Loading...
Lower Bee Branch Security Network Project ClP #3401654, Project #4X0007 Acceptance of Construction Contract Copyrig hted March 15, 2021 City of Dubuque Consent Items # 15. City Council Meeting ITEM TITLE: Lower Bee Branch Security Network Project CI P#3401654, Project #4X0007 SUM MARY: City Manager recommending acceptance of the construction contract for the Lower Bee Branch Security Network Project, as completed by Utility Service Contractors, in the final contract amount of$255,915.25, which is 1.35% lower than the bid amount of$259,414.00. RESOLUTION Accepting the Lower Bee Branch Security Network Project and authorizing the payment of the contract amount to the contractor SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Lower Bee Branch Security Network Project-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY OF � ui-Aseria cih DuB E , . � . , � II � Maste iece on tj2e Mississi i zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Lower Bee Branch Security Network Project CIP #3401654, Project #4X0007 DATE: March 8, 2021 City Engineer Gus Psihoyos recommends acceptance of the construction contract for the Lower Bee Branch Security Network Project, as completed by Utility Service Contractors, in the final contract amount of $255,915.25, which is 1.35% lower than the bid amount of $259,414.00. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE CITY OF � AIF Ilmerica Cit� DuB E �,�`�.�� , � �,�:; I � Maste teC2 OY1 t�12 M1SS15S1 1 zoo��zoiztzoi3 � pp zoi�*zo�a TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Lower Bee Branch Security Network Project CIP# 3401654, PROJECT# 4X0007 DATE: March 4, 2021 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Lower Bee Branch Security Network Project. BACKGROUND In June of 2010, the City Council awarded the construction contract for the Lower Bee Branch Creek Restoration Project in the amount of$10,836,588.85. Because the bid was more than 25% over the engineer's estimate of probable cost, the construction of ancillary improvements such as the security camera network for the trail system were delayed. In November of 2013 the City Council passed Resolution 335-13 adopting the 2013 Drainage Basin Master Plan Amendment. The 2013 Amendment did not replace the 2001 Drainage Basin Master Plan. Instead, it built upon its foundation. The amended Drainage Basin Master Plan outlined several improvements throughout the Bee Branch watershed to mitigate the effects of future flooding and disasters. Collectively, the improvements form the basis of the Bee Branch Watershed Flood Mitigation Project. In December of 2013, the lowa Flood Mitigation Board voted to approve the City's use of $98,494,178 in state sales tax increment funding for the Bee Branch Watershed Flood Mitigation Project. DISCUSSION Work on the Lower Bee Branch Security Network Project has been completed. The work consisted of the installation of approximately 10,000 feet of fiber-optic conduit and micro- duct with 5,600 feet of fiber-optic cable and 5,300 feet of electric conduit along the Lower Bee Branch Creek. Two network cabinets were installed and integrated into the City-wide network. A total of 21 cameras were installed to cover the creek, trail, and adjacent roadways. It also includes the installation of an irrigation controller, back flow preventer, and 130 linear feet of 2-inch copper water service to provide a permanent irrigation system for the landscaping along the creek. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of$255,915.25 to Utility Service Contractors of Hiawatha, lowa for the Lower Bee Branch Security Network Project. Which is 1.35% lower than the bid amount of$259,414.00 BUDGETIMPACT The project cost for the Lower Bee Branch Security Network Project is as follows: Award Final Construction Contract $259,414.00 $255,915.25 Contingency (10%) 15,163.25 0.00 Engineering 31,842.83 38,387.29 Total Project Cost $306,420.08 $294,302.54 The project funding summary is as follows: CIP No. Fund Description Fund Amount 3401654 Bee Branch Creek Restoration Project $294,302.54 ACTION TO BE TAKEN I respectfully request adoption of the attached resolution accepting the improvements, establishing the final construction contract in the amount of$255,915.25, and authorizing the payment of the contract amount to Utility Service Contractors of Hiawatha, lowa for the Lower Bee Branch Security Network Project. Attach. Prepared by Deron Muehring cc: Crenna Brumwell, City Attorney Jenny Larson, Director of Finance & Budget Deron Muehring, Civil Engineer Prepared by: Deron Muehring, City of Dubuque Engineering 50 W. 13`h Street Dubuque, IA 52001 (563)589-4270 Return to: Adreinne N. Breitbelder, City Clerk, 50W 13th Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 72-21 ACCEPTING THE LOWER BEE BRANCH SECURITY NETWORK PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Lower Bee Branch Security Network Project (the Project) has been completed by the Contractor, Utility Service Contractors, Inc. (Contractor) the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $255,915.25; WHEREAS, the Contractor has previously been paid $243,119.49, leaving a balance of $12,795.76; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $12,795.76 as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 15th day of March 2021. p4ffoy D. Buol, Mayor Attest: Adrienne N. Breitfelder, C6 Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE LOWER BEE BRANCH SECURITY NETWORK PROJECT The undersigned City Engineer of the City of Dubuque, lowa, hereby certifies that he has inspected the Lower Bee Branch Security Network Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $294,302.54. Dated this 4t" day of March 2021. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 4t" day of March 2021. f� i' , }�-' �-' __ � i;r � ,r-� , � I . "+., ; r�fv .. � _ • �i_ . . . . . � - � .. Adrienne N. Breitfelder, City Clerk