2021 Asphalt Overlay Ramp Project 3 Copyrighted April 19, 2021 City of Dubuque Consent Items # 17. City Council Meeting ITEM TITLE: 2021 Asphalt Overlay Ramp Project 3 SUM MARY: City Manager recommending award of the construction contract to the low bidder, Midwest Concrete, Inc., in the amount of$148,018, which is 14.81% below the engineer's estimate. RESOLUTION Awarding the Public Improvement Contractforthe 2021 Asphalt Overlay Ramp Project SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type 2021 Asphalt Overlay Ramp Project 3-MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Bid Tab Supporting Documentation Dubuque THE CITY OF � ui-Aseria cih DuB E , . � . , � II � Maste iece on tj2e Mississi i zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2021 Asphalt Overlay Ramp Project 3 DATE: April 12, 2021 Sealed bids were received for the 2021 Asphalt Overlay Ramp Project 3. City Engineer Gus Psihoyos recommends award of the construction contract to the low bidder, Midwest Concrete, Inc., in the amount of $148,018, which is 14.81% below the engineer's estimate. I concur with the recommendation and respectfully request Mayor and City Council approval. � Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE CITY OF � All•Ameriea Ciq� Du B E �ti,�.,� : .. � I �I�'r � I Maste iece on the Mississi 1 zoo��zolztzois �P pp 2oi�*zoi9 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: April 12, 2021 RE: 2021 Asphalt Overlay Ramp Project 3 INTRODUCTION The attached resolution authorizes the award of the construction contract for the 2021 Asphalt Overlay Ramp Project 3. BACKGROUND Since 1990, the City of Dubuque has installed pedestrian access ramps around the City of Dubuque to conform with the American with Disabilities Act (ADA). The pedestrian access ramps allow people with mobility difficulties to access the City's sidewalk system. The design standards for these ramps have evolved over time as more ramps have been installed and standards have changed. Since 2011, The City of Dubuque has followed the "Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way." These are updated standards to use for facilities in the public right-of-way and addressed issues brought up since the original ADA standards were developed. The lowa Department of Transportation has adopted the PROWAG standards. The Federal Highway Administration (FHWA) has also adopted the standards and requires all cities that receive federal funding to follow these standards. DISCUSSION The 2021 Asphalt Overlay Ramp Project 3 will provide for the replacement of fifty-eight (58) access ramps at 14 intersections in conjunction with the Public Works Asphalt Overlay program at the following locations: 1. Saint John Dr at Hillcrest Rd, one single and one double ramps. 2. Saint John Dr at Graham Cir. (South Intersection), four double ramps. 3. Saint John Dr at Westway Street, two single and one double ramps. 4. Graham Cir. At Westway Street, four double ramps. 5. Westway Street at Keyway Dr, one single and one double ramps. 6. Saint John Dr at Suzanne Dr, two single and one double ramps. 7. Saint John Dr at Graham Cir. (North Intersection), four double ramps. 8. Saint Celia Street at Graham Cir. (North Intersection), two single & one double ramps. 9. Saint Celia Street at Lisa Court, two single ramps. 10.Suzanne Dr at Westway Street, two single ramps. 11.Saint Celia Street at Westway Street, two single and two double ramps. 12.Saint Celia Street at Graham Cir. (South Intersection), two single ramps. 13.Saint Celia Street at Hillcrest Rd, two single ramps. 