Clarke Drive Fiber Project from Asbury Road to North GrandviewCopyrighted
June 21, 2021
City of Dubuque Consent Items # 24.
City Council Meeting
ITEM TITLE: Clarke Drive Fiber Project from Asbury Road to North Grandview- CIP
1002871
SUMMARY: City Manager recommending acceptance of the construction contract for
the Clarke Drive Fiber Project from Asbury Road to North Grandview
Avenue, as completed by Advanced Directional Drillers, in the final
contract amount of $88,781.00.
RESOLUTION Accepting the Clarke Dr Fiber from Asbury Rd to N.
Grandview Project and authorizing the payment to the contractor
SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s)
DISPOSITION:
ATTACHMENTS:
Description Type
Clarke Drive Fiber Project-MVM Memo City Manager Memo
Staff Memo
Resolution
Staff Memo
Resolutions
THE C
Dubuque
DUUB-.-*.-TE
*Awiu Ciq
'
iece on the Mississippi
Masterpiece PP
zoo�•zoi 2-2013
zoi7*2019oi9
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Clarke Drive Fiber Project from Asbury Road to North Grandview
CIP 1002871
DATE: June 11, 2021
City Engineer Gus Psihoyos is recommending acceptance of the construction contract
for the Clarke Drive Fiber Project from Asbury Road to North Grandview Avenue, as
completed by Advanced Directional Drillers, in the final contract amount of $88,781.00.
This is an increase from the original contract amount of $71,005.25 due to increased
footage, vaults, concrete replacement and traffic control.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Micl4ael C. Van Milligen
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
THE CITY OF
DUB E
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
SUBJECT: Clarke Dr. Fiber Project from Asbury Rd. to N. Grandview
CIP 1002871
DATE: June 10, 2021
INTRODUCTION
Dubuque
All -America City
2007*2012.2013
2017*2019
The enclosed resolution provides for the acceptance of the construction contract for the
Clarke Dr. Fiber Project from Asbury Rd. to N. Grandview Ave.
BACKGROUND
The Clarke Dr. Fiber optics — N. Grandview Ave. to Asbury Rd. provides connection
between future bores along Asbury Rd. and Clarke Dr. These fiber bores are completed
with Alliant Energy. These locations allow us to have a connection in an area in the City
of Dubuque that has not been accessible. This bore connects to the existing fiber on
Asbury Rd that will continue to the City of Dubuque limits and to Clarke Dr.
DISCUSSION
The project consisted of the boring of 3,455 linear feet of a joint package of fiber duct for
the City of Dubuque and Alliant Energy. This route is along Clarke Drive from N.
Grandview Ave. to Asbury Rd. with a branch down Asbury Rd. from Hillcrest to St.
Ambrose St. The construction included a fiber package of 7-way Futurepath for the City,
(2) 2" duct for the City, and (2) 1.25" for Alliant. In preparation for future partnerships,
one (1) of the 2" ducts that the City put in along this route could be bought or leased by
other telecommunication providers. The project was over the awarded amount due to
additions/modifications of the bore path which included more length of duct and
additional vaults. The amount was also over due to traffic control and concrete since it
was not apart of the bid. Since the project is joint with Alliant Energy, the cost is split
and any changes were discussed with them, as well.
The Clarke Drive Fiber Project from Asbury Road to N. Grandview Avenue was
completed by Advanced Directional Drillers of Dubuque, Iowa in the final contract
amount of $88,781.00. This is an increase from the original contract amount of
$71,005.25. This increase is due to increased footage, vaults, concrete replacement,
and traffic control.
RECOMMENDATION
I recommend that the City Council accept the improvements and authorize the payment
of the contract amount of $88,781.00 to Advanced Directional Drillers for the Clarke Dr.
Fiber Project from Asbury Rd. to N. Grandview Ave. Project.
BUDGETIMPACT
The project cost summary for the Clarke Dr. Fiber Project from Asbury Rd. to N.
Grandview Ave. Project is summarized below:
Description
Award
FINAL
Construction Contract
$71,005.25
$88,781.00
Contingency
$7,100.53
$0.00
Design / Contract Admin / Construction Engineering
$11,715.87
1 $11,715.87
Total Project Cost
$89,821.65
$100,496.87
The project funding summary is as follows:
CIP
Funding Source
Amount
1002871
Alliant Energy Broadband
$100,496.87
Available Project Funding
$100,496.87
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution to accept the
improvements and to authorize the payment of the contract amount of $88,781.00 to
Advanced Directional Drillers for the Clarke Dr. Fiber Project from Asbury Rd. to N.
Grandview Ave. Project.
cc: Justine Hull, Traffic Engineer
Dave Ness, Civil Engineer II
Prepared by: Justine Hull City of Dubuque Engineering 50 W. 13" Street Dubuque IA 52001 (563)589 4270
Return to. Adrienne N. Breitfelder, City Clerk, 50W 131h Street, Dubuque, IA 52001 (563)589-4100
RESOLUTION NO. 205-21
ACCEPTING THE CLARKE DR FIBER FROM ASBURY RD TO N. GRANDVIEW
PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR
WHEREAS, the public improvement contract for the Clarke Dr. Fiber from Asbury
Rd. to N. Grandview Ave. Project, (the Project) has been completed by the Contractor,
Advanced Directional Drillers, (Contractor), the City Engineer has examined the work and
recommends that the Project be accepted; and
WHEREAS, the final contract amount for the Project is $88,781.00;
WHEREAS, the Contractor has previously been paid $84,341.45, leaving a
balance of $4,439.05; and
WHEREAS, the City Council finds that the recommendation of the City Engineer
should be accepted.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved, and the
Project is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor the
balance of the retainage of $4,439.05 as provided in Iowa Code chapter 573, and to pay
such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code
chapter 26.13.
Passed, approved and adopted this 21 st day of June 2021.
Danny C pr nk, Mayor Pro Tem
Attest:
gA�'� //I. A��"
Adrienne N. Breitfelder, City Clerk
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF CLARKE DR FIBER
FROM ASBURY RD TO N. GRANDVIEW PROJECT
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the Clarke Dr. Fiber from Asbury Rd. to N. Grandview Ave. Project
has been performed in compliance with the terms of the Public Improvement Contract,
and that the total cost of the completed work is $100,496.87.
Dated this 10th day of June 2021.
Gus Psihoyos, City Engineer
Filed in the office of the City Clerk on the 10th day of June 2021.
a 7/1