Acceptance of 2020 Asphalt Overlay Ramp Project One Copyrighted
J uly 20, 2020
City of Dubuque Consent Items # 9.
City Council Meeting
ITEM TITLE: Acceptance of 2020 Asphalt Overlay Ramp Project One
SUM MARY: City Manager recommending acceptance of the construction contract for
the 2020 Asphalt OverlayAccess Ramp Project One, as completed by
Midwest Concrete, I nc
RESOLUTION Accepting the 2020 Asphalt OverlayAccess Ramp
Project one and authorizing the final payment to the contractor
SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s)
DISPOSITION:
ATTACHMENTS:
Description Type
2020 Asphalt Overlay Ramp Project One-MVM Memo City Manager Memo
Staff Memo Staff Memo
Resolution Resolutions
Engineer's Cert Supporting Documentation
Dubuque
THE CITY OF �
ui-Aseria cih
DuB E , . � . ,
� II �
Maste iece on tj2e Mississi i zoo�•zoiz•zois
YP pp zoi�*zoi9
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: 2020 Asphalt Overlay Access Ramp Project One
(CIP 2501227)
DATE: July 15, 2020
City Engineer Gus Psihoyos is recommending acceptance of the construction contract
for the 2020 Asphalt Overlay Access Ramp Project One, as completed by Midwest
Concrete, Inc., in the final contract amount of$102,455.01, which is a 5.4% decrease of
the original contract amount of$108,305.36.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
v
Mic ael C. Van Milligen
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Teri Goodmann, Assistant City Manager
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Dubuque
THE CITY OF �
All•America Cit�
D B E �n���v���K�,����
U ' I 1�►
� �
Maste iece on the Mississi i 2oo�•zoiz�zoi3
�P pp zoi��zoi9
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
SUBJECT: 2020 Asphalt Overlay Access Ramp Project One
(CIP 2501227)
DATE: July 13, 2020
INTRODUCTION
The enclosed resolution provides for the acceptance of the construction contract for the
2020 Asphalt Overlay Access Ramp Project One.
BACKGROUND
The project replaced twenty-one non-compliant access ramps with twenty-six compliant,
directional ramps as per Public Right of Way Accessibilities Guidelines (PROWAG)
specifications in conjunction with the Public Works Asphalt Overlay Program involving
the following intersections:
• Northridge at Shady Ln, two single ramps.
• Northridge at Wildwood Dr. eliminated one ramp.
• Wildwood Dr. at Wildwood Ct., two single ramps.
• Wildwood Ct. eliminated one ramp.
• Wildwood Dr. at Meadow Wood Dr. two single ramps.
• Lawther St. at Sheridan two single ramps.
• Lawther St. at Hedley, two single ramps and one double ramp.
• Lawther St. at alley between Hedley and Buena Vista, two single ramps.
• Lawther St. at Buena Vista, two single ramps.
• Lawther St. at Windsor, two single ramps.
• Strauss St. at Windsor, two single ramps.
• Strauss St. at Buena Vista, two single ramps and two double ramps.
DISCUSSION
The 2020 Asphalt Overlay Access Ramp Project One was completed by Midwest
Concrete, Inc. of Peosta, IA in the final contract amount of$102,455.01. This is a 5.40%
decrease of the original contract amount of$108,305.36.
BUDGETIMPACT
The summary of project costs for the 2020 Asphalt Overlay Access Ramp Project One
is as follows:
Description Award Final
Construction Contract $108,305.36 $ 102,455.01
Contingency $11,413.86 0.00
Construction Administration & Inspection $18,832.87 $15,368.25
Total Construction Cost $138,552.09 $117,823.26
The project funding is summarized below:
CIP No. Fund Description Fund
Amount
2501227 Curb Ramp Program $ 117,823.26
Total Project Funding $ 117,823.26
REQUESTED ACTION
The City Council is requested to adopt the attached resolution accepting the
improvements and to authorize the final payment of the contract amount of$102,455.01
to Midwest Concrete, Inc. for the 2020 Asphalt Overlay Access Ramp Project One.
Prepared by: Luke Steger, Engineering Technician
cc: John Klostermann, Public Works Director
Arielle Swift, Assistant Public Works Director
Jenny Larson, Budget Director
Jon Dienst, Civil Engineer II
Paul Davis, Public Works Supervisor
2
RESOLUTION NO. 209-20
ACCEPTING THE 2020 ASPHALT OVERLAY ACCESS RAMP PROJECT ONE AND
AUTHORIZING THE FINAL PAYMENT TO THE CONTRACTOR
WHEREAS, the public improvement contract for the 2020 Asphalt Overlay Access
Ramp Project One, (the Project) has been completed by the Contractor, Midwest
Concrete, Inc. (Contractor), and the City Engineer has examined the work and signed a
certificate stating that the Project has been completed according to the terms of the
Public Improvement Contract and that the City Engineer recommends that the Project
be accepted; and
WHEREAS, the final contract amount for the Project is $102,455.01; and
WHEREAS, the Contractor has previously been paid $97,332.26, leaving a balance
of $5,122.75; and
WHEREAS, the City Council finds that the recommendation of the City Engineer
should be accepted.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved, and the Project is
hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from the
Curb Ramp Program CIP appropriations for the contract amount of $102,455.01 less
any retained percentage provided for therein as provided in Iowa Code.
Section 3. The Finance Director is hereby directed to pay to the Contractor the
balance of the retainage of $5,122.75 as provided in Iowa Code chapter 573, and to pay
such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa
Code chapter 26.13.
Passed, approved and adopted this 20th day of July, 2020.
Roy D. Buol, Mayor
Attest:
Kevin S. Firnstahl, CMC City Clerk
�
i
�
�
I�
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF 2020 ASPHALT '',�
OVERLAY ACCESS RAMP PROJECT ONE
. . !�
The undersigned City Engineer of the City of Dubuque, lowa, hereby certifies that '
he has inspected the 2020 Asphalt Overlay Access Ramp Project One, and that said ��
Project has been performed in compliance with the terms of the Public Improvement "
Contract, and that the total cost of the completed work is $117,823.26a 'I
�
,
i;
Dated this 14th day of July 2020. I;
�.� 'i
�� �
;
Gus Psihoyos, City Engineer �
�
„