14.Graham Cir. at Graham Court, two single ramps. PUBLIC ENGAGEMENT The Public Works Department mail letters to property owners and the Engineering Department have developed door hangers for residents notifying residents of the overlay and ramp project. BID RESULTS The City received bids on April 8, 2021, for the 2021 Asphalt Overlay Ramp Project 3. Midwest Concrete, Inc. of Peosta, lowa, submitted the low bid in the amount of $148,018.00. Which is 14.81% below the engineer's estimate. A summary of the bid proposals received is as follows: Contractor Bid Amount Midwest Concrete, Inc. $148,018.00 S&S Builders $188,170.50 Tschi frie Excavatin Com any $197,796.50 Eastern lowa Excavatin & Concrete, LLC $214,578.35 RECOMMENDATION I recommend awarding the contract for the 2021 Asphalt Overlay Ramp Project 3 to Midwest Concrete, Inc. in the low bid amount of $148,018.00 BUDGETIMPACT The estimate of probable costs for the 2021 Asphalt Overlay Ramp Project 3 is as follows: Description Estimate Award Construction $ 173,757.00 $148,018.00 Contingency 17,375.00 17,375.00 Engineering Design and Administration 38,226.00 38,226.00 Total Construction Cost Estimate $ 229,358.00 $203,619.00 The funding summary is as follows: CIP Fund Descri tion Fund Amount 3001227 Curb Ramp Program $ 203,619.00 2 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the construction contract for the 2021 Asphalt Overlay Ramp Project 3 to Midwest Concrete, Inc. in the low bid amount of $148,018.00. GNP/kb cc: John Klostermann, Public Works Director Jon Dienst, Civil Engineer II 3 Prepared by Kerry Bradley City of Dubuque Engineering 50 W 1311 St Dubuque, Iowa 52001 (563)589-4270 Return to Adrienne N. Breitfelder City of Dubuque City Clerk 50 W 13th St Dubuque, Iowa 52001 (563)589-4100 RESOLUTION NO. 118-21 AWARDING THE PUBLIC IMPROVEMENT CONTRACT FOR THE 2021 ASPHALT OVERLAY RAMP PROJECT 3 NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Whereas, sealed proposals have been submitted by contractors for the 2021 Asphalt Overlay Ramp Project 3, (the Project) pursuant to Resolution No. 75-21 and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 19th day of March 2021. Whereas, said sealed proposals were opened and read on the 8th day of April 2021 and it has been determined that Midwest Concrete, Inc. of Peosta, Iowa, with a low bid in the amount of $148,018.00 is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Midwest Concrete, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, adopted, and approved this 19th day of April 2021. �1' 4'e Roy D. Buol, Mayor Attest: A" //, 2 Adrienne N. Breitfelder, City Clerk THE CITY OF DuB E Masterpiece on the Mississippi City of Dubuque,lowa Bid Tabulation Project Name: 2021 Asphalt Overlay Curb Ramp Project 3 B�d Date Engineer's Estimate Midwest Concrete S&S Builder Tschiggfrie Excavating Eastern lowa Excavating 8-Apr-21 NOE R NUMBER E BID ITEM DESCRIPTION Q�ANTNTY UNIT UN PRICE TOTAL PRICE UNI T RICE TOTAL PRICE UNIT RICE TOTAL PRICE UNI T RICE TOTAL PRICE UNIT RICE TOTAL PRICE Division 2010-Earthwork,Subgrade,and Subbase 1 2010-108-D-3 Topsoil,Off-site 60.3 CY $ 75.00 $ 4,522.50 $ 45.00 $ 2,713.50 $ 75.00 $ 4,522.50 $ 65.00 $ 3,919.50 $ 55.50 $ 3,346.65 2 2010-108-E-0 Excavation,Class 10 162 CY $ 60.00 $ 9,720.00 $ 25.00 $ 4,050.00 $ 60.00 $ 9,720.00 $ 36.00 $ 5,832.00 $ 42.35 $ 6,860.70 3 2010-108-I-0 Subbase,Special Backfill-Gradation 30 340 TON $ 22.00 $ 7,480.00 $ 25.00 $ 8,500.00 $ 22.00 $ 7,480.00 $ 25.00 $ 8,500.00 $ 31.85 $ 10,829.00 Sub Total $ 21,722.50 Sub Total # $ 15,263.50 Sub Total # $ 21,722.50 Sub Total # $ 18,251.50 Sub Total # $ 21,036.35 Division 7010-Portland Cement Concrete Pavement 4 7010-108-A-0 Pavement,PCC,6"(Thickness) 5 SY $ 38.00 $ 190.00 $ 65.00 $ 325.00 $ 78.00 $ 390.00 $ 95.00 $ 475.00 $ 120.50 $ 602.50 5 7010-108-E-0 Curb and Gutter,30"(Width),6"(Thickness) 1145 LF $ 30.00 $ 34,350.00 $ 25.00 $ 28,625.00 $ 38.00 $ 43,510.00 $ 44.00 $ 50,380.00 $ 36.00 $ 41,220.00 6 7010-108-F-0 Beam Curb 5 LF $ 26.00 $ 130.00 $ 25.00 $ 125.00 $ 35.00 $ 175.00 $ 76.00 $ 380.00 $ 95.00 $ 475.00 7 7010-108-A-0 Pavement,PCC,8"(Thickness) 25.7 