Loading...
Acceptance of the City Hall Sidewalk Heating Boilers and Sensor SystemCopyrighted May 3, 2021 City of Dubuque Consent Items # 14. City Council Meeting ITEM TITLE: Acceptance of the City Hall Sidewalk Heating Boilers and Sensor System SUMMARY: City Manager recommending acceptance of the construction contract for the City Hall Sidewalk Heating Boilers and Sensor System, as completed by Portzen Construction, in the final contract amount of $77,106. RESOLUTION Accepting the City Hall Sidewalk Heating Boilers and Sensor System and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type City Hall Sidewalk Heating Boilers and Sensor System- City Manager Memo MVM Memo Staff Memo Resolution Staff Memo Resolutions THE C Dubuque DUUB-.-*.-TE *Awiu Ciq ' iece on the Mississippi Masterpiece PP zoo�•zoi 2-2013 zoi7*2019oi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Acceptance of the City Hall Sidewalk Heating Boilers and Sensor System DATE: April 28, 2021 Assistant City Engineer Bob Schiesl is recommending acceptance of the construction contract for the City Hall Sidewalk Heating Boilers and Sensor System, as completed by Portzen Construction, in the final contract amount of $77,106. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer THE C DUUB_-"*__TE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer DATE: April 27, 2021 Dubuque All -America CiW IWTiCNN' LUVI(; 11-N]JF 2007-2012.2013 2017*2019 RE: Acceptance of the City Hall Sidewalk Heating Boilers and Sensor System INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the City Hall Sidewalk Heating Boilers and Sensor System. BACKGROUND The exterior concrete sidewalk and stairs around City Hall have an embedded snowmelt system. In 2019, the three (3) 200,000 BTU hot water heaters for the snow melt system were nearing the end of their serviceability and no longer complied with State of Iowa code and needed to be replaced. DISCUSSION The sidewalk heating system project provided for the removing the old hot water boilers and replacing with new, state of the art, heat exchanger boilers that are connected in series for improved, higher efficiency. The new heat exchanger boilers connect to an existing distribution manifold system which connect to a polymer closed loop tubing hydronic sidewalk snowmelt system embedded in the exterior concrete sidewalk and stairs around City Hall. The new sidewalk heating system project also provided for the installation a new automated control with exterior temperature and precipitation moisture sensory system with remote activation ability. The City Hall Sidewalk Heating Boilers and Sensor System was completed by Portzen Construction, Inc. of Dubuque, Iowa in the final contract amount of $77,106.00. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $77,106.00 to Portzen Construction, Inc. for the City Hall Sidewalk Heating Boilers and Sensor System. BUDGETIMPACT The project cost summary for the City Hall Sidewalk Heating Boilers and Sensor System is summarized below: Description Award Final Project Costs $ 77,106.00 $ 77,106.00 Total Construction Cost $ 77,106.00 $ 77,106.00 The project funding is summarized as follows: CIP No. Fund Description Fund Amount 3502803 City Hall Boiler $ 67,260.00 3502803 City Hall Remodeling 9,846.00 Total Project Funding $ 77,106.00 REQUESTED ACTION The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $77,106.00 to Portzen Construction, Inc. for the City Hall Sidewalk Heating Boilers and Sensor System. cc: Cori Burbach, Acting Building Services Manager Prepared by Kerry Bradley City of Dubuque Engineering 50 W. 1311 St Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13'" St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 138-21 ACCEPTING THE CITY HALL SIDEWALK HEATING BOILERS AND SENSOR SYSTEM AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the City Hall Sidewalk Heating Boilers and Sensor System, (the Project) has been completed by the Contractor, Portzen Construction, Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $77,106.00; WHEREAS, the Contractor has previously been paid $69,395.40, leaving a balance of $7,710.60; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $7,710.60 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 31d day of May 2021. - 2 �)' 4-,/) Roy D. uol, Mayor Attest: Adrienne N. Breitfelder, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF CITY HALL SIDEWALK HEATING BOILERS AND SENSOR SYSTEM The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the City Hall Sidewalk Heating Boilers and Sensor System has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $77,106.00. Dated this 27t" day of April 2021. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 27tt' day of April 2021. Adrienne N. Breitfelder, City Clerk