Minutes_Mechanical Board 5 19 10Masterpiece on the Mississippi
Dubuque
A9 AmefCa cihr
2007
MINUTES OF MEETING
MECHANICAL BOARD
Building Services Dept.
50 West 13 St
Dubuque, IA 52001
Phone — 563 -589 -4150
Fax — 563- 690 -6687
DATE: Wednesday, May 19 2010
TIME: 16:01 P.M.
PLACE: Conference Room A, City Hall, Dubuque, IA.
CHAIR: Tom Giese
MEMBERS PRESENT: Gary Hillard, Corey Valaskey, Mike Kelly
Tom Giese, Jack Papin, Dave Grothe, Ron Billmeyer
MEMBERS ABSENT: None
STAFF: Tom Reed
MEDIA: None
OTHERS: None
Meeting called to order by Tom Giese at 16:01 P.M.
Tom Giese read the minutes from last meeting. Motion made by Gary Hillard to receive and file
previous meetings minutes seconded by Mike Kelly.
Dave Grothe made a motion nominating Tom Giese to continue as Chairperson seconded by
Gary Hillard. Motion Passed 6 -0 Tom Giese accepted.
Motion made by Tom Giese seconded by Dave Grothe to accept the International Energy
Conservation Code 2009 sections that pertain to mechanical in their entirety. Motion carried 5
yeas, Gary Hillard nay, Mike Kelly abstained.
Discussion was held on testing of natural and L.P .gas piping. Sections 406.4.1 and 406.4.2 of
the International Fuel Gas Code `Test Pressure' and `Test Duration' were looked at. The board
asked the secretary what currently was being enforced for the testing of fuel gas piping.
Currently we require a test of 15 psi for 15 minutes for 1 /4 psi systems and 60 P.S.I. for 30
minutes for underground piping, welded and 2, 5 or 10 pound systems. Corey Valaskey stated
that no contractor would take the time to figure out the cubic feet of the gas piping system and
we should come up with something that would be easier for the contractors and inspectors to
enforce. He also stated that 15 psi. for 15 minutes test would be sufficient for a fuel gas piping
system of approximately 1900 lineal feet of 2" pipe.
Motion was made by Dave Grothe and seconded by Gary Hillard to require all L.P. and Natural
fuel gas piping systems of'/ psi or 2 psi to be tested at 15 psi. for no less than 15 minutes. The
gauge to be used shall be a 30 psi gauge with 1 /4 pound increments. Motion Carried 7 -0
Motion was made by Mike Kelly to require all L.P. and Natural fuel gas piping systems greater
than 2 psi to be tested at 50 psi for no less than 30 minutes. The motion was amended by Gary
Hillard and seconded by Jack Papin to also require a 100 psi gauge with maximum 2 pound
increments. Motion carried 7 -0
Motion was made by Mike Kelly and seconded by Corey Valaskey to accept the 2009
International Fuel Gas Code with appendix A and B and amending by repealing section 406.4.2
Test Duration. Motion passed 7 -0.
Discussion was held on setting 4 dates for mechanical board meetings. August 12 and
November 9 of 2010. The 2nd month of each quarter and the second week on Thursday's. The
Mechanical Board will meet in 2011 on February 10 th, May 12th, August 1 1 th , and November 10
at 4:00 P.M. Conference room A.
Motion to adjourn at 17:44 P.M. By Gary Hillard and seconded by Mike Kelly.
Approved this day of , 2010.
Thomas P. Reed, Secretary