SY $ 125.00 $ 3,212.50 $ 85.00 $ 2,184.50 $ 120.00 $ 3,084.00 $ 120.00 $ 3,084.00 $ 85.00 $ 2,184.50 Sub Total $ 37,882.50 Sub Total $ 31,259.50 Sub Total $ 47,159.00 Sub Total $ 54,319.00 Sub Total $ 44,482.00 Division 7030-Sidewalks,Shared Use Paths,and Driveways 8 7030-108-A-0 RemovalofSidewalk 738 SY $ 21.00 $ 15,498.00 $ 10.00 $ 7,380.00 $ 18.00 $ 13,284.00 $ 16.00 $ 11,808.00 $ 36.75 $ 27,121.50 9 7030-108-E-0 PCC,Sidewalk,4"(Thickness) 552 SY $ 50.00 $ 27,600.00 $ 50.00 $ 27,600.00 $ 60.00 $ 33,120.00 $ 69.00 $ 38,088.00 $ 50.00 $ 27,600.00 10 7030-108-E-0 PCC,Sidewalk,6"(Thickness) 214 SY $ 66.00 $ 14,124.00 $ 70.00 $ 14,980.00 $ 70.00 $ 14,980.00 $ 91.00 $ 19,474.00 $ 83.50 $ 17,869.00 11 7030-108-G-0 Detectable Warning 448 SF $ 40.00 $ 17,920.00 $ 40.00 $ 17,920.00 $ 40.00 $ 17,920.00 $ 38.00 $ 17,024.00 $ 41.00 $ 18,368.00 Sub Total $ 75,142.00 Sub Total $ 67,880.00 Sub Total $ 79,304.00 Sub Total $ 86,394.00 Sub Total $ 90,958.50 Division 7040-Pavement Rehabilitation 12 7040-108-H-0 Pavement-Removal 270 SY $ 25.00 $ 6,750.00 $ 10.00 $ 2,700.00 $ 25.00 $ 6,750.00 $ 18.00 $ 4,860.00 $ 22.00 $ 5,940.00 13 7040-108-I-0 CurbandGutter-Removal 1145 LF $ 11.00 $ 12,595.00 $ 10.00 $ 11,450.00 $ 15.00 $ 17,175.00 $ 12.00 $ 13,740.00 $ 16.00 $ 18,320.00 14 7040-108-I-0 Curb and Gutter-Removal 5 LF $ 11.00 $ 55.00 $ 1.00 $ 5.00 $ 15.00 $ 75.00 $ 12.00 $ 60.00 $ 30.00 $ 150.00 Sub Total $ 19,400.00 Sub Total # $ 14,155.00 Sub Total # $ 24,000.00 Sub Total # $ 18,660.00 Sub Total # $ 24,410.00 IDOT Division 2528-Treffic Control 15 IDOT2528.04-A TrafficControl 1 LS $ 4,000.00 $ 4,000.00 $ 3,500.00 $ 3,500.00 $ 1,450.00 $ 1,450.00 $ 1,700.00 $ 1,700.00 $ 1,750.00 $ 1,750.00 Sub Total $ 4,000.00 Sub Total # $ 3,500.00 Sub Total # $ 1,450.00 Sub Total # $ 1,700.00 Sub Total # $ 1,750.00 IDOT Division 2524-Treffic Signing 16 Existing Sign,Remove 7 EA $ 100.00 $ 700.00 $ 50.00 $ 350.00 $ 150.00 $ 1,050.00 $ 120.00 $ 840.00 $ 95.00 $ 665.00 Sub Total $ 700.00 Sub Total # $ 350.00 Sub Total # $ 1,050.00 Sub Total # $ 840.00 Sub Total # $ 665.00 Division 9010-Seeding 17 9010-108-A-0 Conventional-Seeding,Type 1 4910 SF $ 1.00 $ 4,910.00 $ 1.00 $ 4,910.00 $ 1.00 $ 4,910.00 $ 1.20 $ 5,892.00 $ 2.65 $ 13,011.50 Sub Total $ 4,910.00 Sub Total # $ 4,910.00 Sub Total # $ 4,910.00 Sub Total # $ 5,892.00 Sub Total # $ 13,011.50 Division 9072-Combined Concrete Sidewalk and Retaining Wall 18 9072-108-A-0 Combined Concrete Sidewalk and Retaining Wall 5 SF $ 100.00 $ 500.00 $ 75.00 $ 375.00 $ 115.00 $ 575.00 $ 120.00 $ 600.00 $ 118.00 $ 590.00 Sub Total $ 500.00 Sub Total # $ 375.00 Sub Total # $ 575.00 Sub Total # $ 600.00 Sub Total # $ 590.00 Division 6010-Structures for Sanitary and Storm Sewers 19 6010-108-E-0 Manhole Adjustment,Minor 1 EA $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 620.00 $ 620.00 $ 525.00 $ 525.00 Sub Total $ 500.00 Sub Total # $ 500.00 Sub Total # $ 500.00 Sub Total # $ 620.00 Sub Total # $ 525.00 Division 11,010-Construction Survey 20 11010-108-B-0 Monument Preservation and Replacement 1 LS $ 5,000.00 $ 5,000.00 $ 2,325.00 $ 2,325.00 $ 1,500.00 $ 1,500.00 $ 520.00 $ 520.00 $ 2,650.00 $ 2,650.00 Sub Total $ 5,000.00 Sub Total # $ 2,325.00 Sub Total # $ 1,500.00 Sub Total # $ 520.00 Sub Total # $ 2,650.00 Division 11,020-Mobilization 21 11020-108-A-0 Mobilization 1 LS $ 4,000.00 $ 4,000.00 $ 7,500.00 $ 7,500.00 $ 6,000.00 $ 6,000.00 $ 10,000.00 $ 10,000.00 $ 14,500.00 $ 14,500.00 Sub Total $ 4,000.00 Sub Total # $ 7,500.00 Sub Total # $ 6,000.00 Sub Total # $ 10,000.00 Sub Total # $ 14,500.00 Total Est. $ 173,757.00 Total Bid $ 148,018.00 Total Bid $ 188,170.50 Total Bid $ 197,796.50 Total Bid $ 214,578.35 %Over/Under(-) -14.81% 8.30% 13.84% 23.49% Total Bid Amount $ 173,757.00 $ 148,018.00 $ 188,170.50 $ 197,796.50 $ 214,578.35 Total Selected Alternate(s)Amount $ - $ - $ - $ - $ -