Acceptance of Cedar Street Force Main Air Vacuum Release Valve Replacement Project Copyrighted January 19, 2021 City of Dubuque Consent Items # 8. City Council Meeting ITEM TITLE: Acceptance of CedarStreet Force MainAirVacuum Release Valve Replacement Project SUM MARY: City Manager recommending acceptance of the public improvement contract for the Cedar Street Force Main Air Vacuum Release Valve Replacement Project, as completed by Tschiggfrie Excavating Co., in the final contract amount of$185,397.81. RESOLUTION Accepting the Cedar Street Force Main Air Vacuum Release Valve Replacement Project and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Cedar Street Force Main Air Vacuum Release Valve City Manager Memo Replacement Project-MVM Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY OF � ui-Aseria cih DuB E , . � . , � II � Maste iece on tj2e Mississi i zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Cedar Street Force Main Air Vacuum Release Valve Replacement Project Acceptance Construction Contract C I P #710-2602 DATE: January 13, 2021 Project Manager Steve Sampson Brown is recommending acceptance of the public improvement contract for the Cedar Street Force Main Air Vacuum Release Valve Replacement Project, as completed by Tschiggfrie Excavating Co., in the final contract amount of$185,397.81. This is 39.4% over the bid amount of$132,955.00 due to unforeseen conditions which required additional work to bypass pump sewer flow upstream to the Cedar Street Lift Station and plumbing and vault modifications needed to launch the internal pipe inspection tool. I concur with the recommendation and respectfully request Mayor and City Council approval. � Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Steve Sampson Brown, Project Manager Dubuque THE CITY OF � Alf•Ameriea Git� Du B E �,�., , �,� ���, I I Maste iece on the Mississi i Z°°'�Z°1Z'z°13 � pp zoi�*zoi� TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Steve Sampson Brown, Project Manager DATE: January 11, 2021 RE: Cedar Street Force Main Air Vacuum Release Valve Replacement Project Acceptance Construction Contract CIP #: 710-2606 INTRODUCTION The attached resolution provides for the acceptance of the Public Improvement Contract for the Cedar Street Force Main Air Vacuum Release Valve Replacement Project. BACKGROUND In general, a force main system is comprised of lift stations and pressurized sanitary sewer pipes known as force mains. Each component of the sanitary sewer utility lift station and force main system requires periodic evaluation and improvements so that they remain in reliable condition and can fulfill their vital role in conveying the City's wastewater to the treatment plant. Approximately 80% of wastewater that flows to the Water & Resource Recovery Center (W&RRC) for treatment arrives via the City's Cedar Street and Terminal Street lift stations through a 30" and then 42" force main pipe network. The existing 42" force main which runs between the Terminal Street Lift Station and the W&RRC was constructed in 1977 and is made of prestressed concrete cylinder pipe. The Cedar/Terminal force main system is beginning to show signs of wear and there is a need to evaluate and plan for system improvements. DISCUSSION In June of 2019 the City Council authorized the release of a Request for Proposals (RFP) related to selecting a vendor to conduct a remote, internal pipe inspection of the 42" force main. After a vendor was selected, City staff and the project's consulting engineer from Strand Associates, Inc. worked with the pipe inspection vendor to determine the best insertion location for the inspection tool and the project schedule. The existing valve vault at the intersection of 14t" Street and Sycamore Street was the selected location for inserting the tool. In March of 2020, in order to make this location ready to receive the pipe inspection tool, this project was bid so that several modifications to the concrete value vault and force main piping could be completed. This project included modifications and replacement of Page 1 of 2 air release/vacuum valve on the Cedar Street force main. The work consisted of demolition and modifications to the existing valve vault structure, excavation and placement of a new structure top slab with improved access doors, and various ductile iron pipe work including new air/vacuum valves, pipe restoration, and other minor items. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of$185,397.81 to Tschiggfrie Excavating Co. for the Cedar Street Force Main Air Vacuum Release Valve Replacement Project. The final contract amount is 39.4% over the bid amount of$132,955.00 due to unforeseen conditions which required additional work to bypass pump sewer flow upstream Cedar Street Lift Station and plumbing and vault modifications need to launch the internal pipe inspection tool. BUDGETIMPACT The estimate of probable cost for this project is summarized as follows: Descri tion Estimate Award Final Construction Contract— Base Bid $135,000.00 $132,955.00 $185,397.81 Contingenc 10%) $13,500.00 $13,500.00 $0.00 Contract Admin $4,500.00 $4,500.00 $4,500.00 Total Project Cost $152,550.00 $150,955.00 $189,891.81 The funding summary for the Cedar Street Force Main Air Vacuum Release Valve Replacement Project is as follows: CIP Fundinq Source Amount 710-2606 Cedar and Terminal Street Force Mains and Lift $189, 891.81 Station Assessment and Improvements Pro'ect ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution accepting the Public Improvement Contract and to authorize the payment of the contract amount of $185,397.81 to Tschiggfrie Excavating, Company of Dubuque, IA, for the Cedar Street Force Main Air Vacuum Release Valve Replacement Project. Attachments SSB/kb cc: John Klostermann, Public Works Director Willie O'Brien, W&RRC Manager Deron Muehring, Civil Engineer Todd Irwin, Engineering Technician F:\PROJECTS\Sanitary\Cedar-Terminal Lift Stations and FMs Assessment\Internal Pipe Inspection\City Council Documentation\1_Initiate\Cedar St FM Air Vacuum Release Valve Replacement Acceptance Memo 01.11.2021.docx Page 2 of 2 Prepared by Steve Sampson Brown Project Manager, 50 W. 13th St Dubuque IA 52001 (563) 589-4276 Return to Adrienne N. Breitfelder, City Clerk, 50 W. 13th St., Dubuque, IA 52001, (563) 589-4100 RESOLUTION NO. 10-21 ACCEPTING THE CEDAR STREET FORCE MAIN AIR VACUUM RELEASE VALVE REPLACEMENT PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Cedar Street Force Main Air Vacuum Release Valve Replacement Project (the Project) has been completed by the Contractor, Tschiggfrie Company, Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS; the final contract amount for the Project is $185,397.81; WHEREAS, the Contractor has previously been paid $176,127.92, leaving a balance of $9,269.89; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $9,269.89 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 19th day of January 2021. - " '.'w) /.,L/ Roy D. B ol, Mayor Attest: Adrienne N. Breitfelder, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF CEDAR STREET FORCE MAIN AIR VACUUM RELEASE VALVE REPLACEMENT PROJECT The undersigned City Engineer of the City of Dubuque, lowa, hereby certifies that he has inspected the Cedar Street Force Main Air Vacuum Release Valve Replacement Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $185,397.81. Dated this 13t" day of January 2021. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 13th day of January 2021. /� 1, � � f j �r'�f . � f���' .� .{. � . :.r � ' � �- . Adrienne N. Breitfelder, City Clerk