition; percent of the amount and the Parking Ram . of the contract The bid Project •MUST be sep- securityshall be in the , arated and easily dis4 amount of ten percent tinguishable •ue to dif= (10 %) of the amount of yfer, . u d ;sohrlr the cont shall t ow-v ,oa :o coo be, in the ,form of• ar 1 ydeds cashier's ch ' eck or ter- 'o inc ude bo proj- tified:•check ,draWn"orra4 a t r7 r bio argle • state-char ,• teactoreoga b,d erally char~tered.,..bank,, be. accompanied by a or a certified share satisfactory Bid Bond draft drawn on,,a „execute d. by the ,Bidder,! chartered :,ior.•. era ■ -, ,anf'd anti acceptable sur - • chartered'eredjt union, ; ety;. or. a cashier's. or or the governmental certtfied.check`payable entity may provide for to the City Treasurer, a bidder's bond with City of Dubuque, drawn corporate surety satis- on '''a bank 'in Iowa or a factory to the govern- bank chartered under ' mental entity. The bid the laws of the United bond shall contain no States,• in the amount, conditions excepted often percent (10 %) of : provided in this sec- the bids submitted as tion. .., ,,, security :that the bid Co lraet , Docu der, will enter into ,a' f Cop p : �t h e t id cl i gg wo ca f fir,, i r gat; documents'm"aktivc bona Wi h°r`p open twined atTri- State' Blue curities for faithful Print & `Com- performance of the pang, (also;,known. as contract in theform at- Teeigraphics "); 696 tached to the construc- Central 'Av-emen Dubu- tion documents. que, lA 52001. (Voice: The successful bidder (563) 556-3041): A. plan (Contractor) will be re- deposit A .,00 p qui ed to ur a Per- r.m set of ance Bond � meets a ca- a ou eq1:0 ' l ' o, o ' n� e i tions or gee t a hrfedr AGC AlvV A EG B at 0 0%0140 h ep contract,, EC or NA c d pis ;r ,';;,• 3pricei Sal: .bond.,,�5 to quired. D.epositxwill e�iss a resspon,- refunded r n yreturri bI` ' isu company of ilk bidddifig , ''dot.0= ^'''"appr aid'�accep a -- .. ta - ments and. specificbleto:the,City..Counci,ly tions in good condition and shall guarantee' within ten (10) days af- the ,faithful perform-, ter bid opening. Copies ante of the contract of the complete bid. and,terms,and condi documents and specifi- •' tion therein con-' av cations are also aila tained,.and shall guar -, ble using a web brows - •,antee.th prompt er at httpV/ ldesman. ment of all materials com /files /lothandcent and labor and protect ralbiddocs.zip to down- and save harmless the load without charge. City of Dubuque, Iowa, The 'zip file must be from claims and dam - saved�prior,.to opening ages ,of any kind', content. 9 caused, by the opera - The complete set of tions of the Contractor.' bidding do The successful bidder also be available on the (Contractor) will also City of,.. N Dubuque's be required to furnish a w websife ®`wwcityof Payment Bond in the m dubuque.orq in the aount of 100% of the 0 contract price that will guarantee the prompt payment of all subcon- tractors, suppliers, ma- terials, labor and pro- tect and save harmless the City of Dubuque, Iowa, from claims and damages of any kind caused by the opera- tions or non - payment on behalf of the Con- tractor. The successful bidder (Contractor) will also be required to furnish a Maintenance Bond that will guarantee the ma- terial, workmanship and maintenance of the improvement(s) constructed for a mini- mum period of two (2) years from and after its acceptance of the work under the Con- tract by the City Coun- cil of the City of Dubu- que, Iowa, by reason of defects in workman- ship or materials used in construction of said work. Sales Tax The Contractor and approved subcontrac- tors will be provided a Sales Tax J 'Exemption Certificate to'purch'ase, or withdraw from in- ventory, materials fur- nished 'under' for this project. • No bid submitted by any Contractor which contains a condition or qualification shall be recognized or accepted by the City ,Council and any, letter brcommuni- cation' accompanying the bid which contains a condition or qualifi- cation upon 'the bid w,hlchl haSf'tfieffsct of qual0 /iglNan motljri ng any... provisi.on....of,. the Specifications •in> any manner wiH b'e.reject- ed by, ; the City Council as not responsive. All proposals must be made. on blanks fur -, n'ished- by the City En= gineer and each bidder will be required ` to'. state his prices for do- ing all the items