Minutes_Mechanical Board 5 19 10Masterpiece on the Mississippi Dubuque A9 AmefCa cihr 2007 MINUTES OF MEETING MECHANICAL BOARD Building Services Dept. 50 West 13 St Dubuque, IA 52001 Phone — 563 -589 -4150 Fax — 563- 690 -6687 DATE: Wednesday, May 19 2010 TIME: 16:01 P.M. PLACE: Conference Room A, City Hall, Dubuque, IA. CHAIR: Tom Giese MEMBERS PRESENT: Gary Hillard, Corey Valaskey, Mike Kelly Tom Giese, Jack Papin, Dave Grothe, Ron Billmeyer MEMBERS ABSENT: None STAFF: Tom Reed MEDIA: None OTHERS: None Meeting called to order by Tom Giese at 16:01 P.M. Tom Giese read the minutes from last meeting. Motion made by Gary Hillard to receive and file previous meetings minutes seconded by Mike Kelly. Dave Grothe made a motion nominating Tom Giese to continue as Chairperson seconded by Gary Hillard. Motion Passed 6 -0 Tom Giese accepted. Motion made by Tom Giese seconded by Dave Grothe to accept the International Energy Conservation Code 2009 sections that pertain to mechanical in their entirety. Motion carried 5 yeas, Gary Hillard nay, Mike Kelly abstained. Discussion was held on testing of natural and L.P .gas piping. Sections 406.4.1 and 406.4.2 of the International Fuel Gas Code `Test Pressure' and `Test Duration' were looked at. The board asked the secretary what currently was being enforced for the testing of fuel gas piping. Currently we require a test of 15 psi for 15 minutes for 1 /4 psi systems and 60 P.S.I. for 30 minutes for underground piping, welded and 2, 5 or 10 pound systems. Corey Valaskey stated that no contractor would take the time to figure out the cubic feet of the gas piping system and we should come up with something that would be easier for the contractors and inspectors to enforce. He also stated that 15 psi. for 15 minutes test would be sufficient for a fuel gas piping system of approximately 1900 lineal feet of 2" pipe. Motion was made by Dave Grothe and seconded by Gary Hillard to require all L.P. and Natural fuel gas piping systems of'/ psi or 2 psi to be tested at 15 psi. for no less than 15 minutes. The gauge to be used shall be a 30 psi gauge with 1 /4 pound increments. Motion Carried 7 -0 Motion was made by Mike Kelly to require all L.P. and Natural fuel gas piping systems greater than 2 psi to be tested at 50 psi for no less than 30 minutes. The motion was amended by Gary Hillard and seconded by Jack Papin to also require a 100 psi gauge with maximum 2 pound increments. Motion carried 7 -0 Motion was made by Mike Kelly and seconded by Corey Valaskey to accept the 2009 International Fuel Gas Code with appendix A and B and amending by repealing section 406.4.2 Test Duration. Motion passed 7 -0. Discussion was held on setting 4 dates for mechanical board meetings. August 12 and November 9 of 2010. The 2nd month of each quarter and the second week on Thursday's. The Mechanical Board will meet in 2011 on February 10 th, May 12th, August 1 1 th , and November 10 at 4:00 P.M. Conference room A. Motion to adjourn at 17:44 P.M. By Gary Hillard and seconded by Mike Kelly. Approved this day of , 2010. Thomas P. Reed, Secretary Chairperson