Fire Station 6 External Stairwell Addition Project: Award Construction ContractCity of Dubuque City Council Meeting Consent Items # 27. Copyrighted June 21, 2021 ITEM TITLE: Fire Station 6 External Stairwell Addition Project: Award Construction Contract CIP: 350-2706 SUMMARY: City Manager recommending award of the construction contract to the low bidder, Reed Construction, in the base bid amount of $280,000, which is 19.1 % below the engineer's estimate. RESOLUTION Awarding the Public Improvement Contract for the Fire Station 6 External Stairwell Addition Project SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Fire Station 6 External Stairwell Addition Project-MVM City Manager Memo Memo Staff Memo Resolution Staff Memo Resolutions Letter of Recommendation Supporting Documentation THE CITY OF DUUB-.-*.-TE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Fire Station 6 External Stairwell Addition Project Award Construction Contract CIP: 350-2706 DATE: June 17, 2021 Dubuque *Amrin CHY 2007-2012-2013 2017*2019 Sealed bids were received for the Fire Station 6 External Stairwell Addition Project. Project Manager Steve Sampson Brown recommends award of the construction contract to the low bidder, Reed Construction, in the base bid amount of $280,000, which is 19.1 % below the engineer's estimate. I concur with the recommendation and respectfully request Mayor and City Council approval. Micl4ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brurnwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Steve Sampson Brown, Project Manager THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Steve Sampson Brown, Project Manager SUBJECT: Fire Station 6 External Stairwell Addition Project Award Construction Contract CIP: 350-2706 DATE: June 14, 2021 INTRODUCTION Dubuque M[AmedcaCib 2007-2012-2013 2017*2019 The attached resolution authorizes the award of the construction contract for the Fire Station 6 External Stairwell Addition Project. BACKGROUND Fire Station 6 is a three-story structure that comprises of an apparatus truck bay and kitchen on the ground floor, living quarters and office space on the second floor, and a restricted height basement. The only access between the ground floor and the second floor is a wooden internal staircase that is original to the building which was built in 1906. The original staircase has begun to separate at the second -floor level and is becoming structurally unstable. DISCUSSION In 2017 the Fire Department contracted with IN Engineers, Architects, Surveyors P.C. of Dubuque, IA (I IW) to conduct a facility needs assessment for Fire Station 6. The results of that assessment were completed in 2018 which indicated the internal stairwell was in need of replacement. Based on the results of the assessment, IN was hired to design the replacement of the staircase. After consideration of several alternatives and the current and future needs of the fire station, a design option was selected to remove the internal staircase and replace it with an enclosed set of external stairs on northeast side of the station. This alternative has several benefits: • By removing the internal staircase, critically needed additional equipment storage space is created on the first floor. • The current hose drying tower which can only be accessed via the kitchen area will be relocated to the new external stair tower. • Direct access to the basement from the exterior of the building will be created. Page 1 of 3 BID RESULTS The City received bids on June 9, 2021, for the Fire Station 6 External Stairwell Addition Project. Reed Construction of DeWitt, Iowa submitted the low bid in the amount of $280,000.00. Which is 19.1 % below the engineer's estimate. Due to the rapidly rising cost of lumber, bid alternate #1 allowed bidders to use cold formed metal studs instead of wood. Since no savings was realized from the bid alternate, the basis of award is the base bid only. A summary of the bid proposals received is as follows: Contractor Base Bid Alternate Total Bid Reed Construction $280,000.00 0.00 $280,000.00 Portzen Construction, Inc. $397,000.00 $22,000.00 $397,000.00 Tricon Construction $446,000.00 $11,000.00 $446,000.00 RECOMMENDATION I recommend awarding the contract for the Fire Station 6 External Stairwell Addition Project to Reed Construction in the total low bid amount of $280,000.00 BUDGETIMPACT The estimate of probable cost for this project is summarized as follows: PROJECT COSTS ESTIMATE AWARD Construction Hard Costs Construction Contract — Base Bid $346,000.00 $280,000.00 Contingency (10%) $34,600.00 34,600.00 Total - Bid Project Cost $380,600.00 $314,600.00 Project Soft Costs Engineering/Architect Design & Construction Admin. Fees $10,000.00 $10,000.00 Reimbursable Expenses $2,000.00 $2,000.00 City Staff Administration & Const. Inspection Fees $2,500.00 $2,500.00 Total — Project Soft Costs $14,500.00 $14,500.00 TOTAL PROJECT COST $395,100.00 $329,100.00 Page 2 of 3 The funding summary for the Fire Station 6 External Stairwell Addition Project is as follows: CIP Funding Source Amount 102/350-2706 Structural Repairs at Stations 5 & 6 $462,662.00 Total Available Project Funding $462,662.00 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the construction contract for the Fire Station 6 External Stairwell Addition Project to Reed Construction of DeWitt, Iowa in the low bid amount of $280,000.00. SSB\ssb cc: Gus Psihoyos, City Engineer Rick Steines, Fire Chief F:\PROJECTS\Fire Station No. 6 - Existing Building Evaluation - Stair Tower\City Council Documentation\l—Award\FS6 External Stairwell Addition - Initiate Bid Merno2021.docx Page 3 of 3 Prepared by Kerry Bradley City of Dubuque Engineering 50 W 1311 St Dubuque, Iowa 52001 (563)589-4270 Return to Adrienne N. Breltfelder City of Dubuque City Clerk 50 W 13th St Dubuque, Iowa 52001 (563)589-4100 RESOLUTION NO. 208-21 AWARDING THE PUBLIC IMPROVEMENT CONTRACT FOR THE FIRE STATION 6 EXTERNAL STAIRWELL ADDITION PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Whereas, sealed proposals have been submitted by contractors for the Fire Station 6 External Stairwell Addition Project, (the Project) pursuant to Resolution No. 172-21 and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 21st day of May 2021. Whereas, said sealed proposals were opened and read on the 9th day of June 2021 and it has been determined that Reed Construction of DeWitt, Iowa, with a low bid in the amount of $280,000.00 is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Reed Construction and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, adopted, and approved this 21st day of June 2021. Danny G/Sp`rUnk, Mayor Pro Tern Attest: e7 0 Adrienne N. Breitfelder, Cit , Clerk y 0 0 origin design' June`15,2021 Steve Brown City of Dubuque 50 West 13 1h Street Dubuque, IA 52001 Re: City of Dubuque, Iowa Fire Station 6 External Stairwell Addition Project CIP # 350-2706 Bid Results Project No.: 19038 Dear Steve: In accordance with the Advertisement for Bids for Public Improvement Project, Fire Station 6 External Stairwell Addition, (3) project bids were opened and read at 2:05 p.m. on June 9, 2021. A tabulation of the bids is enclosed. After reviewing the bids, it was determined the low bid was submitted by Reed Construction. The lump sum base bid amount is $280,000.00. We have confirmed with the apparent low bidder they are able to complete the work outlined in the drawings and specifications in the timeline set forth in the project specifications. They have successfully completed other projects of similar size and complexity. With this information, we recommend award of the contract to Reed Construction, located in Dewitt, Iowa in the amount of $280,000.00. The engineer's estimate for this project was $348,000. The low bid of $280,000.00 is $68,000 or 20% below the engineer's estimate. Since this is a renovation project, we recommend that the city budget for a construction contingency of 10% of the bid amount, or $28,000.00. Please let us know if the City plans to award the contract and wants Origin Design Co. to prepare and send contract documents to Reed Construction. Sincerely, Origin Design Co. Eric Helminiak, PE, SE, LEED AP Structural Team Leader Enclosure: City Bid Tab DUBUQUE OFFICE 4155 Pernsylvania Averue Dubuque, Iowa 52002 origindesign.com 800 556-4491 THE CITY OF ]D!Uj- B E Masterpiece on the Mississippi BID TABULATION SUMMARY SHEET LUMP SUM BID Project: FS6-Ext Stairwell Addition Location: Conference Room B, City Hall, Date: Wednesday, June 9, 2021 Time: 2:05 PM CIP No.: 350-2706 Bid Company Bid Bond 10% Section 00450 Bidder Status Form Section 00460 Contractor Background Infromation Section 00470 OR 00471 Addendums 1 Section 0040 1.10 Base Bid Section 00401.4 Alternate 1 Basis of Award Base Bid + Alt's 0+0 (Cold Formed Metal Framing) Section 00401.5 1 1�? ye �2 -317)0(20 +,1 z Z, 0,9C) $0.00 2 Ll ie �2 y t fz Y:!EI-15 z- ooO o,6(? $0.00 3 Tfll�- n-V ('�)/v St t�� ec'i NLI(O� 000 4-11) 0004X $0.00 4 $0.00 5 $0.00 6 $0.00 7 $0.00 8 $0.00 9 $0.00 10 $0.00