in' each • section oni which he makes a bid and for, I Attin n cessa • ,;to,•' rnn- e ,�o imP•,�('aterjo . The Bidder's attention is directed to E1t',rw. ?'City of1Drrbuque's iAffurinat. tive Action , Program which is, included•!n the , Contract Specification's ands the . ,provisions thereof and hereby made a part of the Contract Documents by • reference and - - _ rated therein. The Contractor, when requested by the City of Dubuque,' will fur- nish ,a statement of his financial and practical qualifications' as pro- vided for in the General Requirements of the Specifications: 'TheOtYr CounciL,re serves the right to re- ject any and all bids or to waive any technical ties and irregularities. All bids will be public- ly opened and ready by the City Clerk at 11:00 AM Central , Time ;on", May•4; 2010;4n Confer- ence Room A, City Hall ,, - Lower' Leyel, located' at,50 West 13th Street, Dubuque, .IA 52001 -' 6949, for consideration by the City Council (Council) at its meeting on May 17, 2010. The City of Dubuque, Iowa, reserves the right to reject any and all bids. General Nature. of Public Improvement. • 10th & CENTRAL PARKING RAMP (CIP 730-2170 :(PARTIALLY FUNDED BY THE US. DEPART- MENT OF COMMERCE ECONOMIC DEVELOP- MENT ADMINISTRA- TION BASED ON GRANT APPROVAL) AND • FIRE HEAD - S P PROJECT ( ION OJEC (CIP 730 -2266) In general,, work un- der this contract for the 10th & Central Parking Ramp and Fire Headquarters Expan- sion Project will con- sist of furnishing of all labor, materials, com- ponents, equipment and tools necessary to complete all work for the construction of a 7- level, 2 -bay wide cast - in- place, post -ten- sioned concrete park- ing facility of 477 park- ing spaces. The parking facility, partially funded using US. Department of Commerce Economic Development Adminis- tration based on grant approval, will be con- sidered an open struc- ture with: a combina- tion of thin brick -faced architectural precast concrete; solid color precast panels to emu- late a buff limestone facade; and sufficient openings to provide natural ventilation of all parking areas. The ramp is to be con- structed as an open parking structure in conformance with IBC 2006. The two stair towers constructed on the northeast and south- west corners of the fa- cility will be clad with an aluminum curtain wall on tWo sides sand each tower will have one elevator. Vehicle entrances and exits •will be on Iowa Street on the southwest cor- ner and onto. Central Avenue on the east sidekbf the site. The project will also include the construc- tion of a three -bay wide fire station equip- ment expansion struc- ture on the west side ,of the existing Fire-De- partment ' Headquar- ters. Site work includes demolition'ofthe exist- ing parking lot, con- struction, and land- The contrac- tdrshall be responsible a protection: of the: d jacent' existing fire • station 'headquarters; newly- installed and ex- isting ,east/west utilit- ies south of the pro- posed parking deck; and, curb and gutter that will be,in installed along' 9th Street, 10th +Street, and. Central Avenue (including the southeast corner of the Fire Department Head - quart expansion). ^Pfe-Bidr ' Co tion Conference. At- tendance by all pro - spective general con- tractor bidders is man- datory; however, the attendance of sub- contractor bidders is „not \mandatory, but highly , recommended. The Pre -Bid Construc- tion Conference is to be held at 10:30 A.M. Central Time on April 15th, 2010, at the Five Flags Civic Center - Majestic Room (Locust Street r entrance, sec- ond level) at 405 Main Street, Dubuque, Iowa 52001. • Published by order of the City council of the City of Dubuque, Iowa, and dated this 5th of April, 2010. Jeanne F. Schneider, CMC, City Clerk Published in the Tele- graph Herald, April 7 & 9, 2010. 2t 4/7, 9 IOWA {SS: COUNTY ERTIFICATION OF PUBLICATION a Billing Clerk for Woodward Communications, Inc., an Iowa lisher of the Telegraph Herald,a newspaper of general circulation City of Dubuque, County of Dubuque and State of Iowa; hereby ttached notice was published in said newspaper on the following 9, 2010, and for which the charge is $169.14. day of Pe.ie ;fore me, a Notary Public in and for Dubuque County, Iowa, Notary Public in and for Dubuque County, Iowa. Vd ESTER MEYE I? Colmmicolon Number 154885 �' p MI= Comm, Exp FES, 1, 2011