Kephart Building Renovation Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Kephart Building Improvement Project (CIPs 3601976/2601976 /1011976) DATE: May 11, 2010 Dubuque kigtd All- AmedcaCity 1 m 2007 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Kephart Building Improvement Project, as completed by Klauer Construction Company, in the final contract amount of $710,273.51. The Kephart Building Improvement Project was completed by Klauer Construction Company of Dubuque, Iowa, in the final contract amount of $710,273.51, which is a 22.9% increase from the original contract amount of $557,992.00. The cost increase was due substantially to unforeseen conditions that required repairs to the building's structural framing and exterior envelope. Additional insulation was also added to improve overall energy efficiency and reduce long term operating costs. Minor increases to the contract were also authorized for modifications to the mechanical, electrical and plumbing systems along with adjustments to the interior finishes. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Michael C. Van Milligen Masterpiece on the Mississippi Dubuque A14nudaaur e 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: May 10, 2010 SUBJECT: Kephart Building Improvement Project (CIPs 3601976/2601976/1011976) INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Kephart Building Improvement Project. BACKGROUND The Kephart Building Improvement Project consisted of a remodel to the first floor and basement of the former Kephart Music Building, located at 1157 Central Avenue in Dubuque, Iowa. 1. First Floor 2. Basement Other - Conversion of the space to the Multicultural Family Center. — Selective demolition. - Addition of a sprinkler system. — Addition of a stairwell and elevator to all levels. - Work included: wood studs and gypsum board, new finishes, a fireplace, ADA required improvements, new furnishings and new HVAC /electrical systems. - A portion of salvaged materials from the Roshek Building was re -used, including some bathroom fixtures and accessories, and ceiling tile. — Selective demolition. - Addition of a sprinkler system. - Work included: Partial renovation to include stairwell and elevator, new mechanical and electrical spaces. Miscellaneous exterior work: Masonry tuckpointing and reworking the existing storefront to include a new entry. The existing roof materials were removed and replaced on the high and low roofs with new insulation and a new membrane. PROJECT COSTS AWARD FINAL Construction Hard Costs Base Construction Work $ 569,000.00 $ 569,000.00 Change Orders $ 132,282.51 Optional Construction Add Alternates 1) Automatic Door Openers $ 8,992.00 $ 8,992.00 2) Light Tubes on Low Roof 0.00 0.00 3) Low Roof Perimeter Security Fence 0.00 0.00 Contingency — 10% $ 56,900.00 0.00 Total - Construction Costs 577 992.00 '. 710 273.51 DISCUSSION The Kephart Building Improvement Project was completed by Klauer Construction Company of Dubuque, Iowa, in the final contract amount of $710,273.51, which is a 22.9% increase from the original contract amount of $557,992.00. The cost increase was due substantially to unforeseen conditions that required repairs to the building's structural framing and exterior envelope. Additional insulation was also added to improve overall energy efficiency and reduce long term operating costs. Minor increases to the contract were also authorized for modifications to the mechanical, electrical and plumbing systems along with adjustments to the interior finishes. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $710,273.51 to Klauer Construction Company for the Kephart Building Improvement Project. PROJECT COST - BUDGET IMPACT The cost for the Kephart Building Improvement Project is summarized as follows: CITY FUNDING SOURCES CIP No. Fund Description Funding Amount 3601976/ 2601976/ 1011976 DRA Distribution $ 108,300.00 Sales Tax (20 %) $ 126,234.00 CDBG Funds $ 475,780.00 GO Bond (TIF Abated) $ 385,543.75 General Funds $ 120,333.00 Transfer Saving — Port Plaza Phase I $ 2,443.00 Total City Funding $1,218,663.75 The construction contract funding summary is as follows: The base renovation project was funded from CIPs 3601976, 2601976, and 1011976, which has a total amount of $1,218,663.75 budgeted to fund all project work including the design phase, building purchase, early deconstruction project, roof replacement project, asbestos removal, information technology purchases, and furniture purchases. