2021 Asphalt Overlay Ramp Project 3_Initiate Copyrig hted March 15, 2021 City of Dubuque Items to be set for Public Hearing # 2. City Council Meeting ITEM TITLE: 2021 Asphalt Overlay Ramp Project 3 SUM MARY: City Manager recommending initiation of the public bidding procedure for the 2021 Asphalt Overlay Ramp Project 3, and further recommends that a public hearing be setforApril 5, 2021. RESOLUTION Preliminary approval of plans, specifications, form of contract, and estimated cost; setting date of public hearing on plans, specifications, form of contract, and estimated cost; and ordering the advertisement for bids SUGGESTED Receive and File; Adopt Resolution(s), Set Public Hearing forApril 5, DISPOSITION: 2021Suggested Disposition: ATTACHMENTS: Description Type 2021 Asphalt Overlay Ramp Project 3-MVM Memo City Manager Memo Staff Memo Staff Memo Resolutions Resolutions Dubuque THE CITY OF � ui-Aseria cih DuB E , . � . , � II � Maste iece on tj2e Mississi i zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2021 Asphalt Overlay Ramp Project 3 DATE: March 10, 2021 City Engineer Gus Psihoyos recommends initiation of the public bidding procedure for the 2021 Asphalt Overlay Ramp Project 3, and further recommends that a public hearing be set for April 5, 2021. I concur with the recommendation and respectfully request Mayor and City Council approval. � Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE CITY OF � All•Ameriea Ciq� Du B E �ti,�.,� : .. � I �I�'r � I Maste iece on the Mississi 1 zoo��zolztzois �P pp 2oi�*zoi9 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: March 9, 2021 RE: 2021 Asphalt Overlay Ramp Project 3 INTRODUCTION The attached resolutions authorize the initiation of the public bidding procedure for the 2021 Asphalt Overlay Ramp Project 3. BACKGROUND Since 1990, the City of Dubuque has installed pedestrian access ramps around the City of Dubuque to conform with the American with Disabilities Act (ADA). The pedestrian access ramps allow people with mobility difficulties to access the City's sidewalk system. The design standards for these ramps have evolved over time as more ramps have been installed and standards have changed. Since 2011, The City of Dubuque has followed the "Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way." These are updated standards to use for facilities in the public right-of-way and addressed issues brought up since the original ADA standards were developed. The lowa Department of Transportation has adopted the PROWAG standards. The Federal Highway Administration (FHWA) has also adopted the standards and requires all cities that receive federal funding to follow these standards. DISCUSSION The 2021 Asphalt Overlay Ramp Project 3 will provide for the replacement of fifty-eight (58) access ramps at 14 intersections in conjunction with the Public Works Asphalt Overlay program at the following locations: 1. Saint John Dr at Hillcrest Rd, one single and one double ramps. 2. Saint John Dr at Graham Cir. (South Intersection), four double ramps. 3. Saint John Dr at Westway Street, two single and one double ramps. 4. Graham Cir. At Westway Street, four double ramps. 5. Westway Street at Keyway Dr, one single and one double ramps. 6. Saint John Dr at Suzanne Dr, two single and one double ramps. 7. Saint John Dr at Graham Cir. (North Intersection), four double ramps. 8. Saint Celia Street at Graham Cir. (North Intersection), two single & one double ramps. 9. Saint Celia Street at Lisa Court, two single ramps. 10.Suzanne Dr at Westway Street, two single ramps. 11.Saint Celia Street at Westway Street, two single and two double ramps. 12.Saint Celia Street at Graham Cir. (South Intersection), two single ramps. 13.Saint Celia Street at Hillcrest Rd, two single ramps. 14.Graham Cir. at Graham Court, two single ramps. PUBLIC ENGAGEMENT The Public Works Department mail letters to property owners and the Engineering Department have developed door hangers for residents notifying residents of the overlay and ramp project. PROJECT SCHEDULE The schedule for the Project is as follows: Initiate Public Bidding Process March 15, 2021 Publish Notice to Bidders, Advertise for Bids March 19, 2021 Publish Public Hearing Notice on Plans & Specs March 19, 2021 Public Hearing on Plans & Specifications April 5, 2021 Receipt of Bids (Bid Letting) April 8, 2021 Award Construction Contract April 19, 2021 Final Project Completion August 31, 2021 RECOMMENDATION I recommend preliminary approval of the proposed plans, specifications, form of contract, and construction estimate for the 2021 Asphalt Overlay Ramp Project 3. I further recommend establishing the date of a public hearing and authorize the City Clerk to advertise for bids for the Project. BUDGETIMPACT The preliminary estimate of probable costs for the 2021 Asphalt Overlay Ramp Project 3 is as follows: Description Cost Estimate Construction $ 173,757.00 Contingency 17,375.00 Engineering Design and Administration 38,226.00 Total Construction Cost Estimate $ 229,358.00 The funding summary is as follows: CIP Fund Descri tion Fund Amount 3001227 Curb Ramp