Loading...
Acceptance of Hillcrest-Rosemont Detention Basin Project Copyrighted September 8, 2020 City of Dubuque Consent Items # 28. City Council Meeting ITEM TITLE: Acceptance of Hillcrest-Rosemont Detention Basin Project SUM MARY: City Manager recommending acceptance of the public improvement contract for the Hilcrest-Rosemont Detention Basin Project, as completed by Eastern lowa Excavating & Concrete, LLC. RESOLUTION Accepting the Hillcrest/ Rosemont Detention Basin Project and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Hillcrest-Rosemont Detention Basin Project-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Cert Resolutions Dubuque THE CITY OF � ui-Aseria cih DuB E , . � . , � II � Maste iece on tj2e Mississi i zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Hillcrest-Rosemont Detention Basin Project DATE: September 1, 2020 City Engineer Gus Psihoyos is recommending acceptance of the public improvement contract for the Hilcrest-Rosemont Detention Basin Project, as completed by Eastern lowa Excavating & Concrete, LLC, and authorizing payment of the contract amount of $127,716.57. I concur with the recommendation and respectfully request Mayor and City Council approval. � Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE CITY OF � All•pmerisa Ci$ Du8 E �m��,��, h� , � �.� , I I MRste iece on the MisSiSsi i zoo�•zoiz=zois � pp zoi�*zot9 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: August 25, 2020 RE: Hillcrest-Rosemont Detention Basin Project INTRODUCTION The enclosed resolution provides for the acceptance of the Public Improvement Contract for the Hillcrest-Rosemont Detention Basin Project. DISCUSSION The Hillcrest-Rosemont Detention Basin Project involved the excavation and hauling of approximately 3,800 cubic yards of fill material from a designated site to a farm field just north of the Hillcrest-Rosemont intersection where it was used to construct an approximately twelve-foot-high embankment. The detention outlet works included a 48- inch diameter manhole and 62 feet of a combination of 12-inch and 24-inch diameter storm sewer pipe. The overflow spillway and outlet include a combination of 2,093 square feet of tied concrete block matting. Additional project costs arose due to weather delays and the need for temporary seeding in late fall of 2019 to stabilize the site prior to winter. The site was then re-seeded with the permanent seed mix in the spring of 2020. Also, additional work was also required to stabilize the soil below the detention basin embankment prior to its construction. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $127,716.57 to Eastern lowa Excavating & Concrete, LLC of Cascade, IA, for the Hillcrest / Rosemont Storm Sewer Reconstruction Project. BUDGETIMPACT The project cost for the Hillcrest-Rosemont Detention Basin Project is summarized below: Description Estimate Award Final Construction $ 122,710.20 $ 106,181.61 $127,716.57 Contingency 12,271.02 12,271.02 Engineering, Construction 20,247.18 20,247.18 19,157.57 Administration & Ins ection Total Construction Cost $ 155,228.40 $ 138,699.81 $146,874.06 The funding is as follows: CIP No. Fund Description Fund Amount 7202758 Hillcrest-Rosemont Detention $146,874.06 ACTION TO BE TAKEN I respectfully request adoption of the attached resolution accepting the improvements and authorizing payment of the contract amount of $127,716.57 to Eastern lowa Excavating & Concrete, LLC for the Hillcrest-Rosemont Detention Basin Project. cc: Deron Muehring, Civil Engineer II 2 Prepared by Gus Psihoyos, City Engineer, 50 W. 13th St., Dubuque, IA 52001, 563-589-4276 Return to Kevin Firnstahl, City Clerk, 50 W. 13th St., Dubuque, IA 52001, 563-589-4100 RESOLUTION NO. 271-20 ACCEPTING THE HILLCREST / ROSEMONT DETENTION BASIN PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Hlllcrest / Rosemont Detention Basin Project, (the Project) has been completed by the Contractor, Eastern Iowa Excavating & Concrete, LLC (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $127,716.57; WHEREAS, the Contractor has previously been paid $121,330.74, leaving a balance of $6,385.83; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA THAT: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $6,385.83 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 8th day of September 2020. Attest: Kevnt Firnstah'7k.,MC City Clerk °lJ d Roy D. Buol, Mayor i � , CITY ENGWEER'S CER�'IFICATE OF FINAL COMPLETION OF FiILLCREST / I� ROSEMONT DETENTION BASIN PROJECT The undersigned City Engineer of the City of Dubuque, lowa, hereby certifies that �, he has inspected the Hillcrest / Rosemont Detention Basin Project has been performed ' in compliance with the terms of the Public Improvement Contract, and that the total cost , of the completed work is $146,874.06. Dated this 28th day of Auqust 2020. �� Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the ���day of 2020. r _...,.�. .�.�,a,„�� K n S. Fornstahl, MC, City Clerk