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $710,273.51 to Klauer Construction Company for the Kephart Building Improvement Project. Prepared by Steve Sampson Brown, Project Manager cc: Jenny Larson, Budget Director Rich Russell, Building Services Manager David Harris, Housing and Development Director Steve Sampson Brown, Project Manager RESOLUTION NO. 154 -10 ACCEPTING THE KEPHART BUILDING IMPROVEMENT PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Kephart Building Improvement Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Kephart Building Improvements Capital Improvement Project, Dubuque Racing Association distribution, sales tax, Community Development Block Grant funds, general obligation bonds (TIF abated) and general funds appropriations for the contract amount of $710,273.51 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Att Passed, approved and adopted this 17th day of eanne F. Schneider, CMC, i y Clerk May , 2010. Roy D. uol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE KEPHART BUILDING IMPROVEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Kephart Building Improvement Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $710,273.51. Dated this /04 day of MO , 2010. City Engineer Gus Psihoyos Filed in the office of the City Clerk on the 10th day of May, 2010 Jeanne F. Schneider, CMC, City Clerk CHANGE ORDER SUMMARY: ADDITIONS DEDUCTIONS Total changes approved in previous months by Owner $ 132;281.51 $ 0.00 Total approved this month $ 0.00 $ 0.00 TOTAL $ 132,281.51 $ 0.00 NET CHANGES by Change Order $ 132,281.51 I?1!. AIA Document G7O2TM -1992 App °iicationandd:Certificate for Payment TO OWNER: Citv.of Duq 50, - i 3thub1Street ue PROJECT: Dubuque,4lA 52001 FROM. i on Company `""'10,15 Century Circle Dubuque,IA..52002 CONTRACTOR'S APPLICATION FOR PAYMENT Total Retainage (Lines 5a + or Total in Column 1 of G703) $ 6. TOTAL EARNED LESS RETAINAGE $ (Line -4 minus Line 5 Total) 7. LESS PREVIOUS CERTIFICATES - FOR PAYMENT $ (Line - 6 from prior Certificate) 8. CURRENT. PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Lme.3 minus Line 6) KEPART BUILDING VIA ARCHITEC� Application is made for payment, as shown below, in connection with the Contract. AIA Document G703TM, Continuation Sheet, is attached. 1. ORIGINAL CONTRACT SUM $ 2. NET CHANGE BY CHANGE ORDERS $ 3. CONTRACT SUM TO DATE (Line 1 ± 2) $ 4. TOTAL-COMPLETED & STORED TO DATE (Column G on G703) $ 710,273.51 5. RETAINAGE: a. 5:0o a% of Completed Work (Columns D + E on G703) $ b S.°°% of Stored Material (Column F on G703) $' 0.00 0.00 0.00 577,992.00 132,281.51 710,273.51 710,273.51 674,759.81 35,513. /0 RECEIVED DEC 0 3 2009 DURk�"►N'f i.. :c>jue tA . APPLICATION-NO:: 8 PERIOD TO: 11/30/2009 By: State of: IA County of ARCHITE By: CO K C A T I BUILDING IMPROVEMENTS CONTRACT DATE: :4/14/2009 PROJECT NOS: Subscribed and sworn to before 1 me this !!: - dayof - k . ) Notary Publ 0.00 My commission ex es: 1_ ARCHITECT'S CERTIFICATEFOR PAYMENT CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. Page 1 of 3 Date: NOV 30,2009 Date: 2' L1 + 10 Distribution to: OWNER ARCHITECT CONTRACTOR FIELD OTHER The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Paymen/ ere issued and payments received from the Owner, and that current payment she herein i due. _ CONTRACTOR: Kl ._ts Con - r•�� �n r ompany .r1 LJ/ KRI6TINE K 194323 Number �.0 sioon ExPhiss AIA Document G702*"' —1992. Copyright © 1953, 1963, 1965, 1971, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Ale Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright @aia.org. In accordance with the.Contract Documents, based on on = site observations and the data comprising this application, the Architect certifies to the Owner that :to the best of the Architect's knowledge, information and belief the Work has :progressed as "indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of. the AMOUNT CERTIFIED. AMOUNT CERTIFIED $ '1/2t 51 ' 2 ).7o (Attach explanation if amount certified differs from the amount applied. Initial all figures on this Application and on the Continuation Sheet that are changed to conform with the amount certified.) This Certificate is nit negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and of payment are without prejudice to any rights of the Owner or Contractor under this Contract. A B C D E F G H I ITEM NO. DESCRIPTION OF WORK SCHEDULED VALUE WORK COMPLETED MATERIALS PRESENTLY STORED (NotinDorE) TOTAL COMPLETED AND STORED TO DATE (D +E +F) % (G _ C) BALANCE TO FINISH (C - G) RETAINAGE (If variable rate) FROM PREVIOUS APPLICATION (D +E) THIS PERIOD i i m2�113 2nDmvo02cn co n gnv ; v � C = m m n_ -� m m r :rmits & Bonds 11,527.00 11,527.00 0.00 0.00 11,527.00 100 0.00 0.00 :neral Conditions 9,060.00 9,060.00 0.00 0.00 9,060.00 100 0.00 0.00 aof:Sheathing Allowance 2,000.00 2,000.00 0.00 0.00 2,000.00 100 0.00 0.00 cavation /Demo Sub 14,480.00 14,480.00 0.00 0.00 14,480.00 100 0.00 0.00 tmolition - 18,600.00 18,600.00 0.00 0.00 18,600.00 - 100 0.00 0.00 ancrete 4,500.00 4,500.00 0.00 0.00 4,500.00 100 0.00 0.00 lsonry 2,345.00 2,345.00 0.00 0.00 2,345.00 100 0.00 0.00 eV Steel & Handrails 6,680.00 6,680.00 0.00 0.00 6,680.00 100 0.00 0.00 isework 37,243.00 37,243.00 0.00 0.00 _ 37,243.00 100 .0.00 0.00 iartz Surfacing 3,375.00 3,375.00 0.00 0.00 3,375.00 100 0.00 0.00 ring Wall 7,403.00 7,403.00 0.00 0.00 7,403.00 100 0.00 0.00 meral Construction 111,65100 111,653.00 0.00 0.00 111,653.00 100 0.00 0.00 ray Insulation 12,298:00 12,298.00 0.00 0.00 12,298.00 100 0.00 0.00 ttiInsulation 5,975.00 5,975.00 0.00 0.00 5,975.00 100 0.00 0.00 ass & Glazing 14,540.00 14,540.00 0.00 0.00 14,540.00 100 0.00 0.00 inting 12,494.00 12,494.00 0.00 0.00 12,494.00 100 0.00 0.00 mall 26,500.00 26,500.00 0.00 0.00 26,500.00 100 0.00 0.00 ?S 1,685.00 1,685.00 0.00 0.00 1,685.00 100 0.00 0.00 T. 7,695.00 7,695.00 0.00 0.00 7,695.00 100 0.00 0.00 ramic Tile 3,885.00 3,885.00 0.00 0.00 3,885.00 100 0.00 0.00 rpet, Resilent Tile, & Base 33,900.00 33,900.00 0.00 0.00 33,900.00 100 0.00 0.00 umbing 23,225.00 23,225.00 0.00 0.00 23,225.00 100 0.00 0.00 re 6uppression Piping 25,315.00 25,315.00 0.00 0.00 25,315.00 100 0.00 0.00 /AC 59,464.00 59,464.00 0.00 0.00 59,464.00 100 0.00 0.00 ectrical 122,150.00 122,150.00 0.00 0.00 122,150.00 100 0.00 0.00 GRAND TOTAL 577,992.00 577,992.00 0.00 0.00 577,992.00 100 0.00 0.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Continuatiin Sheet Document G7O3TM -1992 T City of Dubuque 50 W 13th. Street Dubuque;IA 52001 MA Document G . 02TM „Application'and Certification for Payment, containing Contractor's signed is attached. In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. Project: KEPART BUILDING APPLICATION N08 APPLICATION: DATIFt30 /2009 PERIOD TO1 /30/2009 ARCHITECT'S PROJECT -NO: From- Contractor: Klauer Construction Company 1015 Century Circle Dubuque,•IA 52002 CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. Page 2 of 3 AIA Document G703 -1992. Copyright © 1963, 1965, 1966, 1967, 1970, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This AlA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright @aia.org. A B C D E F G H I ITEM NO. DESCRIPTION OF WORK SCHEDULED VALUE WORK COMPLETED MATERIALS PRESENTLY STORED (Not in D or E) TOTAL COMPLETED AND STORED TO DATE (D.+ E + F) % (G _ C) BALANCE TO FINISH (C G) RETAINAGE (If variable rate) FROM PREVIOUS APPLICATION (D + E) THIS PERIOD U U 6 U D.#1 54,676.49 54,676.49 0.00 0.00 54,676.49 100 0.00 0.00 D. #2 64,339.54 64,339.54 0.00 0.00 64,339.54 100 0.00 0.00 D., #3 6,862.99 6,862.99 0.00 0.00 6,862.99 100 0.00 0.00 D. #4 6,402.49 6,402.49 0.00 0.00 6,402.49 100 0.00 0.00 GRAND TOTAL 710,273.51 710,273.51 0.00 0.00 710,273.51 100 0.00 0.00 26 27 28 29 1 Continuation Sheet Document G703TM - 992 o 1DDubugeet Dubuque, IA 52001 AIA Document GZ02T Certification for Payment, containing.Contractor's signed.certificationis attached. In tabulations below, amounts are to the nearest dollar. Use Column I on Cpntracts where variable retainage for line items may apply. Project: KEPART BUILDING APPLICATION NO APPLICATION DATE;;o /2009 PERIOD Ta/30/2009 ARCHITECT'S PROJECT NO: From.Contractor:- -- Klauer CpnstructiomCor,�tpany 1015 CenturyCircle' Dubuque, 4A,52002-7-- . Page 3 of 3 CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AIA Document G703T —1992. Copyright © 1963, 1965, 1966, 1967, 1970, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This Ale Document is protected by U.S. Copyright Law and international Treaties. Unauthorized reproduction or distribution of this AlA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright ©aia.org.