Program $ 229,358.00 2 ACTION TO BE TAKEN I respectfully request adoption of the attached resolutions preliminarily approving the proposed plans, specifications, form of contract, and construction estimate; establishing the date of the public hearing; and authorizing the City Clerk to advertise for bids for the 2021 Asphalt Overlay Ramp Project 3. GNP/kb cc: John Klostermann, Public Works Director Jon Dienst, Civil Engineer II 3 Prepared by: Gus Psihovos, City of Dubuque Engineer 50 W 13th Street Dubuque, IA 52001 (563)589-4270 Return to: Adrienne N. Breitfelder, City Clerk 50 W 131h Street Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 75-21 2021 ASPHALT OVERLAY RAMP PROJECT 3 PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the 2021 Asphalt Overlay Ramp Project 3 in the estimated amount of $173,757.00 are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 5th day of April 2021, at 6:30 p.m. in the Historic Federal Building Council Chambers (and/or by virtual means), 350 W. 6th Street, Dubuque, Iowa, at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. 2021 Asphalt Overlay Ramp Project 3 is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Engineer is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in the Master Builders of Iowa Plan Room, The Construction Update Network and posted on the City of Dubuque website at www.cityofdubugue.org/bids and which notice shall be published not less than thirteen but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 8th day of April 2021. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 19th day of April 2021, in the Historic Federal Building Council Chambers (and/or by virtual means), 350 West 6th Street, Dubuque, Iowa. Passed, adopted, and approved this 15th day of March 2021. �aILI Roy D. Buol, Mayor Attest: Nu", k' Adrienne Breitfelder, City Clerk CITY OF DUBUQUE, IOWA OFFICIAL NOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 2021 ASPHALT OVERLAY RAMP PROJECT3 NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, lowa will hold a public hearing on the proposed plans, specifications, form of contract, and estimated cost for the 2021 Asphalt Overlay Ramp Project 3, in accordance with the provisions of Chapter 26, Code of lowa at 6:00 p.m. on the 5t" day of April 2021, in the Historic Federal Building Council Chambers (and/or by virtual means), 350 West 6th Street, Dubuque, lowa. Said proposed plans, specifications, form of contract, and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Asbury Road Fiber Optic Collaboration — Phase 2 Project CIP# 1002877, PROJECT# 11X0001 This project will provide for the replacement of fifty-eight access ramps at 14 intersections in conjunction with the Public Works asphalt overlay program at the following locations: 1. Saint John Dr at Hillcrest Rd, one single and one double ramps. 2. Saint John Dr at Graham Cir. (South Intersection), four double ramps. 3. Saint John Dr at Westway Street, two single and one double ramps. 4. Graham Cir. At Westway Street, four double ramps. 5. Westway Street at Keyway Dr, one single and one double ramps. 6. Saint John Dr at Suzanne Dr, two single and one double ramps. 7. Saint John Dr at Graham Cir. (North Intersection), four double ramps. 8. Saint Celia Street at Graham Cir. (North Intersection), two single & one double ramps. 9. Saint Celia Street at Lisa Court, two single ramps. 10.Suzanne Dr at Westway Street, two single ramps. 11.Saint Celia Street at Westway Street, two single and two double ramps. 12.Saint Celia Street at Graham Cir. (South Intersection), two single ramps. 13.Saint Celia Street at Hillcrest Rd, two single ramps. 14.Graham Cir. at Graham Court, two single ramps. Copies of supporting documents for the public hearing are on file in the City Clerk's Office, City Hall, 50 W. 13t" St., Dubuque, lowa. To comply with social distancing mandates, documents can be viewed at https://www.cityofdubuque.orq/Aqendas or by contacting the City Clerk's Office at 563-589-4100. Written comments regarding the above public hearing should be submitted to the City Clerk's Office, 50 W. 13t" St., Dubuque, IA 52001, ctyclerk(c�cityofdubuque.orq, on or before said time of public hearing. At said time of public hearing all interested citizens and parties will be given an opportunity to submit online written comments for or against said proposal. Individuals with limited English proficiency, vision, hearing or speech impairments or requiring special assistance should contact the City Clerk's Office at (563) 589-4100, TDD/TTY (563) 690-6678, ctyclerk _cityofdubuque.orq as soon as feasible. Deaf or hard- of-hearing individuals can use Relay lowa by dialing 711 or (800) 735-2942. In the event that a meeting at the Historic Federal Building location is not possible as a result of the COVID-19 pandemic, instructions for a virtual meeting, and listening, viewing and public input options will be posted on the meeting agenda on Friday, April 2, 2021 at https://www.citvofdubuque.orq/aqendas. Published by order of the City Council given on the day of , 2021. Adrienne Breitfelder, City Clerk