West Locust Storm Sew Addn FinaTO: The Hot
FROM: Michael
SUBJECT: West Lc
Assistant City Engine
Storm Sewer Additior
contract amount of $2
During construction,
The bid documents c~
sewer; the actual dist~
The cost of the additi(
the original contract a
percent (70%) or $59
project.
I concur with the reco
approval.
MCVM/jh
Attachment
cc: Barry Lindahl,
MEMORANDUM
July 2, 2003
~rabie Mayor and City Council Members
Van Milligen, City Manager
cust Storm Sewer Addition Project Acceptance
,~r Gus Psihoyos is recommending acceptance of the West Locust
Project, as completed by Connolly Construction, in the final
68,865.75.
9 feet of the existing storm sewer was found to be beyond repair.
~lled for the installation of 1,054 feet of 48-inch diameter storm
~nce was 1,446 feet, an increase of 431 feet.
~nal materials required and the additional work performed exceeds
mount by $85,044.43, 53.7% over the original contract. Seventy
528.36 of the cost increase was due to the expansion of the
'nmendation and respectfully request Mayor and City Council
M~n Milligen~
3orporation Counsel
Cindy Steinhaqser, Assistant City Manager
Gus Psihoyos, Assistant City Engineer
Mike Koch, Public Works Director
TO: Michael
FROM: Gus Psi
SUBJECT: West Lc
INTRODUCTION
The enclosed resolut
West Locust Storm S
MEMORANDUM
July 2, 2003
C. Van Milligen, City Manager
~oyos, Assistant City Engineer
cust Storm Sewer Addition Project Acceptance
OhS provide for the acceptance of the construction contract for the
.~wer Addition Project.
BACKGROUND ~
The project called forlthe installation
from Kirkwood Stree
extended a short di
Avenue Street Recor
The project was awl
construction contract
DISCUSSION
of a 48-inch storm sewer along West Locust Street
: to Rosedale Avenue. In addition, a 36-inch storm sewer was
stance up Rosedale Avenue in conjunction with the Rosedale
struction Project budgeted for Fiscal Year 2005.
~rded to Connolly Construction of Peosta, Iowa, with an original
for $183,821.32.
During construction, $9 feet of the existing storm sewer was found to be beyond repair.
The bid documents called for the installation of 1,054 feet of 48-inch diameter storm
sewer; the actual diS. tance was 1,446 feet, an increase of 431 feet. Besides the
additional pipe required, the increased length of the project requires additional
excavation, pipe bedding, backfill material, street base stone, and asphalt.
/
The cost of the additional materials required and the additional work performed exceeds
the original contract amount' by $85,044.43, 53.7% over the original contract. Seventy
percent (70%) or $519,528.36 of the cost increase was due to the expansion of the
project -the installatibn of the 431 additional feet of 48-inch storm sewer.
Connolly ConstructiSn has completed the project in the final contract amount of
$268,865.75.
BUDGET IMPACT
The summary of the I~roject costs is as follows:
Bid
Construction Contrac
Contingency
Engineering
Total Project Cost
Award
Final
$204,984.20 $183,821.32 $268,865.75
20,498.42 20,498.42 0
33,822.39 33,822.39 8,775.73
$238,142.13
$259,305.01
$277,641.48
D
that the City Council adopt the attached resolutions accepting the
~tablishing the final construction cost for the West Locust Storm
uehring
Administrative Services Manager
:h, Public Works Director
g, Civil Engineer
Prepared by Deren IV
cc: Pauline Joyce,
Michael A. Ko~
Deron Muehrir
I respectfully request
improvements and e
Sewer Addition Pm
Repair Fund.
ACTION REQUESTE
/
The project is funde~d from a Fiscal Year 2003 General Fund appropriation in the
amount of $258,000. The balance of the project will be from the General Storm Sewer
RESOLUTION NO. 217-03
ACCEPTING IMPROVEMENT
Whereas, the contract for the West Locust Storm Sewer Addition Project
has been completed and the City Manager has examined the work and filed his
certificate stating that the same has been completed according to the terms of
the contract, plans and specifications and recommends its acceptance.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
Section 1. That the recommendation of the City Manager be approved
and that said improvement be and the same is hereby accepted.
BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby
directed to pay to the contractor from the General Fund and the General Storm
Sewer Repair Fund in amount equal to the amount of his contract, less any
retained percentage provided for therein.
Passed, approved and adopted this 7th
day ofJuly ,2003.
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO. 218-03
FINAL ESTIMATE
Whereas, the contract for the West Locust Storm Sewer Addition Project
has been completed and the City Engineer has submitted his final estimate
showing the cost thereof including the cost of estimates, notices and inspection
and all miscellaneous costs.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
Section 1. That the cost of said improvement is hereby determined to
be $277,641.48 and the said amount shall be paid from the General Fund and
the General Storm Sewer Repair Fund of the City of Dubuque, Iowa.
Passed, approved and adopted this 7th
day of July ,2003.
Terrance M. Duggan, Mayor
Attest: